Confirm all rooms remain clear of all subcontractor material storage during taping
-
Notes
-
Add media
-
Confirm cornerbeads and 093 control joints are floated at the ceiling and floor lines to minimize gaps to the T-bar and base
-
Notes
-
Add media
-
Confirm wall is finished down to floor at areas with roll-up flooring or exposed floors with no base
-
Notes
-
Add media
-
Confirm inside corners are hand sanded (walls & ceilings)
-
Notes
-
Add media
-
Check around the door and window jambs to make certain there are no chatter marks on the walls, and frames are clean of excess mud
-
Notes
-
Add media
-
Confirm walls and frames in room sand corridors are clean of excess mud from skimcoat
-
Notes
-
Add media
-
Confirm electrical boxes, etc. are clean of taping mud
-
Notes
-
Add media
-
Confirm any patches have been floated and primed by painter prior to paint
-
Notes
-
Add media
-
Confirm door and window frames are cleaned off of excess mud
-
Notes
-
Add media
-