Information

  • Client

  • Project Reference

  • Volsen Supervisor On Site

  • Volsen Operatives On Site

  • Roof Area

  • Conducted on

  • Prepared by

  • Location

VCL

  • VCL

  • Has the VCL been overlapped by at least 100mm?

  • Are the joins sealed?

  • Can you see that the VCL has been lapped up to the top of the insulation to all perimeters?

Insulation If Applicable

  • Insulation Type

  • Has a joining strap been fitted to the butt strap?

  • Thickness

  • How is the insulation attached to the roof?

  • Is the insulation secured to the deck properly with no bouncing boards?

Metals

  • Are the metals fixed at a maximum of 225mm centres for 1.5mm membrane, 180mm centres for 2mm membrane

  • Is there a minimum of 20mm gap between each metal joint?

Membrane

  • Is there a minimum of 30mm weld to the membrane laps?

  • Is there a minimum of 50mm membrane overlap?

  • Is there a minimum 30mm weld to the T-joint capillaries?

  • Do the fixing centres match the fixing schedule?

  • Are the discs fastened securely?

  • Are the discs welded correctly?

  • Is the membrane fixed/adhered properly?

  • Check dimensional accuracy of wall and course set out!

  • Set a standard of quality with sample panel, sample wall or both

  • Check all bricks delivered to site against supplied samples reject any that do not fall within the clients agreed range!

  • Bricks are to be colour selected and colour mixed as required likewise with mortar!

  • Check specifications for any special requirements ie: mortar and brick testing, special jointing, control joints and ties!

  • Brickwork minimum standard is to be as set out in the appropriate code!

  • All bricks must be laid to a string line!

  • Set all door frame heads to be a common level throughout the building!

  • Bricks must be cut off with brick saw to all face walls!

  • Check building in of door frames!

  • Check tolerances on internal walls!

  • Check installation of shelf angles and lintels!

  • Check type, location and fixing of brick ties!

  • Expansion joint locations to be checked!

  • Cavities must be cleaned by either water or chains alternatively use cavity battens!

  • Ensure that acid cleaning does not burn brickwork on completion must be left clean!

Carpet

  • Ensure substrate is prepared and cleaned prior to laying!

  • Check carpet and underlay against samples on site for conformity including colour, texture and pattern?

  • Check pattern for direction as per specification and drawings

  • Check carpet colours as per finishes schedule for colour and pattern laying per area ie: right colour, pattern per room area!

  • Check for damage or marks prior to and after laying!

  • Check joints and seams for no visible joint apparent!

  • Cross joints permitted only in low traffic areas on minimal occasions!

  • Complete installation shall be smooth and free from wrinkles, bulges, tears, creases, defective seams and stains!

  • Ensure vinyl skirting is tightly tucked between carpet and wall and glued to walls!

  • Check skirting has not been scuffed by carpet layers!

  • Check that carpet has been cleaned and floor protection installed in finished areas!

Concrete

  • Check that mpa and slump tests have been carried out and concrete as within specified tolerances!

  • Check for work and reinforcement has been inspected and approved by engineer prior to pour!

  • Check that penetrations, conduits and services are in correct locations prior to pour!

  • Check all built items and ensure correct location!

  • Check curing agent is acceptable by engineer!

  • Check that dumpy level is on site to take levels!

  • Check that samples have been taken for testing!

  • Check that records are available of where test locations are!

  • Check that all exposed edges have been tooled while concrete is workable!

  • Check all set downs and up stands are correct for future floor finishes!

  • Check all concrete finishes are within specified tolerances!

  • Check that records for pour dates, pour locations, and cure times are marked on floor plan!

  • Check that concrete is covered if poor weather conditions are apparent!

  • Clean up after each pour!

  • Check that truck wash down area is nominated!

  • Check that disposal of excess concrete is as per environmental management plan!

Demolition

  • Check that correct revision drawings and specification are onsite prior to commencement!

  • Check that services have been identified and isolated prior to commencement!

  • Check that hazardous materials survey has been obtained prior to commencement!

  • Check that engineers approval fro removal of structural elements has been obtained prior to commencement!

  • Check that slab has been scanned for services prior to cutting penetrations!

  • Check that WorkCover has been notified on intention to remove structural elements or cut structural penetrations prior to commencement!

  • Check that all items, areas or walls or clearly marked for demolition and confirmed by MPA prior to commencement!

  • Check that all adjoining properties are inspected and recorded and condition agreed prior to commencement!

  • Check that waste is segregated for recycling reuse where possible!

  • Check that all public areas are protected prior to commencement!

  • Check that all trade contractors are licensed where required!

  • Check that waste disposal summary is received weekly!

  • Check that areas are left clean and safe at end of each shift!

Electrical

  • Check that correct revision drawings and specification are available onsite

  • Check that electrical survey and installation of RCD'S, in all lighting circuits is completed prior to other trades commencing onsite!

  • Check that temporary boards clearly identify where they are supplied from!

  • Check that all temporary boards are tested for compliance and trip tested prior to using!

  • Check that temporary board circuit breakers have lockable covers with padlock!

  • Check that temporary boards display test records and are securely fastened to ground!

  • Check that electrical contractor has copies of electrical standards onsite!

  • Check that circuit identification is as per specification!

  • Check that insulating grommets are installed wherever cable pass through steel studs or purlins!

  • Check that all electrical installations are as per Australian Standards and specification!

  • Check lighting is as per specification, samples and prototypes!

  • Check that commissioning is planned and as per specification!

  • Check delivery dates for switchboards is compliant with program!

  • Check that commissioning of emergency lighting is as per AS/NZS 8293!

  • Ensure that as built drawings, manuals are submitted for review and approval as early as possible!

  • Ensure client training is given regarding operating systems!

Excavation

  • Check that correct revisions of drawings and specification are available onsite!

  • Check that all required permits and approvals are obtained prior to commencement!

  • Check that services are identified using dial before you dig or scanning prior to commencement!

  • Check and confirm locations of excavations prior to commencement!

  • Check that dilapidation report on adjoining properties is completed prior to commencement!

  • Check DA for restrictions!

  • Check levels are as required!

  • Check that shoring is installed along with safe access and protection form falling into excavation during works!

  • Check that operator for machinery are licensed and maintenance records of plant are available!

  • Check that isolation zones are installed during works as required!

Formwork

  • Check that correct revision drawings and specification are available onsite!

  • Check that Formwork is installed as per specifications, drawings, code of practice and Australian Standards!

  • Check that engineers approvals have been obtained prior to pour!

  • Check locations and levels of cast in services prior to pour!

  • Check Formwork dimensions are within tolerance, joints are tight and set out is correct as per drawings!

  • Check that all protruding reinforcement is protected against implement!

Glazing

  • Check that correct revision drawing and specification are available onsite!

  • Check that glazing method is as per specification!

  • Check glass thickness against specification!

  • Check all glazing for blemishes, cracks and imperfections!

  • Check glass for correct size, fully beaded and trade cleaned properly!

  • Check all installed glass to be properly bedded and checked for rattles or distortion!

  • Check or glazing for proper sealing of joints and glass!

  • Check that glass is cleaned correctly to avoid damage!

  • Check that glazing certificate is obtained for as installed and as per specification!

Hydraulics

  • Check that correct revisions of drawings and specification are available onsite!

  • Check locations of services prior to installation!

  • Concealed pipe work to be firmly fixed to prevent water hammer!

  • Check locations of basins, fixings and utilities prior to installation using drawing and specification!

  • Check fixtures and fitting against samples, prototypes and schedules prior to installation!

  • Check that installation is as per Australian Standards!

  • Check that underground works are documented for inclusion in as Built's!

  • Check that taps have no leaks!

  • Check that cisterns and pans are installed level!

  • Check that installed basins are water tight and level!

  • Check floor waste positions prior to installation and checked against drawings after installation

  • Check all drains are laid on firm compacted bed!

  • Check all pits are water tight!

  • Check falls on all drains are correct!

  • Check that inspection by Sydney Water is carried out when required!

  • Check that all pipe work is recorded for inclusion on as Built's!

  • Ensure that as Built's and required certification is obtained as early as possible!

Joinery

  • Check that correct revisions of drawings and specifications are available onsite!

  • Check that samples of finishes and prototypes are available onsite!

  • Check that dimensional accuracy of units is check measured onsite prior to installation!

  • Check laminate colours are as per samples and specification prior to delivery to site!

  • Check all timber to be kiln dried and strength graded!

  • Check laminate surfaces has not bubbled!

  • Check all arises have rounded edges where specified!

  • Check splash backs are the same colour where specified!

  • Check all joinery timber is free of knots, shakes, cracks or splits!

  • Check all laminates are sealed!

  • Check all joints between joinery and vanities, screens and document trays to be caulked!

  • Check all mitre, housing joints to be of good workmanship and as per specification!

  • Check all draws slide easily and have dovetail joints!

  • Check all draws and doors have equal gap spacing!

  • Check all hardware is as per specification and samples or prototypes prior to installation!

  • Check that bench tops are supported on KDHW ladder frame comprising ex 75x25 perimeter rails and ex 50 x 25!

Mechanical

  • Check that correct revisions of drawings and specification are available onsite!

  • Check that all items to be fitted of are at correct locations, heights as per drawings and specifications!

  • Check that colour of registers and units is as per specifications!

  • Check that ductwork is manufactured according to specification!

  • Check that fan guards are fitted to belts and pulleys and inlet guards fitted!

  • Check installed ductwork is dimensionally accurate, gaskets installed, corners sealed, hangers at correct intervals and damage free!

  • Check flexible ducts to have joints taped, insulated at pop cut in, firmly clamped to pops and damage free!

  • Check that all exposed pipe work is insulated with bends neatly mitred!

  • Check ductwork is clean internally and externally!

  • Check pie work is adequately clipped!

  • Check that dissimilar materials are isolated from one and another!

  • Check that insulation is applied neatly and securely!

  • Check that condensate pipe work is installed with correct falls!

  • Check there are no gaps in pipe insulation, armaflex butt joints amd longitudinal slits glued and taped!

Painting

  • Check that correct revisions of drawings and specifications are available onsite!

  • Check that sample for all finishes are available onsite!

  • Confirm correct materials upon arrival onsite prior to application!

  • Check that painting contractor has confirmed colour choices for all painting and marked on drawings prior to painting!

  • Confirm sanding of coats between coats!

  • Confirm each coat applied prior to applying next coat until all coats are applied as per specification!

  • Check all filling sanding prior to application!

  • Check filling sanding of gaps between door frame and wall lining prior to applying paint!

  • Check that stop ends are painted prior to installation!

  • Check quality of gloss finishes on pressed door frames!

  • Check if environmentally friendly substitution is possible!

  • Check all finishes have no show through!

  • Check that protection, masking tape is installed prior to painting!

  • Check that touch ups are not visible!

  • Check that shadow lines are clean and that other colours are fined cleanly!

  • Check that all protection, masking tape is removed and all marks and blemishes removed!

  • Check for paint on areas where it shouldn't be example aluminium!

  • Clean all areas painted!

Partitions

  • Check that correct revisions of drawings and specification are available onsite!

  • Check materials for conformance to specification upon arrival onsite!

  • Check walls are straight and within tolerance prior to sheeting!

  • Check location of services prior to closing walls!

  • Confirm insulation is installed and if required by client witnessed prior to closing walls!

  • Check all wall angles are mitre cut at corner and fit to a clean 45 degree angle!

  • Check all stop ends are painted prior to installation!

  • Check all joints are sanded flush with plasterboard!

  • Check that types of joints specified are achieved!

  • Check that plasterboard is installed as per manufactures specification!

  • Check there are no gaps between ceilings and walls!

  • Check ceiling grid in all directions is straight, level and true!

  • Check framework set out for ceilings incorporates linear grills!

  • Check all main runners miss all penetrations and grid system is stable!

  • Check all shadow lines are clean and level and painted!

  • Check ceiling is installed level and at correct heights!

  • Check cornice installation is straight and finished with no more gaps!

  • Check that access panels are installed at correct locations as per drawings and specification and have other trades confirmed locations!

  • Check that finishes requiring make good after other trades is completed!

  • Check the finish is acceptable prior to painting!

Reinforcement

  • Check that correct revision drawings and specification are available onsite!

  • Check and confirm all set out works!

  • Check materials comply with specification upon arrival onsite!

  • Check that specified support and cover is achieved!

  • Check trimming for all openings!

  • Check bar chairs are correctly positioned and spaced!

  • Check that plastic tipped chairs are installed on all formed faces!

  • Check that reinforcement is place in all excavated areas as soon as possible!

  • Check that plastic membrane is protected against punching from bar chairs!

  • Check that starter bars are protected to eliminate displacement!

  • When possible pre fabricate reinforcement for beams!

  • Check all reinforcement is placed as per engineers drawings!

  • Ensure that engineers sign off is obtained prior to pour!

Roofing

  • Check that correct revisions of drawings and specifications are available onsite!

  • Check all materials comply with specification upon arrival onsite!

  • Check sarking, insulation, roof sheets, fasteners!

  • Check flashings, cappings and sealants!

  • Check gutters, support brackets, downpipes, sumps and overflows!

  • Check roof lights, cowls bird proofing!

  • Check roof materials are fitted securely and made weather proof!

  • Check installation is carried out as per manufactures specifications!

  • Check adequate turn up and turn down on all sheets!

  • Check ridge capping is installed satisfactorily!

  • Check all materials abutting each other are compatible with each other!

  • Check that penetrations and flashings are designed, fabricated and sealed satisfactorily!

  • Check gutter fall and gauge!

  • Check all box gutters have overflow installed!

  • Check box sumps and dips have wire guards!

  • Check downpipes are connected to gutter or sump!

  • Check downpipes are sealed into storm water pipes!

  • Check water tightness of roof system!

  • Ensure roof is cleaned upon installation!

Vinyl

  • Check correct revisions of drawings and specifications are available onsite!

  • Check samples of vinyls to be installed are available onsite

  • Check preparation of substrate prior to installation!

  • Check and confirm colours and pattern direction and set out accordingly!

  • Check welding of seams is colour matched to agreed samples!

  • Check all joints in vinyl are straight!

  • Check jointing in vinyl to be inconspicuous!

  • Ensure that 3 mm MDF is used as floor protection for all newly completed works!

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.