Information
-
Fixout Inspection
-
Job No.
-
Address
-
Inspection date
-
Inspected by
-
Fix Out Carpenter
General Fixout Inspection
-
Has the plasterer left site clean and tidy and removed all plaster dags off floor ready for Fixout carpenter.
-
Have the external locks been fitted to provide a secure home
-
Have the entry door lock strikers and latch plates been installed correctly
-
Has a door wind catch or cusion stop been installed on the external doors to eliminate damage to plaster from handles
-
Are the architraves and skirting boards match size and profile as per contract?
-
Have Kitchen window architraves been fitted tight down to benchtop
-
Have all skirting boards been installed? (e.g behind dishwasher space, fridge space, internal robe returns?)
-
Have the skirting boards been properly scribed and mitred and square at external corners?
-
Have architraves been scribed back with no gaps against internal walls where required?
-
Have all architrave mitres been cut neat to 45 degrees , glued, sanded back to produce a flush finish ready to paint?
-
Have all window and door architraves been installed with a consistent even margin
-
Have all window and door architraves been nailed off at approx 400mm spacings
-
Are the doors as per contract? (e.g specials, sizes)
-
Have all internal doors been fitted with suitable gap underneath to suit floor finishes
-
Have all doors been installed to swing the way the plan indicates?
-
Are margins to doors within accepted tolerances.(Head & sides?) (Less than 3mm)
-
Do all doors freely open? (See margins)
-
Are the robe reveal linings installed true and plumb.
-
Have lift off hinges been installed to W.C's, Powder rooms and Bathrooms where required.
-
Have lift off hinge doors been cut down to allow for removal.
-
Do plasterboard and skirting fixings to cavity sliding doors impede the cavity pocket opening?
-
Have top head architraves to cavity doors been nailed on with shorter nails so they don't protrude into track and be visible
-
Have cavity head removable stops been fitted with screws and screw caps.
-
Has the man hole been trimmed out and positioned as per plan and the cover cut and left on site.
-
Are quads installed where a gap is greater than 3mm.
-
Have window frames been packed under mullions to take sag out of the windows before installation of architraves?
-
Have skirtings been fitted to stair landing
-
Have top floor skirtings been fitted hard down to particleboard floorings
-
Have ground floor skirtings been installed with suitable gap for tiles to be installed under
HOUSEKEEPING
-
Has the complete job been swept out?
-
Have all off-cuts been placed in bin/ cage and surplus material neatly stacked in garage.