Title Page

  • Audit Title

  • Conducted on

  • Prepared by

  • Bakery

  • Customer

  • Trial reference number

  • Select date

  • Objectives of Trial

  • Summary, Next Steps and Escalation where needed - to be completed by the Process Technologist

  • New Raw Materials into The Cornwall Bakery?

  • New Raw Materials into The Cornwall Bakery

  • Any new tooling?

  • New tooling?

Cold Mix

  • Does this product have a cold mix?

  • CM/Dev Code

  • Version Number

  • Mixer Number

  • Batch Size

  • Amount off mixer

  • Attendees

  • Time Taken To Weigh Up

  • Time Taken To Mix

  • Was the cold mix weighed and mixed correctly as per the recipe and no adjustments needed?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings

Vat Cook

  • Does the product have a Vat cook?

  • CF/Dev Code

  • Version Number

  • Vat number

  • Batch Size

  • Amount off mixer

  • Does the the vat cook contain protein?

  • Cooking time of the protein?

  • Viscosity?

  • Attendees

  • Time Taken To Weigh Up

  • Time Taken To Mix

  • Was the vat cook weighed correctly, cooked correctly and viscosity and yield achieved as per recipe and no adjustments needed?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Pastry

  • Does this product have a pastry mix?

  • AA/LP/Dev Code

  • Version Number

  • Mixer Name

  • Mix Type

  • Time Taken To Mix

  • Attendees

  • Was the pastry mix weighed and mixed correctly as per recipe and no adjustments needed?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Production

  • Was the product run in production?

  • UB/Dev code

  • Version Number

  • Line Name?

  • Run Rate?

  • Number of staff?

  • Line pastry wastage Percentage?

  • Fill weight range?

  • Pastry weight range?

  • Attendees

  • Was the product made correctly as per the costed run rate and and as per control sheet, including all weights met and within tolerance and no adjustments needed?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Ovens

  • Was the product baked?

  • Oven Name/Number

  • Bake Spec Reference

  • Attendees

  • Data Paq used?

  • Comark probe used?

  • Internal temperature reached?

  • Does the bake need changing?

  • Was bake loss done?

  • Bake/Chill Loss (see master bake loss form for details)

  • Target Weight

  • Actual Weight

  • Bake/Chill Loss % Achieved

  • Pre Chill Percentage Average Weight Loss?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Packing high risk and low risk

  • Packing trial carried out by process tech

  • Chiller Number product stored in

  • High risk packing line

  • Low risk packing line

  • Packing Format and type of packing used for trial

  • Run Rate?

  • Number of staff?

  • Reject levels?

  • Attendees

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Engineering

  • Was all the tooling and equipment working correctly?

  • If adjustments needed have these been approved by the Technical Process Manager and documents/product history form updated and sent to Tamar Costings?

Finished Product

  • Were finished product produced

  • Height?

  • Width?

  • Length?

  • Comments from panel?

  • Top Down Picture

  • Side View Picture

  • Cross Section Picture

  • Base Picture

  • Any other info

Sign Off

  • Process Technologist
    Name:
    Signature:
    Date:

    Head of Engineering
    Name:
    Signature:
    Date:

    PIM Prep
    Name:
    Signature:
    Date:

    PIM Production
    Name:
    Signature:
    Date:

    PIM Packing
    Name:
    Signature:
    Date:

    Technical Process Manager
    Name:
    Signature:
    Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.