Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Installation by a trained competent fire stopped (Checked by Sub-Contractor)

  • Installation by a trained competent fire stopped (Checked by Ventry)

  • Fire cavity barrier materials as specified (Checked by Sub-Contractor)

  • Fire cavity barrier materials as specified (Checked by Ventry)

  • Appropriate product for specific type of use (as per agreed details) (Checked by Sub-Contractor)

  • Appropriate product for specified type of use (as per agreed details) (Checked by Ventry)

  • Fire cavity barrier correct type and size (Checked by Sub-Contractor)

  • Fire cavity barrier correct type and size (Checked by Ventry)

  • Fire cavity barrier installed in the correct location as detailed on appropriate drawings (Checked by Sub-Contractor)

  • Fire cavity barrier installed in the correct location as detailed on appropriate drawings (Checked by Ventry)

  • Fire cavity barrier lengths tightly butted at joints and taped as manufacturers details (Checked by Sub-Contractor)

  • Fire cavity barrier lengths tightly butted at joints and taped as manufacturers details (Checked by Ventry)

  • Fire cavity barrier lengths installed in correct orientation as indicated by directional markings (Checked by Sub-Contractor)

  • Fire cavity barrier lengths installed in correct orientation as indicated by directional markings (Checked by Ventry)

  • Fire cavity barrier mechanically fixed at centres specified in manufacturers detail (Checked by Sub-Contractor)

  • Fire cavity barrier mechanically fixed at centres specified in manufacturers detail (Checked by Ventry)

  • Horizontal/vertical junctions correctly formed and taped (Checked by Sub-Contractor)

  • Horizontal/vertical junctions correctly formed and taped (Checked by Ventry)

  • Intumescent strip installed correctly as manufacturers detail (Checked by Sub-Contractor)

  • Intumescent strip installed correctly as manufacturers detail (Checked by Ventry)

  • Intumescent adhesive used to bond intumescent strip where applicable (Checked by Sub-Contractor)

  • Intumescent adhesive used to bond intumescent strip where applicable (Checked by Ventry)

  • Retaining bracket tabs trimmed to correct size where applicable (Checked by Sub-Contractor)

  • Retaining bracket tabs trimmed to correct size where applicable (Checked by Ventry)

  • Fire cavity barrier sealed to substrate with intumescent sealant where applicable as per manufacturers details (Checked by Sub-Contractor)

  • Fire cavity barrier sealed to substrate with intumescent sealant where applicable as per manufacturers details (Checked by Ventry)

  • Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Sub-Contractor)

  • Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Ventry)

  • Inspections and testing if required (Checked by Sub-Contractor)

  • Inspections and testing if required (Checked by Ventry)

  • Building Control final inspection (Checked by Sub-Contractor)

  • Building Control final inspection (Checked by Ventry)

  • Inspection by Independent Certifier (Checked by Sub-Contractor)

  • Inspection by Independent Certifier (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.