Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job site information
-
OSHA Poster posted , emergency action plan in-place and HardHat's Injury reporting procedures posted with contact info?
-
Training/Tool box talks conducted and documented?
-
SDS binder in-place and accessible?
-
Adequate toilet/hand washing stations?
-
Drinking water- accessible and adequate amount?
-
Site traffic control in-place, if required?
First Aid
-
First aid kits stocked, accessible and weekly inspection documented?
-
Who is the First aid trained person on site?
-
Eye wash station and Blood born pathogens kit in-place and accessible?
Housekeeping
-
General neatness of work areas and walkways?
-
Waste containers used and accessible?
-
Trip hazards identified and addressed ?
Fueling station and Fire prevention
-
Barricaded with 5' clearance around fuel tank and 12' wide path from gate to tank?
-
Fuel tank station positioned 25' from all activity and 20' from building structures/Port-a Johns
-
Fire extinguisher Class 20B accessible within 25-75' and Monthly inspection current?
-
No smoking- signs posted
Electrical
-
Electrical hazard- signs posted?
-
Condition of extension cords,bad ones removed?<br>
-
GFCI-ground fault circuit interrupters used, if required
-
Terminal boxes/panels appropriately covered
-
Underground electrical lines flagged?
-
Generator - Bonded and grounded
Hand/Power tools
-
Tools inspected regular?<br>
-
Power tools condition,cords and are they double insulated ?
-
When equipped are tool guards in place and in good working order?
-
Proper tool(s) being utilized for the job?
Ladders
-
Ladders in good working condition with legible labels?<br><br><br>
-
Used in fully open position and no use of top two rungs?<br>
-
Secured from to prevent slipping ,sliding or falling?
Heavy/equipment operations
-
Operators certified?
-
Operators manual available, equipment inspected before use and documented?
-
Seat belts used(observe)?
-
Employees NOT in struck by zone and flaggers used(observe)?
Material handling and storage
-
Proper lifting method being used(observe)?
-
materials properly stored and stacked?
Trenches, excavations and shoring
-
Who is the component person on site?
-
Daily inspections and documented?
-
ladders provided every 25'/means of egress in place?
-
Barricaded or taped off?
-
Trench depth 4' or less and spoil pile 2' from edge?
-
Equipment/materials away from edge?
PPE-personal protective equipment
-
Hard hats worn correctly?
-
Gloves and safety glasses being worn?
-
Safety toe footwear and high visibility clothing being worn?
-
Hearing protection and dust masks accessible?
-
Add signature