Title Page
-
Conducted on
-
Conducted by - Name
-
Civil Project Number
-
Permit Number
-
Location
-
Work Description
Work Details
-
Is their a permit board with the correct information?
-
Excavation Type?
-
Weather conditions?
SLG (Signage, Lighting and Guarding)
-
Is there an NRASWA Ticket Qualified Operative on site and Supervisor contactable?
-
Have you marked all other utilities along the route of excavation?
-
Do all excavations have linked barriers to prevent access to the site from ANY direction? (including open plan, driveways and pedestrian accesses)?
-
Do all works in the road have Keep Right/Left arrows, Traffic Cones and Tapers?
-
Is SLG (Signage, lighting, Guarding) on site and placed correctly?
-
Is the signage in good condition, clean, weighted & lit (if required)?
- Yes
- No
- N/A
Traffic Management
-
Is the Traffic Management correct for the works?
-
Are the road/footway plates secure and fit for purpose?
-
Have you checked the minimum widths for traffic in the<br>carriageway?
-
Is the road closure/diversion route appropriate & approved?
-
Are Pedestrian Ramps appropriately situated and are they undamaged, Ridgely fixed or rubber edged? (if required)?
-
Is your Pedestrian Management correct and safe? (1m remaining/Ped Arrows for walkways/Footway Closed Ahead of Footway Closed or visa versa)?
PPE
-
Are they wearing the correct PPE?
General Site Safety
-
Is the site tidy, and being managed considerately?
-
Are the excavations safe?
-
Is relevant H&S documentation on site?
-
General Site Safety - Pass or Fail?
Observation and Signature
-
Observation
-
Engineer signature