Title Page

  • Job Number

  • General Contractor

  • Conducted on

  • Project Manager

  • Temperature

  • Location In Building

  • Confirm trims are plumb and in plane with the wall prior to taping

  • Notes

  • Add media

  • Confirm cornerbeads and 093 control joints are floated at the ceiling and floor lines to minimize gaps to the T-bar and base

  • Notes

  • Add media

  • Confirm wall is finished to floor

  • Notes

  • Add media

  • Confirm inside corners are hand sanded

  • Notes

  • Add media

  • Confirm there are no pin holes in the mud prior to primer aplication

  • Notes

  • Add media

  • Check around the door and window jambs to make certain there are no chatter marks on the walls, and frames are clean of excess mud

  • Notes

  • Add media

  • Confirm walls and frames in room sand corridors are clean of excess mud from skimcoat

  • Notes

  • Add media

  • Confirm electrical boxes, etc. are clean of taping mud

  • Notes

  • Add media

  • Confirm floors are scraped and broom swept before primer

  • Notes

  • Add media

  • Confirm minimum temperature of 50 degrees fahrenheit maintained int he buildilng

  • Notes

  • Add media

  • Confirm adequate ventilation

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.