Title Page
-
Contract Number / Name
-
Conducted on
-
Location
-
Weather
-
Inspection carried out by
-
Job Role
-
Confirmation of the duty holders Principle Contractor (PC) / Project Supervisor Construction Stage (PSCS).
-
Confirmation of Principle Designer (PD) / Project Supervisor Design Process (PSDP)
Onsite Project Safety Checklist
Site Access and Egress + Traffic Management
-
Are all routes of access and egress safe and clear from obstructions?
-
Are all the approach signs on the public road in line with current regulations?
-
Is there a Traffic Management Plan in place?
-
Are all the warning / directional signs in place as per the TMP?
-
Has relevant sections of the Traffic Management Plan been briefed to relevant parties?
-
Is the site appropriately secured off?
-
Additional site security required (e.g Gate Person / CCTV Pods/ Wildlife Cameras)?
-
Is there a "QRcode" sign in place at the site entrance?
Welfare Facilities
-
Adequate welfare facilities for workers including toilets, hand washing facilities (warm water + soap), rest areas, and drinking water ?
-
Adequate toilet facilities in place?
-
Is there means of heating up food?
-
Drying room been provided which is adequate for current and predicted project team ?
-
Confirm all welfare facilities are cleaned and maintained on a regular basis?
-
Is there external smoking / vaping facilities in place?
-
Is there "NO smoking" + "No Vaping" signs in place within the footprint of the welfare units?
-
Is the office environment been set up, in line with DSE Guidelines? Correct Desks / Chairs / Screens etc.
-
Confirm that potable (drinking) water is in place with a secure delivery?
-
Confirm drinking / bottled water + dispensers are in place for all to use.
-
Has the water dispenser being serviced / cleaned? State Adman Number + Date?
Site Setup
-
Is there sufficent WiFi in place for the site management team?
-
Sufficent Stationary onsite ?
-
Is there informational signage in place? (Speed Restrictions / PPE / One Way Sysyems / Warning Signs etc)
-
Is there directional signage to get to the main compound?
-
Is there enough parking facilities for the current and expected project team?
-
Is there a Muster Point displayed?
-
Is there a safe section for site staff to park
-
Reverse parking signs displayed?
-
Contractors compound in place for parking plant and store materials
-
Confirm segregation of plant and pedestrians around the compound area?
-
Confirm adequate management resources for safe delivery of project?
Visible Safety Information
-
Has notice been given to the Health and Safety Authorities (HSA) / Health and Safety Exceutive Northern Ireland (HSENI)
-
Has the NI10 (Northern Ireland) / AF2 (Republic of Ireland) document been displayed at the site entrance and within the main compound?
-
Are Adman Civil Project's company insurances on display?
-
Are the insurances displayed in date?
-
Is the HSENI poster “Health and Safety the Law and You” or Health and Safety ‘What you need to know’ on display in the site office and completed?
-
Is a sign in/out QRCode in place and in use?
-
If not is there a back up muster sign in book?
-
Is the address and contact number for the nearest Hospital on display in the site office?
-
First Aider poster displayed?
-
Fire Marshall posters displayed?
-
Are current relevant safety Critical Information available and on display in the Site Offices (Top 5 Risks)?
-
Are the current relevant Environmental risks displayed onsite (Top 5 Risks)?
-
A current "Training Matrix" displayed.
-
Is the White Board in place, with a site drawing and all information current and relevant?
-
Site management "Who are we" (Hierarchy Chart) displayed - with photographs of head shots?
-
Is the Job Specific Safety Plan / Daily Risk Assessment in place and in view for all to read, understand and sign off
-
Are the "Site Rules" in place and specific to the site and its current set up?
-
Are all project contact numbers on display - Emergency Contact Numbers?
-
Are the Company Policies displayed and in date - not older than 12 months?
-
Are "What3Words" displayed at the site entrance and in the main compound?
-
Is there adequate internet provisions for the site management team?
Construction Safety Documentation
-
Is pre construction information available?
-
Is a Construction Safety Plan (CPP) / Construction Stage Health and Safety Plan (CSHSP) available?
-
Construction Environmental Plan in place?
-
Traffic Management Plan available?
-
Fire / Emergency Plan in place?
-
Has this been communicated to the site team? How.
-
Method Statements / Risk Assessments in place for current works?
-
Have these been reviewed by the project team?
-
Is there a Site Safety Induction in place?
Onsite Procedures
-
Confirm that the sites "Sign in/out" is in place and effective?
-
Following the completion of the Site Induction, is there a system in place where site team members are briefed on the site setup / JSSP / MSRA / Site Rules etc
-
Confirm a member of the site team, currently working on the site has been inducted and has the correct training cards for the task.
-
Confirm MSRA communicated to the team on the ground and evidence of signatures from the team?
-
Confirm the JSSP / DRA has been communicated to the team on the ground and evidence of signatures from the team ?
-
Evidence of TBT scheduled weekly?
-
Is the "Good Catch" Incentive scheme in place and effective?
-
Has a poster been displayed to communicate to others?
Competences and Training
-
Has induction training been received by everybody working on site?
-
Are training records available for all staff on site?
-
Are sub-contractors that are onsite approved by by ACPL?
-
Have the MSRA's / Lift Plans and any other documents submitted by the subcontractor been reviewed by the Site Management team / SHEQ?
-
ROI only all subcontractor must have a copy of their Health and Safety Policy, this must be signed off by their employee
-
Has a Temporary Works Co-ordinator been appointed?
-
Confirm individual
-
Are correct procedures in place to control temporary works ?
-
Has an Appoint Person been nominated to coordinate lifting activities?
-
Confirm individual?
-
Are the correct procedures in place to control lifts?
-
Are competencies of subcontractors and people working on site adequate?
Safety Monitoring
-
Is there a Safety Inspection / Audit Schedule in place? (SHEQ By weekly / Site Manager Weekly / PM Monthly)
-
Has the SHEQ Advisor completed Audit Inspection?
-
Confirm date of last inspection.
-
Has the Site Manager completed weekly site safety Inspections?
-
Has the Project Manager completed Monthly Audits?
-
Are the results of safety audits communicated to people on site?
-
Are safety audit follow up actions being implemented?
-
Is there a need for a duty chart - in order to assign duties?
Emergency Procedures
-
Adequate emergency plan in place?
-
Has this been communicated to the site team?
-
Are the "grab and go" and the back of the plan easily assessable by the site team?
-
First Aid box onsite and adequately for number of people and risks associated wit works?
-
Eye Wash Station onsite, suitable and sufficient?
-
Burns Kit onsite?
-
First Aid equipment in good condition, in date and monitored?
-
Is there a stretcher onsite?
-
Fire Fighting Equipment onsite adequate and serviceable?
-
Confirm date of last service.
-
Smoke alarms onsite - (welfare units)?
-
CO2 monitors onsite - (welfare units)?
-
Trained in First Aider on site and known to workers?
-
Are adequate rescue, evacuation procedures in place on site?
-
Confirm these procedures have effectively been communicated to the site team?
-
Have any of ACPL emergency drills been carried out on site?
-
Confirm type and date of last drill.
Accident & Incident Reporting
-
All site personnel aware of, and implementing, reporting requirements for accidents or dangerous occurrences?
-
Ensure that all onsite personnel are aware of the importance of reporting accidnets and incidents, no matter how small.
-
Ensure all accidents are reported to the Site Management Team as soon as possible.
-
Are there requirements to report to the Client within a time frame?
-
Is the site management team aware of this? (Example= 30mins after incident - Notify. Within 24hrs 5 w's. Within 2 weeks Draft Report?
Plant, Equipment and Materials
-
Is safety information, Material Safety Data Sheets (MSDS) available for the materials being used on site?
-
Are COSHH Assessments available for materials being used onsite?
-
Are Dust Suppression measures reviewed, and can it be deployed as and when required?
-
Is the plant onsite used in accordance with statutory requirements?
-
Has all plant been certified safe via Thorough Examination (NI) / GA1 (ROI) certificates, in date 12months?
-
Has all lifting equipment and accessories been expected within the last 6 months?
-
Are all Plant and Lifting accessories on the LOLER / PUWER (NI) register and inspected weekly. GA2 Document (ROI)?
-
Are all ladders / Podiums inspected and checked weekly?
-
Are all excavations inspected at the start of each shift and recorded weekly?
-
Is there an inspection regimes in place for working at height structures (Aluminum Towers / Scaffolding) and recorded?
-
Are Daily Plant Inspections being completed?
-
If these are being completed on hard documents are these being submitted at the end of each working week?
Communication and Interfaces
-
Are weekly Tool Box Talks being completed?
-
Adequate time allowed for all workers to express or challenge safety information?
-
Has a Safety Rep been selected by the site team?
-
Is there a Permit to Work system in place?
-
Confirm Permits are closed out effectively?
Environmental
-
Construction Environmental Management Plan?
-
Waste Management Plan in place?
-
Segragated Waste - with Skips?
-
Adequate COSHH Store onsite
-
Suffiencent means of refuelling plant
-
Sufficent Spill kits in place 240litre onsite
-
All plant (where practical) have 15litre in place
-
COSHH folder in place (MSDS + COSHH RA) for ALL hazardous substances?