Page 1: Initial questions
-
Prepared by
-
Conducted on
-
Site
-
Solarvista Job Number
-
Verisae WON
Packs
- Pack
-
Pack ID
-
Make
-
Model
-
Serial
-
Year of manufacture
-
Refrigerant Type
- CO2
- R404A
- R448A
- R407F
- R407A
- R449A
- R1270
- R290
-
Carry out F.Gas Statutory leak check.
-
Clean condensers/gas cooler Internal/external (Jet wash)
-
Date of last condenser/ gas cooler clean
-
before and after pictures of condenser/gas coolers cleaned
-
Check Condenser fan operation
-
Check plant room louvers
-
Check oil management systems and levels
-
Check and mark refrigerant levels
-
Check calibration of transducers
-
Confirm operation of compressors
-
How many compressors are faulty
-
Make of compressor
-
Model of compressor
-
Ensure plant room/area is tidy (work with supervisor / manager to assist with store where required)<br>
Cabinets
Cabinets
-
Carry out F.Gas Statutory leak check.
-
Check cabinets are operating at the correct control parameters. (check with desk engineer for any flagged parameters)<br>
-
Check all case Risers, Weir Screens / Dividers and Night blinds are in place and in good order (if not detail what is required. Cabinet Make/Asset No, Ser No. items required.<br>
-
Check cabinets for water leaks & all condensate pump trays are clear of slime, ensure kick plates are secure
-
Check integrity of case fabric. Any damage to be reported to store to raise call as well as supervisor / manager.
Coldrooms
Coldrooms
-
Carry out F.Gas Statutory leak check.
-
Check cold rooms are operating at the correct control parameters.<br>
-
Check operation of all cold rooms (work with supervisor / manager and Store to defrost where required) Ensure all fans operational, no ice build up on evaporator, no water leaks<br>
-
Check operation of evaporator and internal/external drain line heaters.
-
Check operation of Cold room floor heating systems
Store Checks
Store Checks
-
Check and review outstanding IMS / CBM alarms<br>
Record Store ambient Temperature
-
Note any Access/Egress issues and submit a NMHA form.
Signature
-
Engineers Signature
-
Date of completion