Information

  • DA/CDC/CC Number

  • Client / Site

  • Location
  • Conducted on

  • Health and Building Surveyor

1. Ongoing Matters for Builder/Contractor Checklist

  • 1.1. Restricted access

  • 1.2. Builder's sign

  • 1.3. Sediment and erosion controls

  • 1.4. Rubbish control

  • 1.5. Builder's toilet

  • 1.6. Protection of public space by fence or hoarding

  • 1.7. Protection and support of adjoining buildings

2. Previous Inspections carried out

  • 2.1. Site inspection

  • 2.2. Internal drainage

3. Health and Building Surveyor's Checklist

  • 3.1. Position in relation to approval

  • 3.2. Foundation/bearing/no loose material

  • 3.3. Subsoil drainage

  • 3.4. Footing dimensions

  • 3.5. Reinforcement type

  • 3.6. Stepped for sewer pipes

  • 3.7. Height pegs

  • 3.8. Existing stormwater/sewer

  • 3.9. Pier to invert of sewer/stormwater pipes

  • 3.10. Reinforcement lap/cover on chairs

  • 3.11. In accordance with details

  • 3.12. Pipe penetration protected

  • 3.13. Membrane provided

  • 3.14. In accordance with Engineer's Details

  • 3.15. Steel cover

  • 3.16. Piered to natural ground

  • 3.17. Trenches clear of water

  • 3.18. Expansion joints

  • 3.19. Formwork support

  • 3.20. Builder on site

  • 3.21. Sticker left on site

  • 3.22. Consolidation of fill material

  • 3.23. Height of fill, particularly elevated slabs

  • 3.24. Termite protection (slabs)

4. Comments

  • 4.1. Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.