Title Page
-
Job Number
-
Job Name
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm MEP overhead complete and sign-off prior to ceiling framing
-
Notes
-
Add media
-
Confirm MEP rough opening layout complete
-
Notes
-
Add media
-
Confirm MEP access door layout
-
Notes
-
Add media
-
Confirm top of wall fire taping and MEP caulking complete
-
Notes
-
Add media
-
Confirm soffit trop track installed per plans and specs
-
Notes
-
Add media
-
Confirm studs are installed per plans and specs
-
Notes
-
Add media
-
Confirm materials are stocked in area
-
Notes
-
Add media
-
Confirm suspended ceilings conform to details on plans and specs
-
Notes
-
Add media
-
Confirm seismic wires and uplift posts at suspended ceiling framing
-
Notes
-
Add media
-
Confirm backing installed at items hung from ceilings
-
Notes
-
Add media
-
Confirm ceilings and soffit heights per plans and specs
-
Notes
-
Add media
-
confirm soffits are straight with jet lines, etc.
-
Notes
-
Add media
-
Confirm all lights, grilles and access door frames per plans and specs
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sheets
-
Comments