Title Page

  • Site pre-planner

  • Job No.

  • Site Address

  • Client

  • Conducted on

  • Prepared by

  • Please include photos of any damage where required

Site Identification

  • Is address in google maps

  • Are boundary identification pegs evident<br>

  • Will site required additional site survey prior site start

  • Do any boundary fences need to be removed prior site start or during construction

  • Will retaining walls be required prior or after earthworks

  • If retaining walls are required prior site start will part install of services eg, stormwater, electrical, communications be required

Site Condition

  • Will site require slashing prior site start

  • Is site clean of all debris

  • Are there any trees that will require removal prior site start

  • Is kerb damaged

  • Is footpath damaged

  • Is there a possibility construction traffic could damage footpath

Location of services

  • Is underground power available

  • Is electrical box damaged

  • Is Telstra pit visible

  • Is Telstra pit or lid damaged

  • Is there a separate communications pit

  • Is communications pit or lid damaged

  • Is water meter box installed

  • Is water meter installed in box

  • Is water meter box, lid or meter damaged

  • Recording of current water meter usage required

  • Is natural underground gas available. check if any badges on kerbs

  • Are there stormwater kerb adapters installed

  • Is kerb type Barrier or Rollover

  • Is there a stormwater pit installed

  • Can stormwater achieve fall to kerb or stormwater connection point

  • Is stormwater pit or grate damaged

  • Is sewer manhole installed

  • Is sewer manhole pit or lid damaged

Access and storage of building materials

  • Will traffic control be required due to 100mts from a School, Hospital, Bus stop, Main rd, Traffic lights etc

  • Will deliveries stop or disrupt traffic

  • Will deliveries stop or disrupt pedestrians on footpath

  • Is there adequate parking for tradespeople

  • Is there No stopping lanes, No parking signage, No standing signs near access gates

  • Is there adequate room for storage of materials

  • Will any future building materials have to be delivered prior site start

  • Will there be additional excess soil removal from site

  • Is there an area suitable to accommodate a site shed

  • Is there an area suitable to accomodate a storage container

  • Can the site toilets be located to suit weekly servicing by supplier's pump.

  • Will extra all weather access material be required (standard 6m x 3m allowed)

  • Will extra barrier mesh be required due to fall of land, neighbouring homes at a lower level etc

  • How many gate entrances are required

  • Will additional site security perimeter fencing be required

  • Will the use of skip bins be required

  • Additional comments,

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.