Information
-
Document No.
-
Client/Site
-
Conducted on
-
Prepared by
- Ian.McLackland@sodexo.com
- Jamie.Clark@sodexo.com
- Terry.Lapsley@sodexo.com
- Garry.Bowering@sodexo.com
- Matthew.Evers@sodexo.com
- Steve.Everall@sodexo.com
- Lynn.Keily@sodexo.com
- Christine.Ebanks@sodexo.com
- Mazafar.Hussain@sodexo.com
-
Location
Block A
Duration tests
-
Is this the monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/time monthly test finished, record on check sheet below lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/time 3hr duration test finished, record on check sheet below lights not active at end of test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished, record on check sheet below lights not active at end of test.
Block A Level 5
-
Block A Level 5 Stairwell
-
Block A Level 5 External
Block A Level 6
-
Block A Level 6 Stairwell
-
Block A Level 6 Corridor
-
Block A Level 6 Flat 1
-
Block A Level 6 Flat 2
-
Block A Level 6 Flat 4
Block A Level 7
-
Block A Level 7 Stairwell
-
Block A Level 7 Corridor
-
Block A Level 7 Flat 5
-
Block A Level 7 Flat 6
-
Block A Level 7 Flat 8
Block A Level 8
-
Block A Level 9 Stairwell
-
Block A Level 9 Corridor
-
Block A Level 8 Flat 9
-
Block A Level 8 Flat 10
-
Block A Level 8 Flat 12
Block A Level 9
-
Block A Level 9 Stairwell
-
Block A Level 9 Corridor
-
Block A Level 9 Flat 13
-
Block A Level 9 Flat 14
-
Block A Level 9 Flat 16
Block A Level 10
-
Block A Level 10 Stairwell
-
Block A Level 10 Corridor
-
Block A Level 10 Flat 17
-
Block A Level 10 Flat 18
-
Block A Level 10 Flat 20
Block A Level 11
-
Block A Level 11 Stairwell
-
Block A Level 11 Corridor
-
Block A Level 11 Flat 21
-
Block A Level 11 Flat 22
-
Block A Level 11 Flat 24
Block A Level 12
-
Block A Level 12 Stairwell
-
Block A Level 12 Corridor
-
Block A Level 12 Flat 25
-
Block A Level 12 Flat 26
-
Block A Level 12 Flat 28
Block A Level 13
-
Block A Level 13 Stairwell
-
Block A Level 13 Corridor
-
Block A Level 13 Flat 29
-
Block A Level 13 Flat 30
-
Add signature
Block B
Duration Tests
-
Is this the monthly flick test, March test or September test?
-
Date/Time monthly test started (all emergency lights activated)
-
Date/Time monthly test finished, record on check sheet below lights not active during test
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below lights not active at end of test.
Block B Level 5
-
Block B Level 5 Stairwell
-
Block B Level 5 External
Block B Level 6
-
Block B Level 6 Stairwell
-
Block B Level 6 Corridor
-
Block B Level 6 Flat 32
-
Block B Level 6 Flat 33
-
Block B Level 6 Flat 35
-
Block B Level Flat 36
Block B Level 7
-
Block B Level 7 Stairwell
-
Block B Level 7 Corridor
-
Block B Level 7 Flat 37
-
Block B Level 7 Flat 38
-
Block B Level 7 Flat 40
-
Block B Level 7 Flat 41
Block B Level 8
-
Block B Level 8 Stairwell
-
Block B Level 8 Corridor
-
Block B Level 8 Flat 42
-
Block B Level 8 Flat 43
-
Block B Level 8 Flat 45
-
Block B Level 8 Flat 46
Block B Level 9
-
Block B Level 9 Stairwell
-
Block B Level 9 Corridor
-
Block B Level 9 Fat 47
-
Block B Level 9 Flat 48
-
Block B Level 9 Flat 50
-
Block B Level 9 Flat 51
Block B Level 10
-
Block B Level 10 Stairwell
-
Block B Level 10 Corridor
-
Block B Level 10 Flat 52
-
Block B Level 10 Flat 53
-
Block B Level 10 Plant Room
-
Add signature
Block C
Duration Tests
-
Is this the monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time duration test finished. Record on check sheet below lights not active at end of test.
Block C Level 5
-
Block C Level 5 Stairwell
-
Block C Level 5 External
Block C Level 6
-
Block C Level 6 Stairwell
-
Block C Level 6 Corridor
-
Block C Level 6 Flat 55
-
Block C Level 6 Flat 56
-
Block C Level 6 Flat 58
-
Block C Level 6 Flat 59
Block C Level 7
-
Block C Level 7 Stairwell
-
Block C Level 7 Corridor
-
Block C Level 7 Flat 60
-
Block C Level 7 Flat 61
-
Block C Level 7 Flat 63
-
Block C Level 7 Flat 64
Block C Level 8
-
Block C Level 8 Stairwell
-
Block C Level 8 Corridor
-
Block C Level 8 Flat 65
-
Block C Level 8 Flat 66
-
Add signature
Block D
Duration Test
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below lights not active at end of test.
Block D Level 5
-
Block D Level 5 External
-
Block D Level 5 Stairwell
-
Block D Level 5 Flat 68
-
Block D Level 5 Corridor
-
Block D Level 5 Flat 69
-
Block D Level 5 Flat 71
-
Block D Level 5 Flat 72
Block D Level 6
-
Block D Level 6 Stairwell
-
Block D Level 6 Corridor
-
Block D Level 6 Flat 73
-
Block D Level 6 Flat 74
-
Block D Level 6 Flat 76
-
Block D Level 6 Flat 77
Block D Level 7
-
Block D Level 7 Stairwell
-
Block D Level 7 Corridor
-
Block D Level 7 Flat 78
-
Block D Level 7 Flat 79
-
Block D Level 7 Flat 81
-
Block D Level 7 Flat 82
Block D Level 8
-
Block D Level 8 Stairwell
-
Block D Level 8 Corridor
-
Block D Level 8 Flat 83
-
Block D Level 8 Flat 84
-
Block D Level 8 Flat 86
-
Block D Level 8 Flat 87
Block D Level 9
-
Block D Level 9 Stairwell
-
Block D Level 9 Corridor
-
Block D Level 9 Flat 88
-
Block D Level 9 Flat 89
-
Block D Level 9 Plant Room
-
Add signature
Block E
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on the check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on the check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on the check sheet below any lights not active at end of test.
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on the check sheet below any lights not active during test.
Block E Level 5
-
Block E Level 5 External
-
Block E Level 5 Stairwell
-
Block E Level 5 Corridor
-
Block E Level 5 Flat 91
-
Block E Level 5 Flat 92
-
Block E Level 5 Flat 94
-
Block E Level 5 Flat 95
Block E Level 6
-
Block E Level 6 Stairwell
-
Block E Level 6 Corridor
-
Block E Level 6 Flat 96
-
Block E Level 6 Flat 97
-
Block E Level 6 Flat 99
-
Block E Level 6 Flat 100
Block E Level 7
-
Block E Level 7 Stairwell
-
Block E Level 7 Corridor
-
Block E Level 7 Flat 101
-
Block E Level 7 Flat 102
-
Block E Level 7 Flat 104
-
Block E Level 7 Flat 105
Block E Level 8
-
Block E Level 8 Stairwell
-
Block E Level 8 Corridor
-
Block E Level 8 Flat 106
-
Block E Level 8 Flat 107
-
Block E Level 8 Flat 109
-
Block E Level 8 Flat 110
Block E Level 9
-
Block E Level 9 Stairwell
-
Block E Level 9 Corridor
-
Block E Level 9 111
-
Block E Level 9 Flat 112
-
Block E Level 9 Flat 114
-
Block E Level 9 Flat 115
Block E Level 10
-
Block E Level 10 Stairwell
-
Block E Level 10 Corridor
-
Block E Level 10 Flat 116
-
Block E Level 10 Flat 117
-
Block E Level 10 Plant Room
-
Add signature
Block F
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active during test.
Block F Level 5
-
Block F Level 5 External
-
Block F Level 5 Stairwell
-
Block F Level 5 Corridor
-
Block F Level 5 Flat 119
-
Block F Level 5 Flat 120
-
Block F Level 5 Flat 122
-
Block F Level 5 Flat 123
Block F Level 6
-
Block F Level 6 Stairwell
-
Block F Level 6 Corridor
-
Block F Level 6 Flat 124
-
Block F Level 6 Flat 125
-
Block F Level 6 Flat 127
-
Block F Level 6 Flat 128
Block F Level 7
-
Block F Level 7 Stairwell
-
Block F Level 7 Corridor
-
Block F Level 7 Flat 129
-
Block F Level 7 Flat 130
-
Block F Level 7 Flat 132
-
Block F Level 7 Flat 133
Block F Level 8
-
Block F Level 8 Stairwell
-
Block F Level 8 Corridor
-
Block F Level 8 Flat 134
-
Block F Level 8 Flat 135
-
Block F Level 8 Flat 137
-
Block F Level 8 Flat 138
Block F Level 9
-
Block F Level 9 Stairwell
-
Block F Level 9 Corridor
-
Block F Levelr 9 Flat 139
-
Block F Level 9 Flat 140
-
Block F Level 9 Flat 142
-
Block F Level 9 Flat 143
Block F Level 10
-
Block F Level 10 Stairwell
-
Block F Level 10 Corridor
-
Block F Level 10 Flat 144
-
Block F Level 10 Flat 145
-
Block F Level 10 Plant Room
-
Add signature
Block G
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (All emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (All emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (All emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.
Block G Level 5
-
Block G Level 5 External
-
Block G Level 5 Stairwell
-
Block G Level 5 Corridor
-
Block G Level 5 Flat 147
-
Block G Level 5 Flat 148
-
Block G Level 5 Flat 150
-
Block G Level 5 Flat 151
Block G Level 6
-
Block G Level 6 Stairwell
-
Block G Level 6 Corridor
-
Block G Level 6 Flat 152
-
Block G Level 6 Flat 153
-
Block G Level 6 Flat 155
-
Block G Level 6 Flat 156
Block G Level 7
-
Block G Level 7 Stairwell
-
Block G Level 7 Corridor
-
Block G Level 7 Flat 157
-
Block G Level 7 Flat 158
-
Block G Level 7 Flat 160
-
Block G Level 7 Flat 161
Block G Level 8
-
Block G Level 8 Stairwell
-
Block G Level 8 Corridor
-
Block G Level 8 Flat 162
-
Block G Level 8 Flat 163
-
Block G Level 8 Flat 165
-
Block G Level 8 Flat 166
Block G Level 9
-
Block G Level 9 Stairwell
-
Block G Level 9 Corridor
-
Block G Level 9 Flat 167
-
Block G Level 9 Flat 168
-
Block G Level 9 Flat 170
-
Block G Level 9 Flat 171
Block G Level 10
-
Block G Level 10 Stairwell
-
Block G Level 10 Corridor
-
Block G Level 10 Flat 172
-
Block G Level 10 Flat 173
-
Block G Level 10 Flat 175
-
Block G Level 10 Flat 176
Block G Level 11
-
Block G Level 11 Stairwell
-
Block G Level 11 Corridor
-
Block G Level 11 Flat 177
-
Block G Level 11 Flat 178
-
Block G Level 11 Plant Room
-
Add signature
Block H
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.
Block H Level 5
-
Block H Level 5 External
-
Block H Level 5 Stairwell
-
Block H Level 5 Corridor
-
Block H Level 5 Flat 180
-
Block H Level 5 Flat 181
-
Block H Level 5 Flat 183
-
Block H Level 5 Flat 184
Block H Level 6
-
Block H Level 6 Stairwell
-
Block H Level 6 Corridor
-
Block H Level 6 Flat 185
-
Block H Level 6 Flat 186
-
Block H Level 6 Flat 188
-
Block H Level 6 Flat 189
Block H Level 7
-
Block H Level 7 Stairwell
-
Block H Level 7 Corridor
-
Block H Level 7 Flat 190
-
Block H Level 7 Flat 191
-
Block H Level 7 Flat 193
-
Block H Level 7 Flat 194
Block H Level 8
-
Block H Level 8 Stairwell
-
Block H Level 8 Corridor
-
Block H Level 8 Flat 195
-
Block H Level 8 Flat 196
-
Block H Level 8 Flat 198
-
Block H Level 8 Flat 199
Block H Level 9
-
Block H Level 9 Stairwell
-
Block H Level 9 Corridor
-
Block H Level 9 Flat 200
-
Block H Level 9 Flat 201
-
Block H Level 9 Flat 203
-
Block H Level 9 Flat 204
Block H Level 10
-
Block H Level 10 Stairwell
-
Block H Level 10 Corridor
-
Block H Level 10 Flat 205
-
Block H Level 10 Flat 206
-
Block H Level 10 Plant Room
-
Add signature
Block I
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active during test.
Block I Level 5
-
Block I Level 5 Extrenal
-
Block I Level 5 Stairwell
-
Block I Level 5 Corridor
-
Block I Level 5 Flat 208
-
Block I Level 5 Flat 209
-
Block I Level 5 Flat 211
-
Block I Level 5 Flat 212
Block I Level 6
-
Block I Level 6 Stairwell
-
Block I Level 6 Corridor
-
Block I Level 6 Flat 213
-
Block I Level 6 Flat 214
-
Block I Level 6 Flat 216
-
Block I Level 6 Flat 217
Block I Level 7
-
Block I Level 7 Stairwell
-
Block I Level 7 Corridor
-
Block I Level 7 Flat 218
-
Block I Level 7 Flat 219
-
Block I Level 7 Flat 221
-
Block I Level 7 Flat 222
Block I Level 8
-
Block I Level 8 Stairwell
-
Block I Level 8 Corridor
-
Block I Level 8 Flat 223
-
Block I Level 8 Flat 224
-
Block I Level 8 Flat 226
-
Block I Level 8 Flat 227
Block I Level 9
-
Block I Level 9 Stairwell
-
Block I Level 9 Corridor
-
Block I Level 9 Flat 228
-
Block I Level 9 Flat 229
-
Block I Level 9 Plant Room
-
Add signature
Block J
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.
Block J Level 5
-
Block J Level 5 External
-
Block J Level 5 Stairwell
-
Block J Level 5 Corridor
-
Block J Level 5 Flat 231
-
Block J Level 5 Flat 232
Block J Level 6
-
Block J Level 6 Stairwell
-
Block J Level 6 Corridor
-
Block J Level 6 Flat 234
-
Block J Level 6 Flat 235
Block J Level 7
-
Block J Level 7 Stairwell
-
Block J Level 7 Corridor
-
Block J Level 7 Flat 237
-
Block J Level 7 Flat 238
Block J Level 8
-
Block J Level 8 Stairwell
-
Block J Level 8 Corridor
-
Block J Level 8 Flat 240
-
Block J Level 8 Flat 241
Block J Level 9
-
Block J Level 9 Stairwell
-
Block J Level 9 Corridor
-
Block J Level 9 Flat 243
-
Block J Level 9 Flat 244
-
Add signature
Block K
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.
Block K Level 5
-
Block K Level 5 External
-
Block K Level 5 Stairwell
-
Block K Level 5 Corridor
-
Block K Level 5 Flat 246
-
Block K Level 5 Flat 247
-
Block K Level 5 Flat 249
-
Block K Level 5 Flat 250
Block K Level 6
-
Block K Level 6 Stairwell
-
Block K Level 6 Corridor
-
Block K Level 6 Flat 251
-
Block K Level 6 Flat 252
-
Block K Level 6 Flat 254
-
Block K Level 6 Flat 255
Block K Level 7
-
Block K Level 7 Stairwell
-
Block K Level 7 Corridor
-
Block K Level 7 Flat 256
-
Block K Level 7 Flat 257
-
Block K Level 7 Flat 259
-
Block K Level 7 Flat 260
Block K Level 8
-
Block K Level 8 Stairwell
-
Block K Level 8 Corridor
-
Block K Level 8 Flat 261
-
Block K Level8 Flat 262
-
Block K Level 8 Plant Room
-
Add signature
Hubs & Stairwells
Duration Tests
-
Is this the Monthly flick test, March test or September test?
-
Date/Time Monthly test started (all emergency lights activated)
-
Date/Time Monthly test finished. Record on check sheet below any lights not active during test.
-
Date/Time 1hr duration test started (all emergency lights activated)
-
Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.
-
Date/Time 3hr duration test started (all emergency lights activated)
-
Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.
Management Suite
-
Management Suite Kitchen
-
Disabled Toilet
-
Cleaners Cupboard
-
Meeting Room
-
Management Corridor
-
Management Lobby
Level 5 Reception
-
Level 5 Reception Lift Lobby
-
Reception
-
Reception Office (Comms Room)
-
Post Room
Hub 1
-
IT Cafe
-
Gym Corridor
-
Gym
-
Hub Disabled Toilet
-
Ladies WC
-
Gents WC
-
Shower Room
Hub 2
-
Hub 2 (Event Space)
-
Hub 2 Kitchen
-
Hub 2 Fire Exit Externals
Stair 2
-
Stairwell 2 Main Staircase
-
Stairwell 2 Level 1
-
Stairwell 2 Level 2
-
Stairwell 2 Level 3
Stair 22
-
Stairwell 22 Main Staircase
Stair 23
-
Stairwell 23 Main Staircase
-
Add signature