Title Page
-
Site conducted
-
Date & Time
-
Task
-
Work Area
-
Prepared by
RAIL COLLISION OR IMPACT
Fitness for Work and Fatigue Management
-
Am I fit for work and able to stay focused on the task? E.g. physical/mental wellbeing, free from the effects of fatigue and/or medication.<br>
Operator Competency
-
Do I have the required authorisation and competency (including current qualifications) for this task?
Access Control
-
Do I have authorisation to occupy this section of the rail network?<br>
-
Have I confirmed my route and my limits of authority? E.g. Occupancy permit issued, flags in place, etc<br>
-
Do the boundaries on the occupancy permit reflect the correct boundaries of the main track work zone?
Positive Communication System
-
Do I understand the required positive communication protocols/procedures for this task?
-
Is my communication device working and appropriate for the task? E.g. adequate coverage and quantity of devices<br>
-
Have I completed a positive communication test before performing the task?<br>
-
Have I discussed and agreed to the shunt plan with all team members?<br>
Positive Communication System
-
Have I confirmed three step protection before approaching, boarding or moving between railway equipment?
Isolation and Verification of Zero Energy
-
Have I followed an approved isolation procedure?<br>
-
Have I placed my personal lock onto the correct isolation point?<br>
-
Have all energy sources been identified, isolated and checked for zero energy? E.g. process flows, mechanical, stored, residual, hydraulic, pneumatic, chemical, electrical.
Securing Rolling Stock
-
When working on or near rolling stock, have I confirmed it is stable and secured to prevent uncontrolled movement? E.g. brake resistance test completed, three step protection, wheel chocks, adequate number of brakes applied.<br>
Signalling and Signage
-
Have I confirmed signalling and signage are in place in the danger zone or when working within a rail corridor ?<br>
-
Is the signalling and signage in the area I am working visible and operational? E.g. audible alarm, flags, lights etc.