Information

C260 Riverwalk

  • Weekly SEQ Inspection

  • Conducted on

  • Document No.

  • Prepared by

  • Site

  • Location
  • Personnel

1) Access, Egress & Housekeeping

  • - Access and egress to work area is clear of obstruction and easily defined
    - Work areas are orderly and free from trip hazards (e.g. tools and rubbish)
    - Materials are stored in a neat and orderly state
    - General work area is clear of trip hazards and any rubbish or off-cuts do not affect access
    - Waste bins are available for use and not overflowing, correctly used
    - JHG entry signs are located at appropriate locations to work area
    - Working platform/s clear from obstructions

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

2) Behaviour & Work Habits

  • - Workers and assisting persons are wearing mandatory PPE
    - Worker is using task specific PPE
    - Worker is not taking any obvious risks
    - Right tool for the task

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

3) SQE Risk Management

  • - START Cards have been appropriately completed
    - START Cards have been reviewed by crew leader (initially)
    - TRA is present at each work location
    - Workers have signed onto the TRA
    - TRA has been reviewed (if > than one week duration)
    - AMS is available for the work team to review
    - SEP is available as required

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

4) Excavation & Trenching

  • - A current Excavation and Trenching Permit is available for any ground breaking / penetrating work activities
    - Each Plant Operator carrying out ground penetrating works has read, understood and signed the Excavation and Trenching Permit
    - Edges are appropriate battered, benched or shored
    - Stock piles are appropriate distance from edge
    - Barricades, fencing securing excavation adequate to prevent people from entering the excavation or trench

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

5) Mobile Powered Plant

  • - Daily Inspection completed and any faults recorded
    - Plant Hazard Assessment completed and available (PHA Sticker)
    - Beacons and motion alarms are operational
    - Plant operations are appropriately isolated or separated from adjacent work activities
    - Spotter is in place for plant operations where plant operation can not be controlled by other means
    - Plant operators are not operating when using a mobile phone
    - Operator holds applicable license / competency and the competency has been verified
    - Plant has fire extinguisher
    - Appropriate traffic control signage in place

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

6) Tools & Equipment

  • - Tools and Equipment are appropriate for the task being undertaken and free from obvious damage
    - Oxy / acetylene sets have flash back arresters fitted
    - Fixed / retractable blade knives are not being used (Stanley Knives)
    - Fire Extinguishers are tested every 6 months

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

7) Lifting Equipment & Operations

  • - Lifting Equipment is appropriate to the task and ready to use
    - Lifting device is tagged / identified with SWL / WLL
    - Dogman / Rigger holds the relevant competency and has been verified
    - No loads being lifted over people

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

8) Electrical & Lighting

  • - Equipment is tagged and in test date
    - RCD is fitted to mains supply or portable generators
    - Leads are run out correctly off the ground and supported on insulated stands or hooks
    - No lead extends > 35 meters and are fitted with clear shrouded plugs with LED indicator
    - Access and / or task lighting is adequate and work lights have protective cage or diffuser

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

9) Hot Works & Welding

  • - Hot Works Permit is current and available
    - Suitable fuel reduction and fire fighting provisions in place
    - Oxy and other bottles stored up right and secured
    - Oxy / Act bottles on trolley with flash back arrestors at bottle & torch + extinguisher
    - Welding signs are set out in appropriate locations
    - Weld returns completed

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

10) Working Platforms & Fall Protection

  • -Incomplete scaffold sign posted
    -Scaffold tied in at regular intervals or mobile assembled correctly using check sheet
    -Toe boards fitted when > 2m high
    -Scaffold have base-plate or screw jacks
    -Scaffolds adequately braced
    - No gaps > 225mm between perimeter edge and scaffold. <6m metres from rail (fibre glass)
    - Edges are appropriately delineated and barricaded
    - Edge protection in place is appropriate for the protection required
    - Penetrations are covered, secured and handrailed with applicable signage
    - Platform ladder in good condition, Industrial rated (120kg) and set up correctly

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

11) Work at Heights

  • - Personnel working at height are using the correct fall prevention equipment
    - Fall restraint / arrest equipment is certified and in date
    - Method of working at height follows the Hierarchy of Controls for working at height
    - Work at Height Permit has been issued and is in date
    - Work at Height / EWP Rescue Plan has been developed for the works
    - Personnel conducting work at height have been trained (within 1 year)

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

12) Chemical & Dangerous Goods

  • - Hazardous Substances are stored correctly
    - Flammable substances stored in bundled area
    - Refuelling is conducted in appropriate area with TRA in place
    - SDS's are available to the work crew and up to date
    - Are all chemicals clearly labelled
    - Spill Kit is available at the work location
    - No evidence of previous spills
    - External bunding around fuel cells are in place and free of materials/water
    - The refuelling check sheets are being filled out on the barges

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

13) Environmental Management

  • - Controls in place where there is a risk of pollution of waterways
    - Erosion and sedimentation controls are in place and in good working order
    - No evidence of polluted water leaving the work area
    - There have been no illegal discharges
    - There are no sediment plumes
    - No damage has occurred to the heritage structures
    - No contaminated soil has left the site

  • Level of compliance

  • Demonstrated Compliance / Non-Compliance Corrective actions to be entered as SQE item numbers page

  • Add media

Corrective Action

SQE Item No.1

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.2

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.3

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.4

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.5

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.6

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.7

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.8

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.9

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

SQE Item No.10

  • Discipline (SQE)

  • Observation / Hazard / Issue

  • Corrective / Remedial Action

  • Person / Contractor Responsible

  • Classification / Close-out Time Frame

Review & Sign Off

  • Persons conducting the inspection

  • Persons conducting the inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.