Information

  • Client / Site

  • Address
  • Location

  • Inspection No.

  • Date

  • Prepared by

Scope of works

Plumbing

  • Clients wants us to:

  • System

  • Component
  • Unit:

  • Unit to be installed:

  • Refrigerant

  • Outdoor Unit Capacity (kW)

  • Max Current (Amps)

  • Length of Total Pipe Run (m)

  • Location

  • Location

  • Height of Condensing Unit? (m)

  • Wall bracket mounting surface?

  • Choose a product

  • Indoor Unit Capacity (kW)

  • Distance between indoor/outdoor? (m)

  • *Please note additional costs may apply for distances greater than 3 metres (approx. $45 per/m)

  • Wall surface type where indoor is to be mounted/hung?

  • Wall type?

  • Optional Condensate Drain Pump

  • *condensate pumps at additional cost and is strictly recommended as a last resort if no other means of drainage is possible

  • Condensate Drain

  • Distance to Terminate Condensate Drain? (m)

  • Condensate Drain

  • Distance to Terminate Condensate Drain? (m)

Site Inspection

Site Inspection

  • Inspection

  • Site Survey
  • What is the house built on?

  • Number of levels (storeys)?

  • Storeys

  • Structural Material?

  • Roof Type?

  • Roof Accessibility?

Electrical

  • Electrician Required?

  • Circuit
  • Is the Switchboard accessible?

  • Enclosure

  • Is there room in there switchboard?

  • Power/Isolator location?

  • Distance from switchboard to isolator?

  • Circuit Breaker Rated current (Amps)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.