Title Page

  • Contract Number / Name

  • Conducted on

  • Location
  • Weather
  • Inspection carried out by This

  • Confirmation of the duty holders Principle Contractor (PC) / Project Supervisor Construction Stage (PSCS).

  • Confirmation of Principle Designer (PD) / Project Supervisor Design Process (PSDP)

Onsite Project Safety Checklist

Site Access and Egress + Traffic Management

  • Are all routes of access and egress safe and clear to and from the site?

  • Are all the approach signs on the public road in line with current regulations?

  • Is there a Traffic Management Plan in place?

  • Are all the warning / directional signs in place as per the TMP?

  • Has relevant sections of the Traffic Management Plan been briefed to relevant parties?

  • Is there site appropriately secured off?

  • Is there any additional site security required (e.g Gate Person / CCTV Pods/ Wildlife Cameras)

  • Is there a "Qcode" sign in place at the site entrance to

Welfare Facilities

  • Are there adequate welfare facilities for workers including toilets, hand washing facilities, rest areas, and drinking water ?

  • Is there segregated toilets in place (male / female)?

  • Are there means of heading up food?

  • Is there hot running water onsite, with soap for washing hand and dishes?

  • Has a drying room been provided which is sufficient for current and predicted project team ?

  • Confirm that all the welfare facilities are cleaned and maintained on a regular basis?

  • Is there external smoking / vaping facilities in place.

  • Is there "NO smoking" + "No Vaping" signs in place within the footprint of the welfare units?

  • Is the office environment sufficiently been set up, in line with DSE Guidelines? Correct Desks / Chairs / Screens etc.

  • Confirm that potable (non drinking) water is in place with a secure delivery

  • Confirm drinking / bottled water + dispensers are in place for all to use.

  • Has the water dispenser being serviced / cleaned? State Adman Number + Date?

Site Setup

  • Is there informational signage in place?

  • Is there directional signage to get to the main compound?

  • Is there enough parking facilities for the current and expected project team?

  • Is there a Muster Point displayed?

  • Is there a safe section for site staff to park

  • Contractors compound in place for parking plant and store materials

  • Confirm segregation for pedestrians around the compound area?

Visible Safety Information

  • Has notice to the Health and Safety Authorities (HSA) / Health and Safety Exceutive Northern Ireland (HSENI)

  • Has the NI10 (Northern Ireland) / AF2 (Republic of Ireland) document displayed at the site entrance and within the main compound?

  • Are Adman Civil Project's company insurances on displayed?

  • Are the insurances displayed in date?

  • Is the HSENI poster “Health and Safety the Law and You” or Health and Safety ‘What you need to know’ on display in the site office and completed?

  • Is a sign in/out QCode in place and in use?

  • If not is there a back up muster sign in book?

  • Is the address and contact number for the nearest Hospital on display in the site office?

  • Is the First Aider poster displayed?

  • Is the Fire Marshall posters displayed?

  • Are current relevant safety Critical Information available and on display in the Site Offices (Top 5 Risks)?

  • Are the current relevant Environmental risks displayed onsite (Top 5 Risks)?

  • A current "Training Matrix" displayed.

  • Is the White Board in place, with a site drawing and all information current and relevant?

  • Site management "Who are we" (Hierarchy Chart) displayed - with photographs of head shots?

  • Is the Job Specific Safety Plan / Daily Risk Assessment in place and in view for all to read, understand and sign off

  • Are the "Site Rules" in place and specific to the site and its current set up?

  • Are all project contact numbers on display - Emergency Contact Numbers?

  • Are the Company Policies displayed and in date - not older than 12 months?

  • Are "What3Words" displayed at the site entrance and in the main compound?

Construction Safety Documentation

  • Is pre construction information available?

  • Is a Construction Safety Plan (CPP) / Construction Stage Health and Safety Plan (CSHSP) available?

  • Is there a Construction Environmental Plan in place?

  • Is there a Traffic Management Plan available?

  • Is there a Fire / Emergency Plan in place?

  • Are Method Statements / Risk Assessments in place for current works?

  • Have these been reviewed by the project team?

  • Is there a Site Safety Induction in place?

Onsite Procedures

  • Confirm that the sites "Sign in/out" is in place and effective?

  • Following the completion of the Site Induction, is there a system in place where site team members are briefed on the site setup / JSSP / MSRA / Site Rules etc

  • Confirm a member of the site team, who is currently working on the site has been inducted and has the correct training cards for the task.

  • Confirm MSRA been communicated to the team on the ground and evidence of signatures from the team?

  • Confirm the JSSP been communicated to the team on the ground and evidence of signatures from the team?

  • Are there TBT scheduled weekly?

  • Is the "Good Catch" Incentive scheme in place

  • Has a poster been displayed to communicate to others?

Competences and Training

  • Has induction training been received by everybody working on site?

  • Are training records available for all staff on site?

  • Are sub-contractors that are onsite approved by by ACPL?

  • Have the MSRA's / Lift Plans and any other documents submitted by the subcontractor been reviewed by the Site Management team / SHEQ?

  • Within ROI only all subcontractor must have a copy of their Health and Safety Policy, this must be signed off by their employee

  • Are competencies of subcontractors and people working on site adequate?

Safety Monitoring

  • Is there a Safety Inspection / Audit Schedule in place? (SHEQ By weekly / Site Manager Weekly / PM Monthly)

  • Has the SHEQ Advisor completed Audit Inspection?

  • Has the Site Manager completed weekly site safety Inspections?

  • Hss the Project Manager completed Monthly Audits?

  • Are the results of safety audits communicated to people on site?

  • Are safety audit follow up actions being implemented?

  • Is there a need for a duty chart - in order to assign duties?

Emergency Procedures

  • Is an adequate emergency plan in place?

  • Has this been communicated to the site team?

  • Are the "grab and go" and the back of the plan easily assessable by the site team?

  • Is the necessary First Aid box onsite?

  • Is there a Eye Wash Station onsite?

  • Is there a burns Kit onsite?

  • Has all of the First Aid equipment been checked to be in date?

  • Is there a stretcher onsite?

  • Is there sufficient Fire Fighting Equipment onsite?

  • Are there smoke alarms onsite - (welfare units)?

  • Are there CO2 monitors onsite - (welfare units)?

  • Are people available on site who are trained in First Aid?

  • Are adequate rescue and evacuation procedures in place on site?

  • Are people on site familiar with the emergency and rescue procedures?

  • Have any of ACPL emergency drills been carried out on site?

  • Are there any plans to carry out an Emergency Rescue Drill?

Accident & Incident Reporting

  • Are the site personnel aware of, and implementing, reporting requirements for accidents or dangerous occurrences?

  • Ensure that all onsite personnel are aware of the importance of reporting accidnets and incidents, no matter how small.

  • Ensure all accidents are reported to the Site Management Team as soon as possible.

  • Are there any requirements to report to the Client within a time frame?

  • Is the site management team aware of this? (Example= 30mins after incident - Notify. Within 24hrs 5 w's. Within 2 weeks Draft Report?

Plant, Materials and Equipment

  • Is safety information, Material Safety Data Sheets (MSDS) available for the materials being used on site?

  • Are COSHH Assessments available for materials being used onsite?

  • Are Dust Suppression measures reviewed, and can it be deployed as and when required?

  • Is the plant onsite used accordance with statutory requirements?

  • Has all plant been certified safe via Thorough Examination (NI) / GA1 (ROI) certificates, in date 12months?

  • Has all lifting equipment been expected within the last 6 months?

  • Are all Plant and Lifting accessories on the LOLER / PUWER (NI) register and inspected weekly. GA2 Document (ROI)?

  • Are all ladders / Podiums inspected and checked weekly?

  • Are all excavations inspected at the start of each shift and recorded weekly?

  • Any working at Height (Scaffolding / Aluminium Towers ) structures being expected at the start of each shift and recorded weekly?

  • Are Daily Plant Inspections being completed?

  • Are these being submitted at the end of each working week?

Communication and Interfaces

  • Are weekly Tool Box Talks being completed?

  • Are there sufficient time allowed for all workers to express or challenge safety information?

  • Has a Safety Rep been selected by the site team?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.