Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Check sheets are undamaged, handled correctly and tied down to structure if stored on roof (Checked by Sub-Contractor)
-
Check sheets are undamaged, handled correctly and tied down to structure if stored on roof (Checked by Ventry)
-
Only approved personnel allowed on roof and clean footwear must be worn (Checked by Sub-Contractor)
-
Only approved personnel allowed on roof and clean footwear must be worn (Checked by Ventry)
-
Check only approved fixings are being used (Checked by Sub-Contractor)
-
Check only approved fixings are being used (Checked by Ventry)
-
Check all fixings at the correct centres and correctly fixed (Checked by Sub-Contractor)
-
Check all fixings at the correct centres and correctly fixed (Checked by Ventry)
-
Check liner sheets are securely fixed as soon as they are laid (Checked by Sub-Contractor)
-
Check liner sheets are securely fixed as soon as they are laid (Checked by Ventry)
-
Check liner sheet joints are taped/sealed (if specified) (Checked by Sub-Contractor)
-
Check liner sheet joints are taped/sealed (if specified) (Checked by Ventry)
-
Ensure vapour check is continuous, lapped and sealed (if specified) (Checked by Sub-Contractor)
-
Ensure vapour check is continuous, lapped and sealed (if specified) (Checked by Ventry)
-
Check correct zed spacers, fixings and ferrules are used (Checked by Sub-Contractor)
-
Check correct zed spacers, fixings and ferrules are used (Checked by Ventry)
-
Check insulation quilt is laid tight butting, between zed spacers (Checked by Sub-Contractor)
-
Check insulation quilt is laid tight butting, between zed spacers (Checked by Ventry)
-
If specified, check breather membrane is continuous, properly lapped and not sagging (Checked by Sub-Contractor)
-
If specified, check breather membrane is continuous, properly lapped and not sagging (Checked by Ventry)
-
Check sheets are fixed the right way up and the right way around (Checked by Sub-Contractor)
-
Check sheets are fixed the right way up and the right way around (Checked by Ventry)
-
Check sheet side laps: fixings at correct centres and/or sheets securely indexed onto previous sheet (Checked by Sub-Contractor)
-
Check sheet side laps: fixings at correct centres and/or sheets securely indexed onto previous sheet (Checked by Ventry)
-
Check op sheet side lap stitchers are fixed at specified centres as the sheets are being laid (Checked by Sub-Contractor)
-
Check op sheet side lap stitchers are fixed at specified centres as the sheets are being laid (Checked by Ventry)
-
Check end laps have sealant tape correctly located, are tight and fixed at correct centres (Checked by Sub-Contractor)
-
Check end laps have sealant tape correctly located, are tight and fixed at correct centres (Checked by Ventry)
-
Check end of sheets are turned down at gutters and up at roof ridges and hips, if required (Checked by Sub-Contractor)
-
Check end of sheets are turned down at gutters and up at roof ridges and hips, if required (Checked by Ventry)
-
Check approved rooflight fixings are used and fixed through oversized holes (Checked by Sub-Contractor)
-
Check approved rooflight fixings are used and fixed through oversized holes (Checked by Ventry)
-
Check sample of fixings for water tightness using an air suction gun (Checked by Sub-Contractor)
-
Check sample of fixings for water tightness using an air suction gun (Checked by Ventry)
-
Check adequacy of fixings and seals on all flashings, gutters and penetrations (Checked by Sub-Contractor)
-
Check adequacy of fixings and seals on all flashings, gutters and penetrations (Checked by Ventry)
-
Check corrugation fillers are fitted and are the correct type (Checked by Sub-Contractor)
-
Check corrugation fillers are fitted and are the correct type (Checked by Ventry)
-
Check no sheets with sharp indentations (sheet strength or fixity) or with deep scratches damaging galvanising (Checked by Sub-Contractor)
-
Check no sheets with sharp indentations (sheet strength or fixity) or with deep scratches damaging galvanising (Checked by Ventry)
-
Check cut ends have been treated, if specified (Checked by Sub-Contractor)
-
Check cut ends have been treated, if specified (Checked by Ventry)
-
Ensure fixer stands on overlapping sheet when installing fixings (Checked by Sub-Contractor)
-
Ensure fixer stands on overlapping sheet when installing fixings (Checked by Ventry)
-
Check gutter liner trays and insulation are continuous (Checked by Sub-Contractor)
-
Check gutter liner trays and insulation are continuous (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: