Title Page

  • Customer name

  • Customer address

  • Select date

  • Prepared by

  • Date of commissioning

Inverter

  • Inverter brand and size

  • Inverter serial

  • PV module serial numbers

Grid Voltage

  • AC Voltage P1

  • AC Voltage P2 (if applicable)

  • AC Voltage P3 (if applicable)

Inverter

  • AC isolator is mounted on output of the inverter (where required)

  • AC circuit breaker mounted within the switchboard to act as the inverter main switch of the PV / Inverter system

  • Inverter installed as per manufacturers specification

  • Inverter ceasing supplying power with two seconds of a loss of AC mains

  • Inverter doesn't resume supplying power until mains have been present for more than 60 seconds. The inverter shall not go straight to full power. It is required to ramp up from 0% - 100% over a 6 minute period.

Region Setting

  • Australia A

  • Capture to country code settings for the inverter

Solar Panel

  • PV Solar panel model number

  • Panel VOC (v)

  • Panel ISC (A)

  • VOC calculation of the largest string

  • ISC calculation of largest string

  • Describe the panel layout of the system installed

MPPT trackers and string number

  • All panels connected in the same MPPT have equal number of panels

  • VOC and ISC readings of layout are within inverter and relevant Australian Standards recommendations

Testing and Commissioning

Continuity Testing

  • Circuit Checked ( in accord to Australian Standards)

Earthing

  • Earth continuity tested roof to ground

  • Earth continuity tested from inverter to ground

Array fixing

  • Array frame is certified to AS1170.2 for installation location

  • No galvanically dissimilar metal are in contact with the array frame or supports

  • Roof penetrations are suitably sealed and weatherproofed

  • PV array frame secured according to AS/NZS1170.2 wind regions manufacture's instructions

Array

  • Wiring is protected from mechanical damage and is appropriately supported

  • Exterior surface of the wiring enclosure (conduit) is labelled

  • All wiring has been tested and approved by a qualified electrician

  • All solar warning labels installed

  • All joining MC4's compatible brands

  • All low voltage wiring has been installed by a licensed electrician

String inverter

  • All correct signage and stickers have been installed

  • Exterior surface of wiring enclosures labelled 'Solar' at 2m intervals

  • Any other signage as required by local electricity distributor

System Installer

  • CEC Accredited installers name

  • CEC installers accreditation number

  • I confirm that I do hold valid and active CEC accreditation to complete the work as mentioned in this sheet

  • I verify that the above system has been installed to all relevant standards

  • Installers signature

  • Installation date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.