Title Page

  • Hallmark Homes Slab Measure Checklist

  • Job No.

  • Prepared by

  • Conducted on

  • Site signage installed and visible

  • Sediment & Erosion control installed or booked in

  • Portable WC on site & within site boundaries

  • House siting check, check side and front setback are as per site plan (approx check)

  • Drainage pipe work positioned as per floor plan

  • Telstra conduits installed

  • Power conduits installed

  • Are conduits required for power or water inside slab

  • Slab measure complete

  • Earth rod installed in diagonal corners

Instructions given to concrete over the phone

  • Person spoken to:

  • Select date

  • Additional comments

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.