Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre-Job Setup
-
The Job Hazard Analysis/Work Method Statement has been reviewed and is posted in the area of work
-
All site specific paper work complete
-
The required permits are posted at the job site
-
Permit conditions understood and followed
-
Traffic control on site
-
Has site fencing/barricades and signage been installed
-
Has all personnel completed an induction
-
Has all personnel attended and signed onto the pre-start meeting
Personal Protective Equipment
-
Are employees wearing PPE correctly
-
Is hearing protection being worn where required
-
Is eye protection being worn where required
-
Are safety harnesses being used where required
-
Safety harnesses in good condition and tagged
-
Is employee wearing double eye protection when required
Housekeeping
-
Is the work area well arranged and free of trip hazards
-
Are the nails removed from the timbers
-
Adequate number of refuse containers
-
Clear and unobstructed access and egress to work area
-
Are Fencing/barricades in place
Environment
-
Is there adequate ventilation
-
Is there adequate lighting
-
Is there any evidence of fibres (asbestos etc)
-
Is dust kept to an except able level
-
Has oils, contaminated water etc spilled
Machinery / Plant
-
Does the operator hold the appropriate ticket and competency
-
Is there a barricade around the machinery
-
Is the machine per-start checklist completed
-
Are name plates/controls legible
-
Has maintenance schedules been maintained
-
Is high vis clothing worn around machinery
Power Tools
-
Are guards and safety devises in place and in good working condition
-
Is the employee using the tool correctly
-
Has the power tools been tested and tagged
-
All power tools used through a RCD
Excavations
-
Is access provided for entry and exit of the excavation
-
Are barricades provided around excavations
-
Are barricades placed clear from edge
-
Are trenches shored or battered
-
Is the spoilage placed at least 1 meter from the edge
Electricity
-
Are leads in good condition
-
Are extension leads protected from damage
-
Are electrical leads placed 2 meters above walkways
-
Is RCD in good working condition
-
has site shed/office been tested and tagged
-
Has the temp builders power been tested and tagged
Confined Spaces
-
Is there a confined space permit
-
Have entrants, entry supervisor and hole watch been trained
-
Was JHA/WMS performed and documented
Job Hazard Analysis and/or Work Method Statement
-
Has the JHA/WMS been completed for the activity being undertaken
-
Is the JHA/WMS current
-
Has the JHA/WMS been completed correctly
-
Is the JHA/WMS on the job site with personnel
-
Has the JHA/WMS been signed by all personnel
Risk of falling (persons and objects) Working at Hieghts
-
Does the work need to be done at heights (can it be done on the ground)
-
Is the scaffold complete and scaffold tag in date
-
Has mobile scaffold been erected by a competent person
-
Are three points of contact maintained while using ladders
-
Have all persons wearing harnesses been height trained
-
Are lanyards connected at all times
-
Has falling objects been identified and controlled
Post Scope Works
-
Job site cleaned up
-
Barricades removed from site
-
Plant, equipment and material removed from site
-
Final clean up on site carried out
-
Post clean up on site carried out
-
Final inspection carried out
-
Site Supervisor/Foreman
-
Auditor