  • Tiling inspection

  • Job No.

  • Address

  • Inspection date

  • Inspected by

  • Floor and wall tiling contractor

MAIN FLOOR AREA

  • All tiles laid true and square, no small cuts, no lipping and clean

  • Grout removed from expansion joints and in correct locations

  • Grouting complete and joints full

  • Floor tile surface cleaned of excess grout

  • Are Dishwasher space and cupboards complete.

  • Spare Full boxes only stacked neatly under stairs.

DOWNSTAIRS W/C

  • Floor tiles complete and falls to wastes.

  • Skirting tiles complete and height as per plan.

  • Grouting complete with no grout smear on tiles

  • Spare Full boxes only stacked neatly under stairs.

BATHROOM

  • Waterproofing complete and inspected prior to tiling.

  • Floor tiles complete and falls to wastes.

  • Wall tiles complete and feature tiles included in correct location and correct size.

  • Bath hob tiles completed and as per plan.

  • Skirting tiles complete and height as per plan.

  • Splash backs complete and correct to plan

  • Shower and door water stops remain and undamaged.

  • Floor waste grates installed.

  • Floor waste drains clear of tiling / bedding material

  • Grouting completed with no grout smear on tiles

  • Internal floor tile junction to Streamline angle is siliconed

  • Spare Full boxes only stacked neatly under stairs.

ENSUITE

  • Waterproofing complete and inspected prior to tiling.

  • Floor tiles complete and falls to wastes.

  • Wall tiles complete and feature tiles included in correct location to correct size.

  • Skirting tiles complete and height as per plan.

  • Splash backs complete and correct to plan

  • Shower and door water stops remain and undamaged.

  • Floor waste grates installed.

  • Floor waste clear of tiling / bedding material

  • Grouting completed with no grout smear on tiles

  • Internal floor tile junction to Streamline angle is siliconed

  • Spare Full boxes only stacked neatly under stairs.

LAUNDRY

  • Floor tiles complete.

  • Splash back over laundry tub complete as per detail.

  • Skirting tiles complete and height as per plan.

  • Floor waste grates installed.

  • Floor waste clear of tiling / bedding material

  • Grouting completed with no grout smear on tiles

  • Spare Full boxes only stacked neatly under stairs.

POWDER

  • Floor tiles complete.

  • Splash back over vanity complete as per detail.

  • Skirting tiles complete and height as per plan.

  • Grouting completed with no grout smear on tiles

  • Spare Full boxes only stacked neatly under stairs.

OTHER (if applicable)

  • Kitchen splash back complete to detail.

  • Sliding door sills complete.

  • External door sills completed

HOUSEKEEPING

  • All rubbish and packaging removed from garage and placed in bin/ cage.

  • Timber delivery pallets placed in bin provided.

  • Spare full boxes of tiles neatly stacked under stairs around corner so painter can paint wall linings.

  • House fully swept out and rubbish placed in bins provided.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.