Information

  • Document No.

SPC GAS QUALITY CONTROL FORM

SITE DETAILS

  • Name

  • Add location
  • Appliance 1

  • Make / Model

  • Location

  • Flue Type

CHECKLIST

  • 01. Gas meter - Location / Standard Notices?

  • Comments

  • 02. Gas tightness test - Satisfactory?

  • Comments

  • 03. Working pressure at Gas Meter and appliances confirmed?

  • Comments

  • 04. Emergency / Meter control operable?

  • Comments

  • 05. Labels - App / Gas Meter?

  • Comments

  • 06. Pipe work - Integrity and routes?

  • Comments

  • 07. Electrical cross bonding - evident?

  • Comments

  • 08. Adequate ventilation / air supply?

  • Comments

  • 09. Electrical Installation / Isolation?

  • Comments

  • 10. Four preliminary electrical test?

  • Comments

  • 11. Working pressure at appliance?

  • Comments

  • 12. Dismantle and clean appliance?

  • Comments

  • 13. Flue route?

  • Comments

  • 13a. Termination?

  • Comments

  • 13b. Integrity?

  • Comments

  • 14. Flue flow?

  • Comments

  • 15. Appliance operation safety devices - correct?

  • Comments

  • 16. Gas rate?

  • Comments

  • 16a. Burner pressure?

  • Comments

  • 17. Spillage test?

  • Comments

  • 18. Catchment space - Inspect / Size?

  • Comments

  • 19. C/H System operation - Correct?

  • Comments

  • 20. Appliance installation complies with GS (I & U) R & Man. Instructions?

  • Comments

  • 21. Cooker - Stability Device Fitted?.

  • Comments

  • 21a. Clearances?

  • Measurements

  • 22. All documentation and paperwork - Legible & Accurate - Complete?

  • Comments

  • 23. Industry unsafe situation applied?

  • Comments

  • 23a. Warning notice raised? (ID, AR, NCS)

  • Comments

  • 24. Compliance with HASAWA Req?

  • Comments

  • 25. Customer satisfaction card left / signature?

  • Comments

  • 26. Equipment - Smoke matches, labels warning etc.

  • Comments

  • 27. Service label fitted?

  • Comments

  • Add media

SUMMARY

  • Summary

  • Type of works

  • Type of audit

  • Select date

  • Engineer

Positive Reporting (Observed Audits Only)

  • In the opinion of the Auditor, has the Gas Engineer applied competence in the key gas safety areas as witnessed relevant to the scope of the work involved?

  • Has a warning notice been raised?

  • Has a RIDDOR been raised?

  • Has a referral been raised?

  • Details of further work required

  • Auditor

FM-04-33

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.