Title Page

  • Site conducted

  • Project/Site Name

  • Conducted on

  • Prepared by

  • Location
  • Accompanied by

Site Inspection

  • Details of the site

  • Number of Managers on site

  • Number of Operatives on site

General Site Safety

  • Is the Contract Risk Matrix (01-85) up to date and prominently displayed in the site office?

  • Cleaning materials/ sanitising stations established

  • Safe Access/Egress

  • Free of Trip Hazards

  • General Lighting adequate

  • Safety Signage & Communication

  • Segregation from Site Plant/Vehicles

Site set up and Welfare

  • Canteen clean/ Drinking water

  • Changing Room/Drying room

  • Toilets/Washing Facilities

  • First Aid Cover

  • Fire Precautions and Escape routes

  • HSE policy displayed/ Law Poster/ Insurances

Documentation

  • Correct site file system in use

  • F10 Displayed

  • Construction Phase plan/ Evidence of review/ update 01-49

  • Risk Assessments

  • Method Statements

  • Daily Briefing Carried Out/Recorded

  • COSHH Assessments

  • Daily Plant Inspection reports

  • MEWP Inspections Reports

  • Certifcation held on site ie LOLER

  • Scaffold Inspection reports

  • Site Safety Inspection 01-02

  • Puwer inspection 01-14

  • Excavation Inspection 01-06

Temporary Works

  • Register in place and comprehensive

  • Co-Ordinator named and highlighted on site

  • Permit to load utilised

  • Temporary works inspected

Site Induction and Operative Training

  • SMSTS/ SSSTS Training in place.

  • Site inductions Carried out 01-01/ 01-58

  • CSCS/CPCS

  • Asbestos Awareness

  • Manual Handling

  • Abrasive Wheels

  • PASMA (Mobile Towers)

  • IPAF (MEWPS)

  • Confined Spaces

Material Storage

  • Materials Stored on site

  • Storage Containers

  • Housekeeping

  • Petrol, Diesel, Oil Storage

  • Spill Kit/ Spill procedure displayed on site

Working Practices

  • Work at Height

  • Edge Protection

  • Lifting operations

  • Scaffolds/ Ladders

  • Use of Access Equipment inc Hop ups, Mobile Towers, MEWPS

  • Power Cables routed Safely

  • Electrical Testsing inc PAT

  • Excavations Supported/ Segregated

  • Permits in use ie Dig, Hot works, Step ladders, COVID 19

PPE

  • PPE issue Log completed

  • Correct PPE being worn for task

  • Correct RPE in use/ Face fit records

  • Operatives clean shaven

  • If Reusable 28 day inspection viewed

Occupational Health

  • HAVS Records Completed

  • Noise Assessment/ Monitoring completed

  • Adequate dust control measures in place ie Type M/H LEV

Sign Off Page

  • Upcoming significant works

  • HSE Managers Comments:

  • Site Manager

  • Sign

  • Person Completing Inspection

  • Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.