Information

  • Document No.

  • Client/Site

  • Conducted on

  • Prepared by

  • Location

Block A

Duration tests

  • Is this the monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/time monthly test finished, record on check sheet below lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/time 3hr duration test finished, record on check sheet below lights not active at end of test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished, record on check sheet below lights not active at end of test.

Block A Level 5

  • Block A Level 5 Stairwell

  • Block A Level 5 External

Block A Level 6

  • Block A Level 6 Stairwell

  • Block A Level 6 Corridor

  • Block A Level 6 Flat 1

  • Block A Level 6 Flat 2

  • Block A Level 6 Flat 4

Block A Level 7

  • Block A Level 7 Stairwell

  • Block A Level 7 Corridor

  • Block A Level 7 Flat 5

  • Block A Level 7 Flat 6

  • Block A Level 7 Flat 8

Block A Level 8

  • Block A Level 9 Stairwell

  • Block A Level 9 Corridor

  • Block A Level 8 Flat 9

  • Block A Level 8 Flat 10

  • Block A Level 8 Flat 12

Block A Level 9

  • Block A Level 9 Stairwell

  • Block A Level 9 Corridor

  • Block A Level 9 Flat 13

  • Block A Level 9 Flat 14

  • Block A Level 9 Flat 16

Block A Level 10

  • Block A Level 10 Stairwell

  • Block A Level 10 Corridor

  • Block A Level 10 Flat 17

  • Block A Level 10 Flat 18

  • Block A Level 10 Flat 20

Block A Level 11

  • Block A Level 11 Stairwell

  • Block A Level 11 Corridor

  • Block A Level 11 Flat 21

  • Block A Level 11 Flat 22

  • Block A Level 11 Flat 24

Block A Level 12

  • Block A Level 12 Stairwell

  • Block A Level 12 Corridor

  • Block A Level 12 Flat 25

  • Block A Level 12 Flat 26

  • Block A Level 12 Flat 28

Block A Level 13

  • Block A Level 13 Stairwell

  • Block A Level 13 Corridor

  • Block A Level 13 Flat 29

  • Block A Level 13 Flat 30

  • Add signature

Block B

Duration Tests

  • Is this the monthly flick test, March test or September test?

  • Date/Time monthly test started (all emergency lights activated)

  • Date/Time monthly test finished, record on check sheet below lights not active during test

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below lights not active at end of test.

Block B Level 5

  • Block B Level 5 Stairwell

  • Block B Level 5 External

Block B Level 6

  • Block B Level 6 Stairwell

  • Block B Level 6 Corridor

  • Block B Level 6 Flat 32

  • Block B Level 6 Flat 33

  • Block B Level 6 Flat 35

  • Block B Level Flat 36

Block B Level 7

  • Block B Level 7 Stairwell

  • Block B Level 7 Corridor

  • Block B Level 7 Flat 37

  • Block B Level 7 Flat 38

  • Block B Level 7 Flat 40

  • Block B Level 7 Flat 41

Block B Level 8

  • Block B Level 8 Stairwell

  • Block B Level 8 Corridor

  • Block B Level 8 Flat 42

  • Block B Level 8 Flat 43

  • Block B Level 8 Flat 45

  • Block B Level 8 Flat 46

Block B Level 9

  • Block B Level 9 Stairwell

  • Block B Level 9 Corridor

  • Block B Level 9 Fat 47

  • Block B Level 9 Flat 48

  • Block B Level 9 Flat 50

  • Block B Level 9 Flat 51

Block B Level 10

  • Block B Level 10 Stairwell

  • Block B Level 10 Corridor

  • Block B Level 10 Flat 52

  • Block B Level 10 Flat 53

  • Block B Level 10 Plant Room

  • Add signature

Block C

Duration Tests

  • Is this the monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time duration test finished. Record on check sheet below lights not active at end of test.

Block C Level 5

  • Block C Level 5 Stairwell

  • Block C Level 5 External

Block C Level 6

  • Block C Level 6 Stairwell

  • Block C Level 6 Corridor

  • Block C Level 6 Flat 55

  • Block C Level 6 Flat 56

  • Block C Level 6 Flat 58

  • Block C Level 6 Flat 59

Block C Level 7

  • Block C Level 7 Stairwell

  • Block C Level 7 Corridor

  • Block C Level 7 Flat 60

  • Block C Level 7 Flat 61

  • Block C Level 7 Flat 63

  • Block C Level 7 Flat 64

Block C Level 8

  • Block C Level 8 Stairwell

  • Block C Level 8 Corridor

  • Block C Level 8 Flat 65

  • Block C Level 8 Flat 66

  • Add signature

Block D

Duration Test

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below lights not active at end of test.

Block D Level 5

  • Block D Level 5 External

  • Block D Level 5 Stairwell

  • Block D Level 5 Flat 68

  • Block D Level 5 Corridor

  • Block D Level 5 Flat 69

  • Block D Level 5 Flat 71

  • Block D Level 5 Flat 72

Block D Level 6

  • Block D Level 6 Stairwell

  • Block D Level 6 Corridor

  • Block D Level 6 Flat 73

  • Block D Level 6 Flat 74

  • Block D Level 6 Flat 76

  • Block D Level 6 Flat 77

Block D Level 7

  • Block D Level 7 Stairwell

  • Block D Level 7 Corridor

  • Block D Level 7 Flat 78

  • Block D Level 7 Flat 79

  • Block D Level 7 Flat 81

  • Block D Level 7 Flat 82

Block D Level 8

  • Block D Level 8 Stairwell

  • Block D Level 8 Corridor

  • Block D Level 8 Flat 83

  • Block D Level 8 Flat 84

  • Block D Level 8 Flat 86

  • Block D Level 8 Flat 87

Block D Level 9

  • Block D Level 9 Stairwell

  • Block D Level 9 Corridor

  • Block D Level 9 Flat 88

  • Block D Level 9 Flat 89

  • Block D Level 9 Plant Room

  • Add signature

Block E

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on the check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on the check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on the check sheet below any lights not active at end of test.

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on the check sheet below any lights not active during test.

Block E Level 5

  • Block E Level 5 External

  • Block E Level 5 Stairwell

  • Block E Level 5 Corridor

  • Block E Level 5 Flat 91

  • Block E Level 5 Flat 92

  • Block E Level 5 Flat 94

  • Block E Level 5 Flat 95

Block E Level 6

  • Block E Level 6 Stairwell

  • Block E Level 6 Corridor

  • Block E Level 6 Flat 96

  • Block E Level 6 Flat 97

  • Block E Level 6 Flat 99

  • Block E Level 6 Flat 100

Block E Level 7

  • Block E Level 7 Stairwell

  • Block E Level 7 Corridor

  • Block E Level 7 Flat 101

  • Block E Level 7 Flat 102

  • Block E Level 7 Flat 104

  • Block E Level 7 Flat 105

Block E Level 8

  • Block E Level 8 Stairwell

  • Block E Level 8 Corridor

  • Block E Level 8 Flat 106

  • Block E Level 8 Flat 107

  • Block E Level 8 Flat 109

  • Block E Level 8 Flat 110

Block E Level 9

  • Block E Level 9 Stairwell

  • Block E Level 9 Corridor

  • Block E Level 9 111

  • Block E Level 9 Flat 112

  • Block E Level 9 Flat 114

  • Block E Level 9 Flat 115

Block E Level 10

  • Block E Level 10 Stairwell

  • Block E Level 10 Corridor

  • Block E Level 10 Flat 116

  • Block E Level 10 Flat 117

  • Block E Level 10 Plant Room

  • Add signature

Block F

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active during test.

Block F Level 5

  • Block F Level 5 External

  • Block F Level 5 Stairwell

  • Block F Level 5 Corridor

  • Block F Level 5 Flat 119

  • Block F Level 5 Flat 120

  • Block F Level 5 Flat 122

  • Block F Level 5 Flat 123

Block F Level 6

  • Block F Level 6 Stairwell

  • Block F Level 6 Corridor

  • Block F Level 6 Flat 124

  • Block F Level 6 Flat 125

  • Block F Level 6 Flat 127

  • Block F Level 6 Flat 128

Block F Level 7

  • Block F Level 7 Stairwell

  • Block F Level 7 Corridor

  • Block F Level 7 Flat 129

  • Block F Level 7 Flat 130

  • Block F Level 7 Flat 132

  • Block F Level 7 Flat 133

Block F Level 8

  • Block F Level 8 Stairwell

  • Block F Level 8 Corridor

  • Block F Level 8 Flat 134

  • Block F Level 8 Flat 135

  • Block F Level 8 Flat 137

  • Block F Level 8 Flat 138

Block F Level 9

  • Block F Level 9 Stairwell

  • Block F Level 9 Corridor

  • Block F Levelr 9 Flat 139

  • Block F Level 9 Flat 140

  • Block F Level 9 Flat 142

  • Block F Level 9 Flat 143

Block F Level 10

  • Block F Level 10 Stairwell

  • Block F Level 10 Corridor

  • Block F Level 10 Flat 144

  • Block F Level 10 Flat 145

  • Block F Level 10 Plant Room

  • Add signature

Block G

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (All emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (All emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (All emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.

Block G Level 5

  • Block G Level 5 External

  • Block G Level 5 Stairwell

  • Block G Level 5 Corridor

  • Block G Level 5 Flat 147

  • Block G Level 5 Flat 148

  • Block G Level 5 Flat 150

  • Block G Level 5 Flat 151

Block G Level 6

  • Block G Level 6 Stairwell

  • Block G Level 6 Corridor

  • Block G Level 6 Flat 152

  • Block G Level 6 Flat 153

  • Block G Level 6 Flat 155

  • Block G Level 6 Flat 156

Block G Level 7

  • Block G Level 7 Stairwell

  • Block G Level 7 Corridor

  • Block G Level 7 Flat 157

  • Block G Level 7 Flat 158

  • Block G Level 7 Flat 160

  • Block G Level 7 Flat 161

Block G Level 8

  • Block G Level 8 Stairwell

  • Block G Level 8 Corridor

  • Block G Level 8 Flat 162

  • Block G Level 8 Flat 163

  • Block G Level 8 Flat 165

  • Block G Level 8 Flat 166

Block G Level 9

  • Block G Level 9 Stairwell

  • Block G Level 9 Corridor

  • Block G Level 9 Flat 167

  • Block G Level 9 Flat 168

  • Block G Level 9 Flat 170

  • Block G Level 9 Flat 171

Block G Level 10

  • Block G Level 10 Stairwell

  • Block G Level 10 Corridor

  • Block G Level 10 Flat 172

  • Block G Level 10 Flat 173

  • Block G Level 10 Flat 175

  • Block G Level 10 Flat 176

Block G Level 11

  • Block G Level 11 Stairwell

  • Block G Level 11 Corridor

  • Block G Level 11 Flat 177

  • Block G Level 11 Flat 178

  • Block G Level 11 Plant Room

  • Add signature

Block H

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.

Block H Level 5

  • Block H Level 5 External

  • Block H Level 5 Stairwell

  • Block H Level 5 Corridor

  • Block H Level 5 Flat 180

  • Block H Level 5 Flat 181

  • Block H Level 5 Flat 183

  • Block H Level 5 Flat 184

Block H Level 6

  • Block H Level 6 Stairwell

  • Block H Level 6 Corridor

  • Block H Level 6 Flat 185

  • Block H Level 6 Flat 186

  • Block H Level 6 Flat 188

  • Block H Level 6 Flat 189

Block H Level 7

  • Block H Level 7 Stairwell

  • Block H Level 7 Corridor

  • Block H Level 7 Flat 190

  • Block H Level 7 Flat 191

  • Block H Level 7 Flat 193

  • Block H Level 7 Flat 194

Block H Level 8

  • Block H Level 8 Stairwell

  • Block H Level 8 Corridor

  • Block H Level 8 Flat 195

  • Block H Level 8 Flat 196

  • Block H Level 8 Flat 198

  • Block H Level 8 Flat 199

Block H Level 9

  • Block H Level 9 Stairwell

  • Block H Level 9 Corridor

  • Block H Level 9 Flat 200

  • Block H Level 9 Flat 201

  • Block H Level 9 Flat 203

  • Block H Level 9 Flat 204

Block H Level 10

  • Block H Level 10 Stairwell

  • Block H Level 10 Corridor

  • Block H Level 10 Flat 205

  • Block H Level 10 Flat 206

  • Block H Level 10 Plant Room

  • Add signature

Block I

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active during test.

Block I Level 5

  • Block I Level 5 Extrenal

  • Block I Level 5 Stairwell

  • Block I Level 5 Corridor

  • Block I Level 5 Flat 208

  • Block I Level 5 Flat 209

  • Block I Level 5 Flat 211

  • Block I Level 5 Flat 212

Block I Level 6

  • Block I Level 6 Stairwell

  • Block I Level 6 Corridor

  • Block I Level 6 Flat 213

  • Block I Level 6 Flat 214

  • Block I Level 6 Flat 216

  • Block I Level 6 Flat 217

Block I Level 7

  • Block I Level 7 Stairwell

  • Block I Level 7 Corridor

  • Block I Level 7 Flat 218

  • Block I Level 7 Flat 219

  • Block I Level 7 Flat 221

  • Block I Level 7 Flat 222

Block I Level 8

  • Block I Level 8 Stairwell

  • Block I Level 8 Corridor

  • Block I Level 8 Flat 223

  • Block I Level 8 Flat 224

  • Block I Level 8 Flat 226

  • Block I Level 8 Flat 227

Block I Level 9

  • Block I Level 9 Stairwell

  • Block I Level 9 Corridor

  • Block I Level 9 Flat 228

  • Block I Level 9 Flat 229

  • Block I Level 9 Plant Room

  • Add signature

Block J

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.

Block J Level 5

  • Block J Level 5 External

  • Block J Level 5 Stairwell

  • Block J Level 5 Corridor

  • Block J Level 5 Flat 231

  • Block J Level 5 Flat 232

Block J Level 6

  • Block J Level 6 Stairwell

  • Block J Level 6 Corridor

  • Block J Level 6 Flat 234

  • Block J Level 6 Flat 235

Block J Level 7

  • Block J Level 7 Stairwell

  • Block J Level 7 Corridor

  • Block J Level 7 Flat 237

  • Block J Level 7 Flat 238

Block J Level 8

  • Block J Level 8 Stairwell

  • Block J Level 8 Corridor

  • Block J Level 8 Flat 240

  • Block J Level 8 Flat 241

Block J Level 9

  • Block J Level 9 Stairwell

  • Block J Level 9 Corridor

  • Block J Level 9 Flat 243

  • Block J Level 9 Flat 244

  • Add signature

Block K

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.

Block K Level 5

  • Block K Level 5 External

  • Block K Level 5 Stairwell

  • Block K Level 5 Corridor

  • Block K Level 5 Flat 246

  • Block K Level 5 Flat 247

  • Block K Level 5 Flat 249

  • Block K Level 5 Flat 250

Block K Level 6

  • Block K Level 6 Stairwell

  • Block K Level 6 Corridor

  • Block K Level 6 Flat 251

  • Block K Level 6 Flat 252

  • Block K Level 6 Flat 254

  • Block K Level 6 Flat 255

Block K Level 7

  • Block K Level 7 Stairwell

  • Block K Level 7 Corridor

  • Block K Level 7 Flat 256

  • Block K Level 7 Flat 257

  • Block K Level 7 Flat 259

  • Block K Level 7 Flat 260

Block K Level 8

  • Block K Level 8 Stairwell

  • Block K Level 8 Corridor

  • Block K Level 8 Flat 261

  • Block K Level8 Flat 262

  • Block K Level 8 Plant Room

  • Add signature

Hubs & Stairwells

Duration Tests

  • Is this the Monthly flick test, March test or September test?

  • Date/Time Monthly test started (all emergency lights activated)

  • Date/Time Monthly test finished. Record on check sheet below any lights not active during test.

  • Date/Time 1hr duration test started (all emergency lights activated)

  • Date/Time 1hr duration test finished. Record on check sheet below any lights not active at end of test.

  • Date/Time 3hr duration test started (all emergency lights activated)

  • Date/Time 3hr duration test finished. Record on check sheet below any lights not active at end of test.

Management Suite

  • Management Suite Kitchen

  • Disabled Toilet

  • Cleaners Cupboard

  • Meeting Room

  • Management Corridor

  • Management Lobby

Level 5 Reception

  • Level 5 Reception Lift Lobby

  • Reception

  • Reception Office (Comms Room)

  • Post Room

Hub 1

  • IT Cafe

  • Gym Corridor

  • Gym

  • Hub Disabled Toilet

  • Ladies WC

  • Gents WC

  • Shower Room

Hub 2

  • Hub 2 (Event Space)

  • Hub 2 Kitchen

  • Hub 2 Fire Exit Externals

Stair 2

  • Stairwell 2 Main Staircase

  • Stairwell 2 Level 1

  • Stairwell 2 Level 2

  • Stairwell 2 Level 3

Stair 22

  • Stairwell 22 Main Staircase

Stair 23

  • Stairwell 23 Main Staircase

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.