Title Page
-
Document No.
-
Inspection Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Importance Note:
-
Important note: Please activate all ACMV T.O when water level is above 2.7m* or below 1.6m**
-
* Water Tank Maximum height = 3m.
-
** Low Level Alarm = 1.4m
MAKE-UP WATER TANK
Recording (01:00)
Time: 01:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (03:00)
Time: 03:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (05:00)
Time: 05:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (07:00)
Time: 07:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (09:00)
Time: 09:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (11:00)
Time: 11:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (13:00)
Time: 13:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (15:00)
Time: 15:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (17:00)
Time: 17:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (19:00)
Time: 19:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (21:00)
Time: 21:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Recording (23:00)
Time: 23:00
TANK LEVEL
-
TANK NO.1 LEVEL (M):
-
TANK NO.2 LEVEL (M):
MOTORS OPERATION
-
Motor condition:
Water Consumption
WATER CONSUMPTION READING( m3)
Taken on 23:59 hrs:
-
Water consumption reading (m3):
Sign off
Sign off:
-
Remarks:
-
Technician sign: