Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Trial reference number
-
Customer
- Tesco
- Coop
- Waitrose
- M&S
- JS
- Ginsters
- Morrisons
- Lidl
-
Select date
-
Objectives of Trial
-
Summary, Next Steps and Escalation where needed - to be completed by the Process Technologist
-
New Raw Materials into Tamar Foods
-
Any new tooling?
Cold Mix
-
CM/Dev Code
-
Version Number
-
Mixer Number
- Mixer 1
- Mixer 2
- Mixer 3
- Mixer 4
- Mixer 5
- Tote Bin
-
Batch Size
-
Amount off mixer
-
Attendees
- Brandon
- Sue
- Nick
- Steph
- Prep Team
-
Was the cold mix weighed and mixed correctly as per the recipe and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings
Pastry
-
AA/Dev Code
-
Version Number
-
Mixer Name
- Mixer 1
- Mixer 2
- Mixer 3
- Pastry Plant
-
Mix Type
-
Attendees
- Brandon
- Nick
- Sue
- Steph
- Pastry room
-
Was the pastry mix weighed and mixed correctly as per recipe and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Production
-
UB/Dev code
-
Version Number
-
Line Name?
- Pie Line 1
- Pie Line 2
- Pie Line 3
- Pie Line 4
- Rotary Pie Line
- Uni 1
- Uni 2
- Uni 3
- Off Line
-
Run Rate?
-
Number of staff?
-
Line pastry wastage percentage?
-
Attendees
- Brandon
- Nick
- Sue
- Steph
- Production Team
-
Was the product made correctly as per the costed run rate and and as per control sheet, including all weights met and within tolerance and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Ovens
-
Oven Name/Number
- Rack 1
- Rack 2
- Rack 3
- Rack 4
- Rack 5
- Rack 6
- Rack 7
- Band 1
- Band 2
- Band 3
- NPD only
-
Bake Spec Reference
-
Attendees
- Brandon
- Nick
- Sue
- Steph
- Oven Operator
-
Data Paq used?
-
Does the bake need changing?
-
Bake/Chill Loss (see master bake loss form for details)
-
Target Weight
-
Actual Weight
-
Bake/Chill Loss % Achieved
-
Pre Chill Percentage Weight Loss?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Packing high risk and low risk
-
Tick here if packing trial not done, still complete chiller number below
-
Chiller Number product stored in
-
Comark probe used?
-
High risk packing line
- Bradman 3
- Bradman 4
- Fuji 5
- Jacob White
- Fuji 1
- Fuji 2
- Fuji 3
- Fuji 4
-
Low risk packing line
-
Packing Format and type of packing used for trial
-
Run Rate?
-
Number of staff?
-
Reject levels?
-
Attendees
- Brandon
- Nick
- Sue
- Steph
- Packing Team
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Engineering
-
Was all the tooling and equipment working correctly?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Finished Product
-
Top Down Picture
-
Side View Picture
-
Cross Section Picture
-
Base Picture
-
Any other info
Sign Off
-
Process Technologist
Name:
Signature:
Date:
Head of Engineering
Name:
Signature:
Date:
PIM Prep
Name:
Signature:
Date:
PIM Production
Name:
Signature:
Date:
PIM Packing
Name:
Signature:
Date:
Technical Process Manager
Name:
Signature:
Date: