Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Personnel
-
Trial reference number
-
Customer
- Tesco
- Coop
- Waitrose
- M&S
- JS
- Ginsters
-
Select date
-
Objectives of Trial
-
Summary, Next Steps and Escalation where needed - to be completed by the Process Technologist
-
New Raw Materials into Tamar Foods
Cold Mix
-
CM/SAV Code
-
Version Number
-
Mixer name
-
Any New Tooling
-
Attendees
-
Was the cold mix weighed and mixed correctly as per the recipe and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings
Vat Cook
-
CF/SAV Code
-
Version Number
-
Vat number
-
Cooking time of the protein?
-
Any New Tooling?
-
Attendees
-
Was the vat cook weighed correctly, cooked correctly and viscosity and yield achieved as per recipe and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Pastry
-
AA/SAV Code
-
Version Number
-
Mixer Name
-
Any New Tooling?
-
Attendees
-
Was the pastry mix weighed and mixed correctly as per recipe and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Production
-
UB Code/SAV
-
Version Number
-
Line Name
-
Any New Tooling?
-
Attendees
-
Was the product made correctly as per the costed run rate and and as per control sheet, including all weights met and within tolerance and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Ovens
-
Oven Name/Number
-
Bake Spec Reference
-
Any New Tooling?
-
Attendees
-
Was the product baked correctly as per bake spec and CCP2A/2B met (using datapaq) and no adjustments needed?
-
Bake/Chill Loss (see master bake loss form for details)
-
Target Weight
-
Actual Weight
-
Bake/Chill Loss % Achieved
-
Confirms meets costings
-
Comments
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Packing high risk and low risk
-
Tick here if packing trial not done, still complete chiller number below
-
Chiller Number product stored in
-
High risk packing line
- Bradman 3
- Bradman 4
- Fuji 5
- Jacob White
- Fuji 1
- Fuji 2
- Fuji 3
- Fuji 4
-
Low risk packing line
-
Any new tooling?
-
Packing Format and type of packing used for trial
-
Attendees
-
Was the product packed correctly as per the costed run rate, the declared weight, the costed reject level and were CCP3A/3B (using datapaq or evolution probe) & 4A/4B met and no adjustments needed?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Engineering
-
Was all the tooling and equipment working correctly?
-
If no please detail modifications needed below
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Labour/Run Rates/Yield
-
Was the labour/run rates/yields in all areas as per costing?
-
If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?
Sign Off
-
Process Technologist
Name:
Signature:
Date:
Head of Engineering
Name:
Signature:
Date:
PIM Prep
Name:
Signature:
Date:
PIM Production
Name:
Signature:
Date:
PIM Packing
Name:
Signature:
Date:
Technical Process Manager
Name:
Signature:
Date:
Photo's
-
Example 1
-
Comments
-
Example 2
-
Comments
-
Example 3
-
Comments
-
Example 4
-
Comments
-
Mixer Number