1 Housekeeping & Site Protection
-
1.1 Site security fencing
-
Add media
-
1.2 Site signage (at all access points)
-
Add media
-
1.3 Materials stockpiled safely & protected
-
Add media
-
1.4 Site facilities / containers / amenities
-
Add media
-
1.5 Overhead assets flagged (protected)
-
Add media
-
1.6 Segregation of workplace from public
-
Add media
2 Personal Protective Equipment
-
2.1 Helmets / Hard Hats
-
Add media
-
2.2 Reflective safety vest
-
Add media
-
2.3 Steel capped boots
-
Add media
-
2.4 Safety glasses (if required)
-
Add media
-
2.5 Flashing light (vehicles & machines)
-
Add media
3 Trenches & Excavations
-
3.1 Open excavations flagged & protected
-
Add media
-
3.2 Trenches flagged & protected
-
Add media
-
3.3 Holes & shafts flagged & protected
-
Add media
-
3.4 Edges flagged & protected
-
Add media
-
3.5 Safe access into open trench / holes
-
Add media
-
3.6 Handrails in place
-
Add media
4 Environmental Protection
-
4.1 Silt control fencing correctly installed & maintained
-
Add media
-
4.2 Protection of water bodies (straw bales / silt trap)
-
Add media
-
4.3 Stormwater inlet protection installed & maintained
-
Add media
-
4.4 Perimeter fencing around protected trees (TPZ)
-
Add media
-
4.5 Public road cleanliness (mud / dirt)
-
Add media
-
4.6 Dust control measures
-
Add media
-
4.7 Erosion control measures installed (as required)
-
Add media
-
4.8 Noise Management (complying with working hours)
-
Add media
5 Other
-
5.1 Evidence of site induction
-
Add media
-
5.2 Is traffic management in accordance with the approved TMP
-
Add media
6 Construction Items
-
6.1 Hold Points witnessed (list point e.g. proof roll of subgrade, sub-base or base material, pressure test of pipes or pits, ovality testing of pipes, On or Off maintenance inspection).
-
6.2 Design issues raised by Contractor
-
6.3 Works Instructions issue to contractor (list work instruction numbers)
-
6.4 Variations raised by Contractor
-
6.5 Works in progress
-
6.6 Note the Site Conditions
-
6.7 Other
-
Add media