Title Page
-
Site conducted
-
Client
-
Project Name
-
Team
-
Inspector’s Name
-
Location
-
Date
-
Inspection Type
Construction Site SHEW Inspection
-
INSTRUCTIONS
----------------------
1. Please answer all the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link -
The focus of this inspection should not just be to record what you can see. It should be to engage with all members of the site team, talk to them, coach them, set exemplary standards and to challenge the status quo. Don't accept second best, that's when people get hurt. Lastly, don't focus so much on the inspection questions that you miss things. Take a step back and look at the bigger picture.
Client rules
-
Are site management aware of any specific client rules governing working on their sites and undertaking work on their behalf (e.g. specific PPE, security arrangements, signage, standards)? Can they tell you any of these rules? If not, why not? How are specific client rules accessed?
Previous inspection
-
Have all actions from the previous inspection been closed?
Welfare Facilities
-
Welfare facilities compliant to CDM Regs 2015?
-
Do persons on site have access to drinking water?
-
Adequate provision of Toilet rolls/ Unisex signs / Hand towels / Antiseptic wipes/ Sanitary bags.
-
Fully stocked DEB Hand Care Station
Site Documentation
-
Physical Site Files – RAMS, COSHH, Inductions, training records (if not on eSite)
-
Has full COSHH documentation including COSHH RA & MSDS been downloaded to the project files
-
Has the Supervisors iPad been synced in the last 7 days? If not, why not?
-
is the Supervisors IPad fully up to date e.g. daily site diary, toolbox talks, eqt checks, vibration monitoring etc
-
Esite set up including RAMS, COSHH, Inductions, training records (if not physical copies)
-
F10 (if required) prominently displayed
-
HSE H&S Law Poster prominently displayed
-
The most up to date versions of the health and safety, quality and environmental policies displayed (can be on eSite if facilities not large enough for multiple posters)
-
Site Fire Risk Assessment (can be part of BOP06 RA for smaller or transient sites)
-
Construction Phase Plan (proportionate to size/risk of project and regularly reviewed)
-
Temporary Works Register with working drawings / instruction
-
Relevant regular Tool Box Talk(s) given (minimum 1 per week)
-
Employers Liability Insurance Certificate prominently displayed and in date
-
Emergency Contact Details prominently displayed (including what3words site location)
-
All Stonbury employees on site have an Empowerment Card and know what it is for (sample check)
-
All workers on construction site hold a current CSCS card
-
All workers on clean water site hold a current EUSR water hygiene card
-
Persons on site know how to report a 1. Hazard/Near Miss, 2. SHEW concern, 3. Incident (confirm that Site Supervisor knows that Client must be immediately informed of incidents)
-
Persons on site are aware of Healthshield and the EAP
Site Cabin / Compound / Storage
-
Hospital Details (Nearest A&E Dept.)
-
Fully stocked and in date First Aid Box, Eye wash & Burns kit
-
Up to date Hot Topic, Safety Alert, Environ board
-
Client’s authorisation to proceed / site access authorisation
-
Fire Extinguisher(s) (adequate, correct locations, in date, signage, and either in floor, vehicle bulkhead or wall holders)
-
Enough barriers of a sufficient standard to demark compound
-
Smoking area designated in a safe location with signage and suitable fireproof waste provision
-
Waste Skip(s) in use, not overflowing, covered where required and displaying signage to indicate permitted waste contents
-
Adequate, secure storage containers (may include shipping containers/Plant safe/Strong boxes)
-
Adequate amount of Drip trays / Plant Nappies & Spill kits available in the correct locations. Locations of spill kits identified with signage
-
Gloves and goggles in each spill kit
-
Chemicals, liquids and lubricants stored on Storage Bunds
-
Gas Cylinder Cage in use where required
-
Site Security - Was the site secure when you arrived? Security should be commensurate with the risk. Were gates secured or left open for persons to trespass onto site and get hurt?
-
All HERAS fencing double clipped and correctly footed?
Signage
-
Site signage as per Encyclopaedia, Legislation, and Client Requirements
Personal Protective Equipment
-
Site team must be wearing minimum 5 points of PPE, Lace Up Safety Boots, Impact Glasses, Mechanical Protection Gloves, Hard Hat, Hi-viz upper garment
-
Additional task specific PPE being used as required
-
Persons using RPE have been fit tested
Task Specific Inspection Checklist
Site permits in place and operational
-
Confined Space
-
Permit To Dig
-
Working at Height
-
Hot Works
-
Isolation Permit
-
DSEAR
Emergency measures and rehearsals
-
Where prompt casualty evacuation may be required (confined space, trench, shaft, water etc), are measures in place commensurate with the risk?
-
Have any emergency rehearsals taken place? (not necessarily required on very short duration work e.g. less than 1 week, unless very high risk)
-
Where emergency rehearsals have taken place have these been correctly recorded on eSite? Check for full and correct completion of records.
Excavations
-
CAT & Genny scans completed using calibrated eqt (Ground Penetrating Radar on larger jobs/areas)
-
If a client requirement, the CAT data can be downloaded if required?
-
Soil, spoil, vehicles, plant and storage away from sides of excavation
-
Excavation battered back / stepped
-
Trench box / Shoring
-
Suitable access and egress
-
Fall arrest & rescue arrangements if significant depth
-
Arrangements for casualty evacuation
-
Excavation daily inspection
-
Signage / Barriers (edge protection)
Pressure Washing
-
Is pressure washing being undertaken safely and in line with current rules and procedures?
Task Specific Inspection Checklist
Work at Height
-
Scaff tag / Inspection records / Handover
-
Tower erectors PASMA trained or equivalent
-
Upper rail (minimum 950mm high), mid rail and toe boards in place on work platforms
-
PASMA Stabilisers deployed and wheels locked
-
If being used near overhead cranes etc have these been isolated (lock out/tag out)?
-
If being used near to overhead power lines is an adequate safe system of work in place?
Confined Space Entry
-
Permit to enter open and correctly completed, safety equipment operational
-
Harnesses, tripods, winches, gas monitors tagged and in date
-
Adequate Workable Rescue Plan
-
Tripod & Winch LOLER certification
-
Water Space Hygiene Equip
-
What measures are in place to stop the entry controller falling in the opening?
Plant & Work Equipment
-
Inspection / Service Records
-
Plant Register in use (can be on eSite)
-
LOLER & PUWER records
-
PAT Testing
-
Fixed electrical testing (NECIEC) of site accommodation
-
HAVs Records / Vibrational Values being recorded
-
Adequate Serviced Life Vests / Throw lines
Traffic Management
-
Traffic / Pedestrian Plan if required
-
Pedestrian routes clearly demarcated including crossing points
-
Movement of plant controlled
-
Banksman appointed
Access & Egress
-
Adequate Lighting
-
Adequate Parking with reverse parking signage displayed and followed
-
General access and egress sufficient
-
Access stairways suitable and unobstructed
-
Protection of the public commensurate with location and risk
-
Is site secure e.g. gates not left open?
-
Overhead Obstructions – Power lines (Safe systems to GS6 standard implemented)
Lifting Operations
-
Lifting Plan
-
Signaller / Slinger Appointed / banksman
-
Lifting equipment LOLER certificated
-
For mobile cranes we are using a CPA Contracted Lift unless Stonbury has supplied an Appointed Person
Manual Handling
-
Manual handling on site well controlled
Demolition
-
Demo Plans in place (can be part of CPP & method statement)
-
Asbestos Refurbishment & Demolition Survey undertaken and acted upon
-
Temporary Works - Ensure stability of structure(s)
-
Disconnection of services Isolations in place and permits issued
Environmental Controls
-
Environmental / impact Assessment / IMS on site where required
-
Waste Carriers Licence on display and in all Stonbury vehicles carrying waste
-
Waste Transfer/ Consignment Notes on site and in all Stonbury vehicles carrying waste
-
Noise / Dust / Vibration / Contamination controls (remember PPE is the last report)
Quality
-
Quality test eqt (Elecometers, Thermometers, Dewpoint Meters, Pull-Off Testers) within calibration (check tags, certificates, labels)
-
Quality records being uploaded to eSite as per the requirements of the Encyclopaedia
Additional Details
-
Comment
-
Copy of inspection upload onto portal or emailed to SHWEQ
Completion
-
Inspection Signed Off By : (Name & Signature)