Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Visual inspection of suitability of the floor/wall, general clean, line and level (Checked by Sub-Contractor)

  • Visual inspection of suitability of the floor/wall, general clean, line and level (Checked by Ventry)

  • Check that the correct tiles are used as specified and approved (Checked by Sub-Contractor)

  • Check that the correct tiles are used as specified and approved (Checked by Ventry)

  • Check that the grout conforms to sample approval (Checked by Sub-Contractor)

  • Check that the grout conforms to sample approval (Checked by Ventry)

  • Check the correct tiles to be installed (Checked by Sub-Contractor)

  • Check the correct tiles to be installed (Checked by Ventry)

  • Check correct setting out tile layout - use latest contract issue setting out drawings (Checked by Sub-Contrator)

  • Check correct setting out tile layout - use latest contract issue setting out drawings (Checked by Ventry)

  • Check tiles for chips/scratches (Checked by Sub-Contractor)

  • Check tiles for chips/scratches (Checking by Ventry)

  • Continual visual inspections for consistency of width and coverage in grouted joints (Checked by Sub-Contractor)

  • Continual visual inspections for consistency of width and coverage in grouted joints (Checked by Ventry)

  • Ensure all surplus grout residue has been cleaned off tile surface and laitance (Checked by Sub-Contractor)

  • Ensure all surplus grout residue has been cleaned off tile surface and laitance (Checked by Ventry)

  • Check for any damage to trim strips (Checked by Sub-Contractor)

  • Check for any damage to trim strips (Checked by Ventry)

  • Check all joints (Checked by Sub-Contractor)

  • Check all joints (Checked by Ventry)

  • Check final line and check with 2m straight edge to ensure floor tiles are within specified tolerance +/-3mm deviation over the 2-3m (Checked by Sub-Contractor)

  • Check final line and check with 2m straight edge to ensure floor tiles are within specified tolerance +/-3mm deviation over the 2-3m (Checked by Ventry)

  • Remove all waste from area (Checked by Sub-Contractor)

  • Remove all waste from area (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.