Information

  • Document No.

  • Audit Title

  • Site Manager / Site details

  • Conducted on

  • Prepared by

  • Location
  • Site Personnel

REVIEW OF ACTIONS FROM PREVIOUS AUDIT(S)

  • Have actions from previous audits been closed out satisfactorily, within the agreed timescales?

SITE SET-UP

  • Is site access & egress suitable and safe for both workers and others affected by the site?

  • Are members of the public safe?

  • Is the site secure?

  • Are there appropriate and sufficient warning signs and notices in place?

  • Is a Health and Safety Law Poster displayed?

  • Is an Employers Liability Certificate displayed?

  • Does the site have a pocket notice board and is it used effectively?

  • Are Company Policies displayed? (H&S / ENV / D&A / Fatigue / Other)

  • Do the welfare facilities meet the required standard?

SITE MANAGEMENT

  • Is a Construction Phase Plan available on site?

  • Is the site management team suitably qualified (e.g. SMSTS / SSSTS) & are there sufficient managers / supervisors to manage the site safely?

  • Have all workers on site signed to acknowledge having received a Site Induction?

  • Does the site hold copies of the competence of all workers on site?

  • Are all workers wearing suitable P.P.E. In accordance with site / task requirements?

  • Does the site hold a reasonable stock of replacement / task specific P.P.E.?

  • Do all workers appear fit for duty and competent?

  • Are the First Aid arrangements appropriate for the type of work and number of workers on site? Are named First Aiders on site?

  • Are the fire safety arrangements appropriate for the level of risk? (Is there a Fire Safety Plan?)

  • Are there adequate arrangements in place to manage the storage and use of fuels, L.P.G. And other flammable liquids?

  • Are the standards of housekeeping delivering a safe site?

  • Has a Site Waste Management Plan been prepared and kept up-to-date?

  • Is work around buried and overhead services managed safely?

SAFE SYSTEMS OF WORK

  • Are Method Statements, Risk & Coshh assessments ( or Work Package Plans & Task Briefs) used effectively to control key tasks?

  • Are Permits to Work used where appropriate?

  • Have Coshh assessments been prepared and briefed to workers?

MANAGING TASKS / EQUIPMENT / SITE RECORDS

  • Are plant, tools, equipment and materials stored safely?

  • Are plant, tools and equipment properly managed and operated / used by workers competent to do so?

  • Are test and examination records available for all plant, tools and equipment?

  • Are those carrying out work at height tasks doing so safely?

  • Are appropriate protection measures in place to protect workers from falls from height / into excavations / from vehicles?

  • Are scaffold / ladder / stepladder inspection records available?

  • Are excavations safe and inspection records available?

  • Are operations involving lifting equipment / hoists managed safely?

  • Are arrangements in place to manage the exposure of workers to risk from noise?

  • Are arrangements in place to manage the exposure of workers to risks from vibration, including vibration exposure records for all workers?

  • Are arrangements in place to manage the exposure of workers to manual handling risks?

  • Are arrangements in place to manage the exposure of workers to risks from harmful chemicals, dusts and fumes?

  • Are arrangements in place to manage risks from electrical equipment and installations?

  • Is the site diary up to date?

  • Are relevant toolbox talks delivered regularly?

  • Have any accidents / incidents ( including near misses & close calls) been recorded?

  • Have they been managed appropriately and closed out satisfactorily in a timely manner?

  • Has the site received any commendations / complaints?

  • Has appropriate action been taken?

FACTORS SPECIFIC TO THE ENVIRONMENT

  • Is a pollution incident control plan in place?

  • Has an Environmental Management Plan been created for the project?

  • Is there an E.M.P. implementation schedule and has it been complied with?

  • Does the E.M.P. identify applicable legislation?

  • Does the E.M.P. include a site specific environmental aspects and impacts register?

  • Does the E.M.P. identify vulnerable watercourses?

  • Does the E.M.P. identify vulnerable flora and fauna?

  • Does the E.M.P. identify contaminated land?

  • Does the E.M.P. include a noise / vibration management plan

  • Does the E.M.P. include a traffic management plan?

FACTORS SPECIFIC TO RAIL SITES

  • If the project includes rail-related work click 'add rail site'

  • Add rail site
  • Do the W.P.P.'s and Task Briefs comply with the format prescribed by Network Rail?

  • Are all necessary W.P.P.'s and Task Briefs approved and in use?

  • Do Task Briefs clearly identify persons authorised to operate plant, or how this information will be provided if names are not known at the time the T.B. Is prepared?

  • Is there evidence that Task Briefs are delivered to the workforce before every shift?

  • Are the emergency communication arrangements suitable and robust?

  • Is all work being carried out in a High Street environment?

  • Can all workers produce a valid P.T.S. card or Track Visitor Permit?

  • Is the C.O.S.S. readily identifiable, adequately briefed and familiar with the site location?

  • Did the C.O.S.S. receive his S.S.O.W. pack at least 24 hours before the shift started? If not was permission obtained prior to implementation?

  • Have all workers received a C.O.S.S. brief and signed his briefing record sheet?

  • Are all required permits in place? e.g. Possession, Overhead or 3rd rail isolation, A.L.O. etc.

  • Has Lookout / Site Warden been appointed and are they positioned satisfactorily?

FACTORS SPECIFIC TO MAINS WATER SUPPLY WORKS

  • If the project includes mains water supply work click ' add mains water supply'

  • Mains water supply
  • Can all workers produce a National Water Hygiene Card?

  • Do all workers understand and comply with illness and personal hygiene rules?

  • Are the rules governing P.P.E. complied with?

  • Are the rules governing the use of vehicles complied with?

  • Are contamination prevention measures being applied?

  • Are the materials used approved for use on the water supply network?

  • Are materials stored appropriately?

  • Are suitable controls applied when Chlorine is used?

  • Are subcontractors approved for work on the water supply network?

SAFETY AWARD NOMINATIONS

  • Does the Site Manager wish to nominate anybody for the company individual safety award?

  • Is the site a contender for consideration as a British Safety Council International Safety Award entry?

AUDITORS COMMENTS (optional)

  • Site representative's signature

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.