Title Page
-
Conducted on Site Report
-
Prepared by
-
Time of NABs / DABs briefing
-
Names of Engineers Briefed on works to be undertaken
-
Project
-
Is Fujitsu PC for these works?
-
Works do not fall under Fujitsu PC - RAMs available on site in line with Fujitsu's Health and Safety policies
-
Works fall under Fujitsu PC - RAMs, Work site pack or HS board visible on site in line with Fujitsu's Health and Safety policies
Activities Undertaken
- Works Report
-
Type of Works ie. Survey / Installation / Testing
-
Location
-
All permits ( AWA / WANs ect..) opened and permission to proceed granted
-
Stop works. Ensure authorisation to proceed with works is granted
-
Have all relivant MCCS / CRQ's / LSS ect.. permits been opened
-
Stop works. Ensure authorisation to proceed with works is granted
-
Time started works on site (Time at point of work)
-
Any delays for accessing site please record below including lost time (Late last flights, Leader delays ect..)
-
POWRA completed per location
-
Substation Works
-
Has an LOA been issued
-
This work has been confirmed as not requiring an LOA by the SPSE
-
Name of SPSE
-
Who has issued the LOA (Name of Issuer and Company) add Photograph of permit
-
Are these works within: Substation/AGL Substation/UKPNS Substation
-
Time APOC called to confirm no alarms present and access permitted
-
Time Engineering called to confirm no alarms present and access permitted
-
Can you confirm you have signed onto the Site sign in book.
-
Please sign the works in the book and take a photo
-
Please take a photo of the sign in book
-
There is no sign in book on site
-
Time APOC called to confirm no alarms present and access permitted
-
Time Engineering called to confirm no alarms present and access permitted
-
AGL AP/SP present and work area access confirmed
-
No access to AGL Substations until AGL AP is present on site
-
AGL AP /SP supervision has confirmed site is safe to enter and no alarms present
-
Name of AGL AP/SP representation
-
Can you confirm you have signed onto the Site sign in book.
-
Please sign the works in the book and take a photo
-
Please take a photo of the sign in book
-
There is no sign in book on site
-
All personnel entering UKPNS location must have correct CP1 training and correct PPE as per instruction under the RAMs
-
Time APOC called to confirm no alarms present and access permitted
-
Can you confirm you have signed onto the Site sign in book.
-
Please sign the works in the book and take a photo
-
Please take a photo of the sign in book
-
There is no sign in book on site
-
Time APOC called to confirm no alarms present and confirmed we have left the area
-
Name of APOC Engineer
-
Can you confirm the access door is secure and locked after departure
-
Have Barriers and Site Signage been set up and are Suitably Erected
-
Stop works until the Barriers have been erected and the site signage is in place
-
Works do not require Barriers, The site works folder and RAMs are present and visible on
site in line with the requirements set out within the RAMs -
Photos, (Showing working location prior to work commencing)
-
Photos, (Please capture photos of the team working)
-
Detailed time line of working events
-
Before You Leave
-
Photos of works completed
-
Have you left the task area in SAFE condition?
-
Have you cleaned and tidied up the task work area after the job?
-
End time and Date:
-
Task / Job Closed Out By:
End of Shift Report and Issues
-
Shift Update (Give a detailed site report on all works completed)
-
Supervisor comments (notification, escalations, make ready needs for next shift)
-
Add photo of DABs/NABs sheet
-
Add photo of POWRA sheets
-
End of Job/Task
-
Did the job require to be stopped at any time for Health and safety reasons?
-
What Health and safety reasons did the job need to be stopped for?
-
Has the works created any new HAZARDS?
-
Please detail any new Hazards created.
-
Have there been any complaints or interactions the SPSE should be made aware of?
-
Please detail any complaints.
-
Are there any lessons learnt for next time?
-
What lessons learnt are there?