Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Installation by a trained competent fire stopped (Checked by Sub-Contractor)
-
Installation by a trained competent fire stopped (Checked by Ventry)
-
Fire cavity barrier materials as specified (Checked by Sub-Contractor)
-
Fire cavity barrier materials as specified (Checked by Ventry)
-
Appropriate product for specific type of use (as per agreed details) (Checked by Sub-Contractor)
-
Appropriate product for specified type of use (as per agreed details) (Checked by Ventry)
-
Fire cavity barrier correct type and size (Checked by Sub-Contractor)
-
Fire cavity barrier correct type and size (Checked by Ventry)
-
Fire cavity barrier installed in the correct location as detailed on appropriate drawings (Checked by Sub-Contractor)
-
Fire cavity barrier installed in the correct location as detailed on appropriate drawings (Checked by Ventry)
-
Fire cavity barrier lengths tightly butted at joints and taped as manufacturers details (Checked by Sub-Contractor)
-
Fire cavity barrier lengths tightly butted at joints and taped as manufacturers details (Checked by Ventry)
-
Fire cavity barrier lengths installed in correct orientation as indicated by directional markings (Checked by Sub-Contractor)
-
Fire cavity barrier lengths installed in correct orientation as indicated by directional markings (Checked by Ventry)
-
Fire cavity barrier mechanically fixed at centres specified in manufacturers detail (Checked by Sub-Contractor)
-
Fire cavity barrier mechanically fixed at centres specified in manufacturers detail (Checked by Ventry)
-
Horizontal/vertical junctions correctly formed and taped (Checked by Sub-Contractor)
-
Horizontal/vertical junctions correctly formed and taped (Checked by Ventry)
-
Intumescent strip installed correctly as manufacturers detail (Checked by Sub-Contractor)
-
Intumescent strip installed correctly as manufacturers detail (Checked by Ventry)
-
Intumescent adhesive used to bond intumescent strip where applicable (Checked by Sub-Contractor)
-
Intumescent adhesive used to bond intumescent strip where applicable (Checked by Ventry)
-
Retaining bracket tabs trimmed to correct size where applicable (Checked by Sub-Contractor)
-
Retaining bracket tabs trimmed to correct size where applicable (Checked by Ventry)
-
Fire cavity barrier sealed to substrate with intumescent sealant where applicable as per manufacturers details (Checked by Sub-Contractor)
-
Fire cavity barrier sealed to substrate with intumescent sealant where applicable as per manufacturers details (Checked by Ventry)
-
Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Sub-Contractor)
-
Walk through inspections to be conducted by BC as installation proceeds to avoid concealment by other trades (Checked by Ventry)
-
Inspections and testing if required (Checked by Sub-Contractor)
-
Inspections and testing if required (Checked by Ventry)
-
Building Control final inspection (Checked by Sub-Contractor)
-
Building Control final inspection (Checked by Ventry)
-
Inspection by Independent Certifier (Checked by Sub-Contractor)
-
Inspection by Independent Certifier (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: