Title Page
-
Job Number
-
General Contractor
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm trims are plumb and in plane with the wall prior to taping
-
Notes
-
Add media
-
Confirm cornerbeads and 093 control joints are floated at the ceiling and floor lines to minimize gaps to the T-bar and base
-
Notes
-
Add media
-
Confirm wall is finished to floor
-
Notes
-
Add media
-
Confirm inside corners are hand sanded
-
Notes
-
Add media
-
Confirm there are no pin holes in the mud prior to primer aplication
-
Notes
-
Add media
-
Check around the door and window jambs to make certain there are no chatter marks on the walls, and frames are clean of excess mud
-
Notes
-
Add media
-
Confirm walls and frames in room sand corridors are clean of excess mud from skimcoat
-
Notes
-
Add media
-
Confirm electrical boxes, etc. are clean of taping mud
-
Notes
-
Add media
-
Confirm floors are scraped and broom swept before primer
-
Notes
-
Add media
-
Confirm minimum temperature of 50 degrees fahrenheit maintained int he buildilng
-
Notes
-
Add media
-
Confirm adequate ventilation
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments