Title Page
-
Document No.
COMMISSIONING CHECKLIST FOR FIRE ALARM SYSTEMS - V3
-
Date
-
Address
-
Audit carried out by:
QUESTIONS
-
Comprehensive test, commissioning and configuration records?
-
Comments:
-
All devices function correctly?
-
Comments:
-
All devices function correctly (Correct Zone & Text)?
-
Comments:
-
Optical beam detectors tested?
-
Comments:
-
Sound pressure levels tested?
-
Comments:
-
Operation of remote signally checked?
-
Comments:
-
Cause and effects tested?
-
Comments:
-
All CIE functions tested?
-
Comments:
-
Manual call points- correct siting?
-
Comments:
-
Heat/ Smoke/ CO detectors - correct siting?
-
Comments:
-
Optical beam detectors- correct siting?
-
Comments:
-
Aspirating Systems- installed to manufacturer requirements?
-
Comments:
-
CIE/ Power Supplies correctly sited?
-
Comments:
-
240v supplies correct?
-
Comments:
Standby Batteries- correct capacity confirmed (record values below)
Project 1
-
Q=
-
A=
-
T(Ah)=
-
Batt (Ah)=
Project 2
-
Q=
-
A=
-
T (Ah)=
-
Batt (Ah)=
-
Standby Batteries dated with date of installation?
-
Comments:
-
Insulation Resistance Result
-
Loop Continuity Result
-
Radial Continuity Result
-
Zone plan (diagrammatic) fitted?
-
Comments:
-
As fitted drawings (all devices, cable routes shown)?
-
Comments:
-
User/ Operating instructions?
-
Comments:
-
Log book provided?
-
Comments:
-
Log book compiled? (Annexe G)
-
Comments:
-
BS 5839-1 Commissioning Certificate issued?
-
Comments:
-
Signed