Information
-
Document No.
-
Audit Title
-
Site Manager / Site details
-
Conducted on
-
Prepared by
-
Location
-
Site Personnel
REVIEW OF ACTIONS FROM PREVIOUS AUDIT(S)
-
Have actions from previous audits been closed out satisfactorily, within the agreed timescales?
SITE SET-UP
-
Is site access & egress suitable and safe for both workers and others affected by the site?
-
Are members of the public safe?
-
Is the site secure?
-
Are there appropriate and sufficient warning signs and notices in place?
-
Is a Health and Safety Law Poster displayed?
-
Is an Employers Liability Certificate displayed?
-
Does the site have a pocket notice board and is it used effectively?
-
Are Company Policies displayed? (H&S / ENV / D&A / Fatigue / Other)
-
-
Do the welfare facilities meet the required standard?
SITE MANAGEMENT
-
Is a Construction Phase Plan available on site?
-
Is the site management team suitably qualified (e.g. SMSTS / SSSTS) & are there sufficient managers / supervisors to manage the site safely?
-
Have all workers on site signed to acknowledge having received a Site Induction?
-
Does the site hold copies of the competence of all workers on site?
-
Are all workers wearing suitable P.P.E. In accordance with site / task requirements?
-
Does the site hold a reasonable stock of replacement / task specific P.P.E.?
-
Do all workers appear fit for duty and competent?
-
Are the First Aid arrangements appropriate for the type of work and number of workers on site? Are named First Aiders on site?
-
Are the fire safety arrangements appropriate for the level of risk? (Is there a Fire Safety Plan?)
-
Are there adequate arrangements in place to manage the storage and use of fuels, L.P.G. And other flammable liquids?
-
Are the standards of housekeeping delivering a safe site?
-
Has a Site Waste Management Plan been prepared and kept up-to-date?
-
Is work around buried and overhead services managed safely?
SAFE SYSTEMS OF WORK
-
Are Method Statements, Risk & Coshh assessments ( or Work Package Plans & Task Briefs) used effectively to control key tasks?
-
Are Permits to Work used where appropriate?
-
- Access to premises
- Confined space
- Electrical work
- Excavation
- Hot works
- Lifting
- Pressurised systems
- Work at height
- Work near water
-
Have Coshh assessments been prepared and briefed to workers?
MANAGING TASKS / EQUIPMENT / SITE RECORDS
-
Are plant, tools, equipment and materials stored safely?
-
Are plant, tools and equipment properly managed and operated / used by workers competent to do so?
-
Are test and examination records available for all plant, tools and equipment?
-
Are those carrying out work at height tasks doing so safely?
-
Are appropriate protection measures in place to protect workers from falls from height / into excavations / from vehicles?
-
Are scaffold / ladder / stepladder inspection records available?
-
Are excavations safe and inspection records available?
-
Are operations involving lifting equipment / hoists managed safely?
-
Are arrangements in place to manage the exposure of workers to risk from noise?
-
Are arrangements in place to manage the exposure of workers to risks from vibration, including vibration exposure records for all workers?
-
Are arrangements in place to manage the exposure of workers to manual handling risks?
-
Are arrangements in place to manage the exposure of workers to risks from harmful chemicals, dusts and fumes?
-
Are arrangements in place to manage risks from electrical equipment and installations?
-
Is the site diary up to date?
-
Are relevant toolbox talks delivered regularly?
-
Have any accidents / incidents ( including near misses & close calls) been recorded?
-
Have they been managed appropriately and closed out satisfactorily in a timely manner?
-
Has the site received any commendations / complaints?
-
Has appropriate action been taken?
FACTORS SPECIFIC TO THE ENVIRONMENT
-
Is a pollution incident control plan in place?
-
Has an Environmental Management Plan been created for the project?
-
Is there an E.M.P. implementation schedule and has it been complied with?
-
Does the E.M.P. identify applicable legislation?
-
Does the E.M.P. include a site specific environmental aspects and impacts register?
-
Does the E.M.P. identify vulnerable watercourses?
-
Does the E.M.P. identify vulnerable flora and fauna?
-
Does the E.M.P. identify contaminated land?
-
Does the E.M.P. include a noise / vibration management plan
-
Does the E.M.P. include a traffic management plan?
FACTORS SPECIFIC TO RAIL SITES
-
If the project includes rail-related work click 'add rail site'
Add rail site
-
Do the W.P.P.'s and Task Briefs comply with the format prescribed by Network Rail?
-
Are all necessary W.P.P.'s and Task Briefs approved and in use?
-
Do Task Briefs clearly identify persons authorised to operate plant, or how this information will be provided if names are not known at the time the T.B. Is prepared?
-
Is there evidence that Task Briefs are delivered to the workforce before every shift?
-
Are the emergency communication arrangements suitable and robust?
-
Is all work being carried out in a High Street environment?
-
Can all workers produce a valid P.T.S. card or Track Visitor Permit?
-
Is the C.O.S.S. readily identifiable, adequately briefed and familiar with the site location?
-
Did the C.O.S.S. receive his S.S.O.W. pack at least 24 hours before the shift started? If not was permission obtained prior to implementation?
-
Have all workers received a C.O.S.S. brief and signed his briefing record sheet?
-
Are all required permits in place? e.g. Possession, Overhead or 3rd rail isolation, A.L.O. etc.
-
Has Lookout / Site Warden been appointed and are they positioned satisfactorily?
FACTORS SPECIFIC TO MAINS WATER SUPPLY WORKS
-
If the project includes mains water supply work click ' add mains water supply'
Mains water supply
-
Can all workers produce a National Water Hygiene Card?
-
Do all workers understand and comply with illness and personal hygiene rules?
-
Are the rules governing P.P.E. complied with?
-
Are the rules governing the use of vehicles complied with?
-
Are contamination prevention measures being applied?
-
Are the materials used approved for use on the water supply network?
-
Are materials stored appropriately?
-
Are suitable controls applied when Chlorine is used?
-
Are subcontractors approved for work on the water supply network?
SAFETY AWARD NOMINATIONS
-
Does the Site Manager wish to nominate anybody for the company individual safety award?
-
Is the site a contender for consideration as a British Safety Council International Safety Award entry?
AUDITORS COMMENTS (optional)
-
Site representative's signature
-
Auditor's signature