Title Page

  • Document No.

  • Inspection Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Importance Note:

  • Important note: Please activate all ACMV T.O when water level is above 2.7m* or below 1.6m**

  • * Water Tank Maximum height = 3m.

  • ** Low Level Alarm = 1.4m

MAKE-UP WATER TANK

Recording (01:00)

Time: 01:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (03:00)

Time: 03:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (05:00)

Time: 05:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (07:00)

Time: 07:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (09:00)

Time: 09:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (11:00)

Time: 11:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (13:00)

Time: 13:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (15:00)

Time: 15:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (17:00)

Time: 17:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (19:00)

Time: 19:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (21:00)

Time: 21:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Recording (23:00)

Time: 23:00

TANK LEVEL

  • TANK NO.1 LEVEL (M):

  • TANK NO.2 LEVEL (M):

MOTORS OPERATION

  • Motor condition:

Water Consumption

WATER CONSUMPTION READING( m3)

Taken on 23:59 hrs:

  • Water consumption reading (m3):

Sign off

Sign off:

  • Remarks:

  • Technician sign:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.