Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Auditor
-
Location
-
Auditee
-
Regional Director
Creagh site team appearance
-
PPE compliance for specific job activities
-
All operatives in Creagh uniform<br>
-
Is uniform in good condition and presentable?
Creagh equipment
-
Van. Is this clean both inside and out?<br>
-
Have pre ops been completed for all equipment to be used?
-
Haulier - visual appearance of lorry, is it clean?
Housekeeping on site
-
Is Creagh area tidy and well kept?
-
Is work area provided by client tidy and well kept?
Equipment on site
-
Is the correct equipment on site to carry out specific scope of works?
Quality
-
Have all Creagh products got green dot on label from factory?
-
Are products on site manufactured to Construction drawings, dimensions correct etc?
-
Are units being installed in correct sequence detailed in drawings?
-
Is visual appearance of units showing them in good condition?
-
Are units all free from damage? If no please explain how this happened
Creagh operatives start time
-
Start time provided?
-
Time of first delivery on site provided?
-
Delays of load explained?
-
Are all areas provided by client free from poor workmanship? If no please provide details