Information

  • Document No IA/004/02/070514

  • Auditor

  • Engineer

  • Audit Title ( enter Type of Audit, WIP, Post Audit, Skills, etc)

  • Conducted on

  • Location
  • Installation Date

Work Type (Please Tick)

  • Enter Work Type

Job Type (Please Tick)

  • Enter Job Type

Equipment ( * = MUST CARRY )

(Tools and equipment)

  • U-gauge*

  • Flow cup*

  • S/bombs*

  • Temporary continuity bonds*

  • LDF*

  • Matches

  • Safety Forms*

  • Ref Manuals*

  • RCD*

  • Safety Labels*

  • 2 Pole Voltage detector*

  • Plume Tube

  • Clamp Stats*

  • Closure tape

  • Thermometer*

  • Transformer

  • Gas Analyser

Health and Safety ( Are Being Used/Done Safely), Note * at the end of question means engineer Must Have..

  • Capped Boots*

  • Ear Defenders*

  • Hot Work Boards*

  • Eye Protection*

  • First Aid Box*

  • Gloves*

  • Fire Extinguisher 2KG*

  • Fire extinguisher charged and in date*

  • Fire Extinguisher 1KG*

  • Fire extinguisher charged and in date*

  • Hard Hat*

  • Dust Mask*

  • Does engineer have Safety Harness*

  • Safety Harness Serial Number

  • Is the Harness in good condition

  • Report on defects and action taken

Meter and Supply, Competence and knowledge

(Training)

  • Let by Test

  • ECV Labelled

  • Tightness Test

  • Falls To Off

  • Meter working pressure

  • Continuity bonds used*

  • Pipe sizing

  • Governor seal on meter

  • Bonding

  • Visual check*

  • Standing Pressure

Appliance, competence and knowledge ( if applicable please input appliance details being tested)

(Training)

  • Is the engineer being tested on an appliance

  • Make

  • Model

  • Category

  • Flue type

  • Location

  • Visual check

  • Flue Flow

  • Flue in loft adequately supported

  • Inlet pressure

  • Checked kW

  • Spillage

  • Flue Gas Analysis

  • Termination

  • Burner Pressure

  • Zero Gov Let-By

  • Flame Picture

  • Ventilation

  • Flue Route

  • Gas Rate

  • Safety Device

  • Siting

  • Catchment Area

  • Appliance Isolation

  • Fuse Check

Electrical

(Compliance)

  • Does the engineer have a copy of the Unsafe Situations Book on their iPad?

  • Please contact compliance for the Unsafe Situations Book pdf

  • Does the engineer have a copy of the Rules of Registration for Gas Safe?

  • Please contact compliance for the Rules of Registration pdf

  • Does the engineer have the most up to date Risk Assessments, COSHH assessments and Method Statements?

  • Please contact Compliance for the relevant documents.

Unsafe Situation ( Did the operative identify hazards and the unsafe installation procedure), competence and knowledge

(Training)

  • Categorised correctly

  • Gas Supplier Called

  • L/L Safety Report

  • Warning Notice

  • Got customers signature

  • Riddor Report

  • Labelled

  • Capped Appliance

  • Cross Bonding Notice

  • Customer informed

  • Isolated Supply

  • CP1 filled in correctly

  • Defects recorded

  • Capped Meter

PAT Testing

(Compliance)

  • Have all appliances have been PAT tested

Quality of Workmanship

(Quality)

  • Dust Sheets / carpet protector

  • P/W Cleaned

  • Customer Satisfaction

  • Site Clean

  • P/W Clipped

  • Explained Use

  • Brickwork Level

  • P/W Level

  • Holes made good

  • Fitted correctly

  • Condense ok

  • Siting ok

(Customer satisfaction)

  • Floorboards

  • Rubbish Removed

  • Any damage

  • Take pictures of any issues.

Ladders (if FAIL please give reason)

(Tools and equipment)

  • Roof Ladders

  • Registered number

  • Extending ladders

  • Registered Number

  • Step ladders

  • Registered Number

  • Additional Help-Link issued ladders

  • Registered Number

  • Comments

Additional items Required

(Compliance)

  • Gas Safe registration cards available to customer

  • ID cards available to customer

  • Correct uniform

  • Wet specification for Central Heating Systems (includes risk assessment)

  • Tap to enter Sketch or Drawing

Any other comments please write below

  • Comments

Finish

  • Assessors name

  • I, the engineer below hereby accept the following findings and have made the inspecting supervisor aware of any issues and or concerns.

  • Engineers name

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.