Title Page

  • Site Name

  • Inspection Start Date

  • Inspection by

  • Document Number

  • Ground Conditions

  • Weather Conditions

INSPECTION ZONE LOCATION

  • Location
  • Field Identifier

  • Row Number - Start Row

  • Row Number - Finish Row

  • Row Number - Not Inspected

CONTRACTOR RESPONSIBLE FOR WORKS

  • Contractors Company Name

  • Main Contractor Representative

  • Contractor Representative was present during Inspection

TABLE PROCESS INSPECTION

VERTICAL POST INSTALLATION - RAMMING PROCESS CRITERIA

  • Vertical posts are free from major damage, bashed, etc

  • Vertical posts are positioned @ site requirements GPS positioning

  • Confirm rear posts are correct type - internal & external

  • Galvanisation zinc coating is applied

STRUCTURE INSTALLATION - MANUAL PROCESS CRITERIA

  • Structure materials are free from major damage, bending, bashed etc

  • Lintel slope angle is @ drawing requirements

  • Lintel front end to be no less than 700 mm from ground level

  • Structure dimensions as per manufacturer assembly manual

  • Confirm purlin is correct type and level between tables

  • Confirm squareness of spacing on purlins between tables

  • Weather bracing, supports, brackets are @ drawing requirements

TORQUE SETTING AND CONFIRMATION - MECHANICAL PROCESS

  • Torque setting equipment is calibrated and verified

  • Structure hardware visually confirmed as correct as per manufacturer assembly manual

  • Torqueing of structure has been confirmed as per manufacturer assembly manual

  • All torque set markings are present, permanent, and fully control material movement

  • Torque marking percentage completed on field

ACCEPTANCE OF TABLE INSTALLATION PROCESS

  • Voltalia Site Quality Representative - Signature

  • Date and Time of Acceptance

  • Inspection %

  • Contractor Site Supervisor Representative - Signature

  • Date and Time of Acceptance

SITE ACCEPTANCE - FOR QUALITY MANAGER USE ONLY

  • Has above inspection report been completed correctly

  • Has all relevant documents been submitted as proof of completion

  • Acceptance of completed contractors inspection report

  • Acceptance of completed photographic evidence

  • Site Quality Manager - signature

  • Date and Time of Acceptance

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.