Information
-
Document No IA/004/02/070514
-
Auditor
-
Engineer
-
Audit Title ( enter Type of Audit, WIP, Post Audit, Skills, etc)
-
Conducted on
-
Location
-
Installation Date
Work Type (Please Tick)
-
Enter Work Type
- Service
- Breakdown
- Private Installation
- Carillion Installation
- Local Authority
- Affordable Warmth
Job Type (Please Tick)
-
Enter Job Type
- Combi
- Conv-Conv
- Conv-Combi
- Heating
- New
- Existing
Equipment ( * = MUST CARRY )
(Tools and equipment)
-
U-gauge*
-
Flow cup*
-
S/bombs*
-
Temporary continuity bonds*
-
LDF*
-
Matches
-
Safety Forms*
-
Ref Manuals*
-
RCD*
-
Safety Labels*
-
2 Pole Voltage detector*
-
Plume Tube
-
Clamp Stats*
-
Closure tape
-
Thermometer*
-
Transformer
-
Gas Analyser
Health and Safety ( Are Being Used/Done Safely), Note * at the end of question means engineer Must Have..
-
Capped Boots*
-
Ear Defenders*
-
Hot Work Boards*
-
Eye Protection*
-
First Aid Box*
-
Gloves*
-
Fire Extinguisher 2KG*
-
Fire extinguisher charged and in date*
-
Fire Extinguisher 1KG*
-
Fire extinguisher charged and in date*
-
Hard Hat*
-
Dust Mask*
-
Does engineer have Safety Harness*
-
Safety Harness Serial Number
-
Is the Harness in good condition
-
Report on defects and action taken
Meter and Supply, Competence and knowledge
(Training)
-
Let by Test
-
ECV Labelled
-
Tightness Test
-
Falls To Off
-
Meter working pressure
-
Continuity bonds used*
-
Pipe sizing
-
Governor seal on meter
-
Bonding
-
Visual check*
-
Standing Pressure
Appliance, competence and knowledge ( if applicable please input appliance details being tested)
(Training)
-
Is the engineer being tested on an appliance
-
Make
-
Model
-
Category
-
Flue type
-
Location
-
Visual check
-
Flue Flow
-
Flue in loft adequately supported
-
Inlet pressure
-
Checked kW
-
Spillage
-
Flue Gas Analysis
-
Termination
-
Burner Pressure
-
Zero Gov Let-By
-
Flame Picture
-
Ventilation
-
Flue Route
-
Gas Rate
-
Safety Device
-
Siting
-
Catchment Area
-
Appliance Isolation
-
Fuse Check
Electrical
(Compliance)
-
Does the engineer have a copy of the Unsafe Situations Book on their iPad?
-
Please contact compliance for the Unsafe Situations Book pdf
-
Does the engineer have a copy of the Rules of Registration for Gas Safe?
-
Please contact compliance for the Rules of Registration pdf
-
Does the engineer have the most up to date Risk Assessments, COSHH assessments and Method Statements?
-
Please contact Compliance for the relevant documents.
Unsafe Situation ( Did the operative identify hazards and the unsafe installation procedure), competence and knowledge
(Training)
-
Categorised correctly
-
Gas Supplier Called
-
L/L Safety Report
-
Warning Notice
-
Got customers signature
-
Riddor Report
-
Labelled
-
Capped Appliance
-
Cross Bonding Notice
-
Customer informed
-
Isolated Supply
-
CP1 filled in correctly
-
Defects recorded
-
Capped Meter
PAT Testing
(Compliance)
-
Have all appliances have been PAT tested
Quality of Workmanship
(Quality)
-
Dust Sheets / carpet protector
-
P/W Cleaned
-
Customer Satisfaction
-
Site Clean
-
P/W Clipped
-
Explained Use
-
Brickwork Level
-
P/W Level
-
Holes made good
-
Fitted correctly
-
Condense ok
-
Siting ok
(Customer satisfaction)
-
Floorboards
-
Rubbish Removed
-
Any damage
-
Take pictures of any issues.
Ladders (if FAIL please give reason)
(Tools and equipment)
-
Roof Ladders
-
Registered number
-
Extending ladders
-
Registered Number
-
Step ladders
-
Registered Number
-
Additional Help-Link issued ladders
-
Registered Number
-
Comments
Additional items Required
(Compliance)
-
Gas Safe registration cards available to customer
-
ID cards available to customer
-
Correct uniform
-
Wet specification for Central Heating Systems (includes risk assessment)
-
Tap to enter Sketch or Drawing
Any other comments please write below
-
Comments
Finish
-
Assessors name
-
I, the engineer below hereby accept the following findings and have made the inspecting supervisor aware of any issues and or concerns.
-
Engineers name
-
Select date