Title Page

  • COF Reference

  • Site survey conducted on

  • Location of site survey
  • Engineer name

Uplift, Install and Resite

  • Please add a site survey here

  • Site survey
  • Uplift, Install or Resite?

Machine details

  • Make and model of machine

  • ID Number?

  • Serial Number

  • For installs and resites will the machine fit on in the new site?

  • Are all services available?

  • What are the changes to be made? And who is going to implement them?

Entering and parking

  • Permission to park lorry for duration of install (Detail any size restrictions)?

  • Which type of vehicle is this suitable for, 3.5/7.5 or 18 tonne vehicles?

  • Is ID required to enter premises?

  • What are the access times for the site?

  • Method statement/risk assessment required?

  • Width Limits?

  • Steps involved? Yes/No

  • Number of steps?

  • Any images related to entering and parking please upload here

Location of the machine

  • What is the proposed location?

  • Is there lift access?

  • Please describe what heavy machinery is needed? e.g Stair walker, securing brackets?

  • Advise the number of doors on site?

  • What is the smallest sized door?

  • Dimensions of facia/alcove?

  • Please draw the room layout (if necessary)

  • Please input special instructions (if any)

  • Any images related to the location please upload here

Stairs

  • Are stairs to be used?

  • Number of flights and stairs per flight?

  • Location?

  • Type of stairs? - Wood, metal, marble etc.

  • Width of stairs? - Between rails

  • Stair cappings secure?

  • Height of staircase?

  • Please describe the dimensions of the lift. A - Width, B - Depth and C - Door width. Please describe height if necessary.

  • A?

  • B?

  • C?

  • Please describe the dimensions for landings. A - Width and B - Depth. Please describe height if necessary.

  • A?

  • B?

Electrical

  • Please specify the type of electrical outlet? e.g 13 amp or switched spur?

  • Are all wall sockets accessible?

  • How many are accessible? Is the customer aware of this?

  • Where is the isolation point located for the electrical supply?

  • Any images related to electrics please upload here

  • If you were denied any of these questions please state a name and a contact number for queries

Water supply

  • Is the water supply direct from a rising main/approved drinking water storage tank?

  • Is the pipe run feeding the unit satisfactorily?

  • Is there an existing drink machine in location?

  • Is a stopcock with 15MM pipe outlet available - Within 1 meter of the proposed location?

Please complete a new site survey for each machine (unless banked)

Save and submit

  • Engineer signature below

  • If you have any comments please add them here

  • Engineer please sign here...

  • Customer signature below

  • If you have any comments please add them here

  • Customer please sign here...

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.