  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

  • Undertaken by

  • Site Foreman

General

  • Is the construction phase health and safety plan in place?

  • Are risk assessments and method statements available for all work activities and is there evidence that the workforce have been briefed and understand them ?

  • Is it clear to visitors where they are supposed to report? Are visitors booked in?

  • Is appropriate PPE being worn ?

  • Are the F10, insurance, HSE law poster displayed?

  • Are first aid facilities available? <br>Qualified first aid personnel on site?<br>Details of nearest hospital and emergency hospital numbers?<br>

  • Is the site operating a 110v supply with test certificates in place for all temporary installations?

  • Is COSHH information available for materials being used on site ?

Site Access

  • Is the site access and egress well defined with adequate signage, fencing and hoarding?

  • Are access and egress points secured or lockable outside working hours?

  • Are access routes such as walkways, stairways and ladders well maintained and in a suitable condition ?

General Public / Others

  • Is the site enclosed, or is there other protection for the public ?

  • Are any areas where trespasser could gain access controlled and secured?

  • Are trip hazards in public areas being managed?

  • Is there adequate signage for the public? Warnings of danger, keep out, contact numbers for out of hours emergency response?

Slips and Trips

  • Are there clear designated pedestrian walkways? <br>Areas for material storage?

  • Is the site accessible, kept tidy with no materials or debris causing trip/slip hazards?

Site Traffic

  • Is there a traffic management plan in place, updated as site progresses ?<br>Have all personnel seen it?

  • Does the plan identify separate pedestrian & vehicle routes where possible?

  • Are obstacles such as excavations and scaffolds clearly marked and protected?

  • Does any plant need a banks man and if so, is there one present?

  • Have potentially dangerous slopes where machinery might slide or overturn been protected ?

  • Is there a speed limit on site?<br>Is it obeyed?

Falls from Height

  • Has safe system of work been put in place to ensure fall protection or prevention?

  • Are all open edges and holes appropriately protected to guard against falls of people and materials?

  • Have all scaffolds been erected appropriately to meet the needs of which they are constructed?<br>Are all recorded inspections / handover tickets available ?

  • Are all working platforms fully and properly boarded out? <br>Boards in good condition?

  • Are guard rails, toe boards and brick guards fitted?

  • Stored materials are evenly distributed on scaffold platforms and not excessive or above guard rails?

  • Are ladders used only as means of access, except for short duration work?

  • Are ladders secured before use to prevent slipping ?

Lifting Equipment

  • Is any lifting equipment suitable for this purpose? <br>Are weekly checks undertaken ?

  • Is the load secure?

  • Is the lifting equipment working on solid even ground ?

  • Is there certification of through examination for the crane / lifting equipment / lifting accessories ?

  • Is there a suitable lift plan and appointed person ?

Services

  • Are appropriate precautions in place to safe guard against striking services during the works ?

  • Has identification of buried services or services exposed during the works been carried out and recorded ?

  • Have all overhead lines identified and steps taken to remove, divert or line to prevent contact ?

  • Is there a permit system in place ?

  • Are all live services identified and where necessary diverted or isolated?

Environment / Spaces

  • Have confined spaces been identified?

  • Is there sufficient ventilation in the working area?

  • Have any other locations where space is restricted and could increase risk been identified?

Manual Handling

  • Have positive steps been undertaken to identify materials likely to be supplied in bulk, in unacceptably large units ( blocks,dry goods, cement) ?

  • Are workers manually lifting large items adopting team lifting?

Welfare

  • Are all welfare facilities reasonably accessible to all workers on site?

  • Is there an area available for sitting, heating water and preparing food?

  • Are there adequate numbers of toilets, wash basis with warm water, cleaners, towels and are they being maintained?

Waste Management and Environmental

  • Is a site waste management plan in place on site?

  • Is waste segregated before being removed from site ?

  • Are any water courses, drains protected from pollution?

Demolition

  • Has a demolition method statement / safety plan been produced and communicated?

  • Are operatives trained to undertake demolition works ?

  • Have services been identified and isolated by a competent person

  • Has competent structural advise been sought and measures implemented?

Excavations

  • Have excavations been inspected by a competent person before each use?

  • Is adequate shoring in place to prevent collapse ?

  • Are stop blocks in place to prevent vehicles entering excavations ?

  • Are gas detection and fume elimination measures in place?

  • Is there adequate edge protection to prevent a person falling in to an excavation?

Asbestos

  • Has a refurbishment and demolition survey been undertaken covering the full project scope including service runs?

  • Are asbestos removal works being undertaken in accordance with the rams and any details issued on the ASB5 notification?

  • Are re occupation certificates in place following asbestos works /removals ?

Tools, Plant and Equipment

  • Are persons competent and trained to use plant, equipment and tools ?

  • Have tools,plant and equipment been tested and inspected with copies of the relevant testing and inspections on site ?

  • If applicable are plant safety features present and in use such as seat belts, warning lights and roll bars?

Fire

  • Has a fire risk assessment been undertaken and a fire plan in place and displayed ?

  • Are there adequate fire extinguishers In place with means of raising an alarm and clear escape routes?

  • Is a permit to work system being operated for all hot works including a pre and post works check ?

  • No smoking enforced though out the site?

Noise

  • Have noise risk assessments been undertaken?

  • Is the appropriate PPE being worn and appropriate noise zones enforced?

Dust

  • Are measures in place to minimise dust exposure and creation ?

inductions and Training

  • Have all personnel been inducted onto the site including inductions for visitors ?

  • Are their copies of operatives training records/ certificates relevant to their works ?<br>

  • Have tool box talks been undertaken?

Company Vehicles

  • Have the vehicles checklists been undertaken?

  • Are vehicles in a safe and suitable condition?

Additional Comments

  • Additional comments ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.