Information

  • DA/CDC/CC Number

  • Client / Site

  • Location
  • Conducted on

  • Health and Building Surveyor

1. Ongoing Matters for Builder/Contractor Checklist

  • 1.1. Builder's sign

  • 1.2. Sediment and erosion controls

  • 1.3. Rubbish control

  • 1.4. Protection of public space by fence or hoarding

  • 1.5. Protection and support of adjoining buildings

  • 1.6. Builder's toilet

2. Health and Building Surveyors Checklist

  • 2.1. External Lines under-water test

  • 2.2. Location in relation to footings/slab

  • 2.3. Within boundary of allotment

  • 2.4. Not in easements

  • 2.5. Filled ground

  • 2.6. Correct grade

  • 2.7. Sufficient cover/depth

  • 2.8. Approved material

  • 2.9. Bedding, side support, overlay

  • 2.10. Jointing and direction of laying

  • 2.11. External Drainage plan provided by plumber

  • 2.12. Connection of all internal pipes (check recorded layout)

  • 2.13. Licensed plumber

  • 2.14. Application paid for

  • 2.15. Plumber on site - name

  • 2.16. Soffit requirements

  • 2.17. Wall penetrations sealed

  • 2.18. Gully height to finished ground level/floor level

  • 2.19. Venting

  • 2.20. Concrete base support - gully and shaft

  • 2.21. Provision of inspection openings

  • 2.22. Point of connection exposed

  • 2.23. Use of provided junction

  • 2.24. Separation from other services

  • 2.25. Sticker left

3. Comments

  • 3.1. Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.