Information
-
Site conducted
-
Project Name
-
Location
-
Date and time site inspection conducted
Prepared by: Grant Baillie
-
Additional Participants
Template Revision 01/ Revised 1st August 2016
ACCESS / EGRESS
-
Public areas clean and free of trip hazards
-
Project access and egress points clear and free of materials
-
Relevant signage in place to identify access points
-
Evacuation route signage at key locations for easy identification
-
Vehicle and plant access unobstructed
-
Emergency exit points clear of plant and materials
PORTABLE TOOLS AND EQUIPMENT
-
Guards in place and functional
-
Equipment as manufactured - nil modifications observed
PLANT
-
Daily pre-start inspections completed and documented
-
Operating instructions manual available
-
Plant serviced with supporting documentation available.
-
Plant appears to be in sound condition
-
Cab clean and tidy
-
Air compressor- retaining devices used on hose couplings i.e. safety clips, wire ropes, chains
-
Ladders and platforms rated industrial and in sound condition
CRANE & DROP ZONES ( & MOBILE PUMPS) ACTIVITIES
-
As applicable to task- Drop/lifting zone and crane area delineated with barricading and signage. I.E. Structural steel erection, Crane erection, Precast concrete
-
Lifting slings, chains, devices show no sign of damage and carry annual inspection (Or recorded on plant register)
-
SWL marked on equipment
-
Equipment storage off ground and protected
EMPLOYEE CONDUCT
-
Employees compliant with site PPE requirements
-
Employee maintaining a clean area (housekeeping)
-
Tools being used are correct for the job and used correctly
-
Workers not exposing themselves to a hazard without controls, As observed
ELECTRICAL
-
Power distribution board location clear of hazards and obstructions
-
Current quarterly inspection tags on electrical tools and leads
-
As observed electrical appliances isolated and unplugged before changing blades or discs
-
All portable socket outlet devices contain an RCD (Double adapters, office power boards are not permitted for construction activities)
-
Extension lead protected from hazards (hung on non conductive device, in conduit or similar)
-
Lead connection plugs bonded type or transparent type following repair
-
Extension leads do not exceed 25m in length (1.5mm cable can be 35m)
-
Extension leads not joined to exceed the extension lead maximum allowable length
TRAFFIC MANAGEMENT
-
Traffic controller has a copy of the TMP and associated approved Council and Police permits
-
Traffic signs in place and appropriate for public roads in accordance with the TMP
-
Traffic barricades erected for vehicle and pedestrian segregation around heavy vehicle movements
GENERAL SITE CONDITIONS
-
Temporary fence and hoardings rigid and secure
-
Star Pickets, Reo bars, sharp objects capped/protected
-
Tasks generate excessive noise sign posted for PPE requirement
-
Materials stacked in a stable position
EXCAVATION
-
Excavations over 1.5m deep must comply with SWMS
-
Control in place to prevent workers standing on excavation edges with a drop over 2m
-
Excavations over 1.5m deep are shored, battered, benched, or has geo-tech report to confirm stability
SCAFFOLDING
-
Scaffold components match the designed scaffold (components from other scaffolds not mixed in)
-
Scafftag or Scaffold complete signs fitted at all main access points
-
Scafftag identifies an inspection within the last 30 days (or documented in safety office)
-
All components fitted I.E. Hand/mid rails, toe boards, mesh/perimeter screening, bracing etc.
-
All platforms fully planked and lap boards secured from uplift
-
Scaffold workers not exposed to falls over 2m
-
Access ladders fixed within the scaffold (ladders fixed externally not permitted)
-
Exclusion zone around scaffold erection and dismantle activities
-
No extension for stepladders used for scaffold access
-
All sharp protrusions covered or protected
HAZARDOUS SUBSTANCES
-
All hazardous substances must have up-to-date MSDS available
-
Hazardous substances must be stored and used in accordance with the MSDS
Task Observation
-
Trade Assessed?
- Drainer
- Concretor
- Carpenter
- Electrician
- Plumber
- Roofer
- Plasterer
- Painter
- Cabinet Maker
- Tiler
- Other
-
Task Observed?
-
SWMS confirmed as current and relevant?
-
Trade Working in accordance with SWMS?
ENVIRONMENTAL
-
WATER
-
Concrete wash areas maintained with no water released to storm water or sewer
-
Water and slurry from concrete cutting activities contained
-
Painter and plasterer washout and sediment traps maintained
-
NOISE AND VIBRATION
-
All activities performed inside the DA approved hours
-
AIR QUALITY
-
Loads with soil or waste covered prior to leaving site
-
Concrete or masonry cutting / grinding controlled with water or vacuum
-
Dust suppression implemented for general construction activities as required
-
WASTE
-
Construction waste bins serviced and accessible
-
Regulated waste segregated from general waste
-
FLORA AND FAUNA
-
Are flora and fauna protection devices maintain and effective
Template Revision 01/ Revised 1st August 2016
Inspection close out
INSPECTORS COMPLETION
-
Inspector comments
-
undefined
-
Name and Signature
THE PROJECT MANAGER VERIFICATION OF CLOSED OUT
-
The Project Manager shall ensure items are actioned and closed out in accordance with the compliance rating.
Class 1 ( high risk )- Closed out immediately, or action taken to prevent incident
Class 2 ( medium risk )- Closed out in 24 hours, with action taken to prevent incident
Class 3 ( low risk )- Closed out in 5 days, with action taken to prevent incident -
VERIFICATION OF NON-COMPLIANCE RECTIFICATION
-
Name and Signature