Information

  • Document No.

  • Checklist Title

  • Council / RMD Direct Delivery

  • Sub-Contractor

  • Conducted on

  • Prepared by

  • Location

Contractors Managements Documentation

  • Relevant Quality Documentation have been reviewed or available and used onsite?

  • Project Induction completed for all site. Personnel?

  • Pre-Start Check-list completed for all Plant & Equipment ?

  • Tool Box Talk and Site Specific Risk Assessment completed?

  • Is Scope of Works correct and marked out?

Traffic Control

  • Traffic Control at Worksites 'Location Risk Assessment' Completed before starting work

  • TCP set up per approved plan, including night shift requirements?

  • Vehicle Movement Plan approved and fit for site use?

  • Traffic management plan approved and fit for site use?

  • Are there provisions for Pedestrians to travel through the worksite safely?

Profiling

  • Depth of cut is correct and verified?

  • Clean up and inspection of milled surface satisfactory?

  • Was there any Unsuitable identified?

  • Disposal of milled material to an approved site?

  • Weather and pavement conditions acceptable?

Asphalt Placement and Compaction

  • Is surface preparation completed and satisfactory?

  • Asphalt paving plan acceptable for site conditions?

  • Tack Coat application rate correct?

  • Truck Marshalling area established? (If required)

  • Reversing of vehicles on site. Is there a Spotter/Tip Man in place?

  • Asphalt mix type and temperature within specified limits?

  • Asphalt mix visually homogeneous?

  • Asphalt Traceability Record being completed?

  • Is the un-compacted layer thickness acceptable?

  • Compacted layer thickness as nominated?

  • Are all joints acceptable?

  • Rolling pattern acceptable?

Finished Pavement Properties

  • finished pavement texture acceptable?

  • Finished surface shape acceptable?

  • Ride quality acceptable?

  • Site clean up acceptable?

  • Plant and equipment parked in a safe and environmentally acceptable location?

  • Traffic control devices removed?

  • Surveillance Officer Notes

  • Surveillance Officer Signature

  • Comments follow up ( Project / Contract Manager)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.