Title Page
-
Document No.
-
Inspection Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fix-it schedule
AUTO DOOR SYSTEM
-
Monday route: Basement 3 (Qty 06)
-
Tuesday route: Basement 2 (Qty 16)
-
Wednesday route: Basement 1 (Qty 16)
-
Thursday route: Level 1 (Qty 12)
-
Friday route: Level 1 (Qty 11)
-
Saturday route: Level 2 (Qty 16)
When?
-
Week No.:
-
From: _________ to ________
Monday (Basement 3 QTY: 06)
Monday (Basement 3)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
B3-01 (Carpark MB south)
-
B3-02 (Carpark MB south):
-
B3-03 (Cargo lift lobby MB North):
-
B3-04 (Cargo lift lobby MB North):
-
B3-05 (Cargo lift lobby MB North):
-
B3-06 (Cargo lift lobby MB North):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged:
Tuesday (Basement 2 QTY: 16)
Tuesday (Basement 2)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
B2-01 (Carpark MB south near toilet):
-
B2-02 (Carpark MB south):
-
B2-03 (Carpark MB south near toilet):
-
B2-04 (Carpark MB south):
-
B2-05 (Centre near kopitiam):
-
B2-06 (City Bus MB North near Watsons):
-
B2-07 (City Bus MB North near Watsons):
-
B2-08 (City Bus MB North near toilet):
-
B2-09 (City Bus MB North near toilet):
-
B2-10 (Carpark MB North near Travellator):
-
B2-11 (Carpark MB North near Travellator):
-
B2-12 (Carpark MB North near Wilson office):
-
B2-13 (Carpark MB North near Wilson office):
-
B2/a (Basement 2 behind NTUC corridor (B/H 4 Finger):
-
B2/b (Basement 2 behind NTUC corridor):
-
B2/c (Basement 2 behind NTUC corridor):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged:
Wednesday (Basement 2 QTY: 16)
Wednesday (Basement 1)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
B1-01 (Carpark MB South):
-
B1-02 (Carpark MB South):
-
B1-03 (Carpark MB South):
-
B1-04 (Pickup Point MB South opp CPG C Office):
-
B1-05 (Pickup Point MB South opp Jet airways Office):
-
B1-06 (Pickup Point MB South opp Jet airways Office):
-
B1-07 (Pickup Point MB South opp Jet airways Office):
-
B1-08 (Pickup Point MB South opp Jet airways Office):
-
B1-09 (Pickup Point MB Centre opp SIA cabin crew Office):
-
B1-10 (Pickup Point MB Centre opp SIA cabin crew Office):
-
B1-11 (Pickup Point MB North opp United Office):
-
B1-12 (Pickup Point MB North opp United Office):
-
B1-13 (Pickup Point MB North opp United Office):
-
B1-14 (Pickup Point MB North opp United Office):
-
B1-15 (Carpark MB North):
-
B1-16 (Carpark MB North):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged:
Thursday (Level 1 QTY: 12)
Thursday (Level 1)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
L1-01 (Apron entrance MB South):
-
L1-02 (Apron entrance MB South):
-
L1-03 (Coach MB South):
-
L1-04 (Coach MB South):
-
L1-05 (Mcdonald MB South):
-
L1-06 (Taxi stand MB South opp belt 41 to 44):
-
L1-07 (Taxi stand MB South opp belt 41 to 44):
-
L1-08 (Taxi stand MB South opp belt 41 to 44):
-
L1-09 (Taxi stand MB South opp belt 41 to 44):
-
L1-10 (ICA Checkpoint arrival MB South):
-
L1-11 (ICA Checkpoint arrival MB South):
-
L1-12 (ICA Checkpoint arrival MB South):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged:
Friday (Level 1 QTY: 11)
Friday (Level 1)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
L1-13 (Centre Near robotic arm):
-
L1-14 (Centre Near robotic arm):
-
L1-15 (Taxi stand MB North opp belt 45 to 48):
-
L1-16 (Taxi stand MB North opp belt 45 to 48):
-
L1-17 (Taxi stand MB North opp belt 45 to 48):
-
L1-18 (Taxi stand MB North opp belt 45 to 48):
-
L1-19 (ICA Checkpoint Arrival MB North):
-
L1-20 (ICA Checkpoint Arrival MB North):
-
L1-21 (ICA Checkpoint Arrival MB North):
-
L1-22 (Apron Entrance MB North):
-
L1-23 (Apron Entrance MB North):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged:
Saturday (Level 2 QTY: 16)
Saturday (Level 2)
REQUIREMENTS:
-
1) Inspect the door timing for proper operation (Open 4s, Hold 5s & Close 6s).
-
2) Inspect the sensitivity of both Internal & External sensors (Inner & Outer).
-
3) Inspect the door for abnormal noise.
-
4) Visual check for any door damages.
DOOR NO.
-
L2-01 (Row no. 1 inner door MB South):
-
L2-02 (Row no. 1 Outer door MB South):
-
L2-03 (Row no. 2 inner door MB South):
-
L2-04 (Row no. 2 Outer door MB South):
-
L2-05 (Row no. 3 inner door MB South):
-
L2-06 (Row no. 3 Outer door MB South):
-
L2-07 (Row no. 4 inner door MB South):
-
L2-08 (Row no. 4 Outer door MB South):
-
L2-09 (Row no. 5 inner door MB North):
-
L2-10 (Row no. 5 Outer door MB North):
-
L2-11 (Row no. 6 inner door MB North):
-
L2-12 (Row no. 6 Outer door MB North):
-
L2-13 (Row no. 7 inner door MB North):
-
L2-14 (Row no. 7 Outer door MB North):
-
L2-15 (Row no. 8 inner door MB North):
-
L2-16 (Row no. 8 Outer door MB North):
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged: