Title Page

  • Daily Inspection Checklist Report for month:

  • Doc No. T2-ELEC-F01

  • Site:

  • Conducted on

  • Prepared by

  • Location:
  • Personnel

Select Team for Public check

Public Daily Inspection Checklist

Location: level 1&2 Public and Basement 1 Public

  • Team A/B/C:

  • SHIFT:

Public

LEVEL 2 PUBLIC

  • TIME:

  • Daylight Group 1 to 12 - F/Tube

  • TIME:

  • Kerbside Lights - CDM-T

  • TIME:

  • Airline Signage No.1 to 8 - F/Tube

  • TIME:

  • 1st Class Lounge light - CDM-TD

  • TIME:

  • High bay North - CDM-T

  • TIME:

  • High bay South - CDM-T

  • TIME:

  • PMS North - CDM-T

Level 1 Public

  • TIME:

  • Ramp Signage (Lvl 1 to Lvl 2) - Standing Sign

  • TIME:

  • Coach Stand - F/Tube & LED

  • TIME:

  • CAG Car Park - CDM-TD

  • TIME:

  • SS Pier Passageway - F/Tube / LED

  • TIME:

  • North Pier Passageway - F/Tube / LED

  • TIME:

  • Driveway - F/Tube / CDM-T

Basement 1 Public

  • TIME:

  • B1 Driveway & Passageway - F/Tube & CDM-T

  • Remarks:

  • Action Taken:

  • Checked by:

  • Engie Technical Officer (Chandra):

  • Checked & Acknowledged by (CAG Officer: Kamaruzaman):

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.