Title Page
-
Site Name
-
Inspection Start Date
-
Inspection by
-
Document Number
-
Ground Conditions
-
Weather Conditions
INSPECTION ZONE LOCATION
-
Location
-
Field Identifier
-
Row Number - Start Row
-
Row Number - Finish Row
-
Row Number - Not Inspected
CONTRACTOR RESPONSIBLE FOR WORKS
-
Contractors Company Name
-
Main Contractor Representative
-
Contractor Representative was present during Inspection
- Yes
- No
- N/A
TABLE PROCESS INSPECTION
VERTICAL POST INSTALLATION - RAMMING PROCESS CRITERIA
-
Vertical posts are free from major damage, bashed, etc
-
Vertical posts are positioned @ site requirements GPS positioning
-
Confirm rear posts are correct type - internal & external
-
Galvanisation zinc coating is applied
- Good
- Fair
- Poor
- N/A
STRUCTURE INSTALLATION - MANUAL PROCESS CRITERIA
-
Structure materials are free from major damage, bending, bashed etc
-
Lintel slope angle is @ drawing requirements
-
Lintel front end to be no less than 700 mm from ground level
-
Structure dimensions as per manufacturer assembly manual
-
Confirm purlin is correct type and level between tables
-
Confirm squareness of spacing on purlins between tables
-
Weather bracing, supports, brackets are @ drawing requirements
TORQUE SETTING AND CONFIRMATION - MECHANICAL PROCESS
-
Torque setting equipment is calibrated and verified
-
Structure hardware visually confirmed as correct as per manufacturer assembly manual
-
Torqueing of structure has been confirmed as per manufacturer assembly manual
-
All torque set markings are present, permanent, and fully control material movement
-
Torque marking percentage completed on field
ACCEPTANCE OF TABLE INSTALLATION PROCESS
-
Voltalia Site Quality Representative - Signature
-
Date and Time of Acceptance
-
Inspection %
-
Contractor Site Supervisor Representative - Signature
-
Date and Time of Acceptance
SITE ACCEPTANCE - FOR QUALITY MANAGER USE ONLY
-
Has above inspection report been completed correctly
-
Has all relevant documents been submitted as proof of completion
-
Acceptance of completed contractors inspection report
-
Acceptance of completed photographic evidence
-
Site Quality Manager - signature
-
Date and Time of Acceptance