Information
-
Name:
-
Heading:
-
Date:
-
Shift:
Supervisor's amd Driller's Audit
-
Has proper face preperation been done?
-
Has line been shot?
-
What are the offsets?
-
What is the actual offset on face?
-
Has grade been shot?
-
What are the offsets?
-
Is grade line painted on wall?
-
What is the distance from front plug to face?
-
Dimensions of Evacuation:
-
Length:
-
Width:
-
Height:
-
Is ventilation in good shape 50 feet from face?
-
Are atomizers being used?
-
GROUND SUPPORT & CONDITIONS
-
Is the ground support installed to standard?
-
Is the screen installed to standard?
-
Are ground conditions suitable to avoid overbreak?
-
Description of Conditions:
-
Is methane tester present?
-
Driller's Signature:
-
Supervisor's Signature: