Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Prepared by

  • Location

On site activity

  • Is all planned work ready for you to start

  • Are All Pulling pits excavated

  • Are all excavations safe to enter

  • Are you happy to commence with work

  • Please add photos before starting works

Cable pull

  • Is route clear / Excavation correct depth and sanded

  • Are all ducts clear and exposed

  • Are all rollers in place

  • Is Cable winch in use

  • Photo of Cable drum and Cable trailer

  • Provide photos of completed cable pull in trench

  • Are all cables capped off with shorting end caps

Day review - Good / Bad / Lost time

  • undefined

Site Manager Acceptance of Cable installation (Hand Over)

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.