Title Page
-
Document No.
-
Technically Competent Managers Inspection Water Treatment Plant Deployment -DP3190EQ/W0016
-
6690 - National Grid Property Holdings Taplow Holder Station Mill Lane Taplow Maidenhead SL6 0AA
-
Conducted on
-
Carried out by Leigh Phillips WAMITAB's: Level 4 in waste management operations. - Managing Treatment Hazardous Waste 4TMHC - 07914 Level 4 in managing transfer operations. - TSS4 - 3100 Continuing Competence - CCC13012
COTC Coverage Time
-
Select date
-
Select date
-
Total time
Weather Observations
-
Wind:
- North
- North East
- East
- South East
- South
- South West
- West
- North West
-
Wind Strength
- None
- Low
- Moderate
- Strong / Gusting
- High Winds
-
General Ground Conditions
- Dry
- Damp
- Wet
- Flooded
- Snow Covered
-
General Weather Conditions
- Clear, sunny
- Slight cloud
- Cloudy
- Cloudy, light rain
- Cloudy, moderate rain
- Cloudy, heavy rain
- Cloudy, snow
Compliance To Deployment / Permit
-
Is there adequate management cover on project?<br>
-
Has the Regulator visited site since the last visit?
-
Is this being recorded?
-
Are deployment details on display and clear?
-
Can all key members of staff demonstrate they understand the limits and represents of the permit?
-
Add media
Permit / Deployment Compliance
-
Is the Local Water Company Discharge Consent on display and / or on file?
-
Are the permitted areas located as per deployment plans?
-
Is there no visible integration with the River Thames?
-
Is housekeeping sufficient and compliant to the deployment and general environmental protection?
-
Are permitted and adjacent areas tidy?
-
Are spill kits and spill protection systems and testing in place?
-
Are materials storage areas compliant and as per the submitted plan?
-
Is there any sign of, or potential of loss of containment in the storage areas?
-
Add media
Materials Testing
-
Can the project demonstrate effective testing to confirm compliance?
-
Are prior test results held and organised?
-
Is the testing house credentials available for review?
-
Are exceeded test levels highlighted where found and changes made to the soils and water treatment?
-
Add media
Summary
-
Are there any other areas of concern that may directly or indirectly impact the permitted areas of operation?
-
Have you recorded attendance details in the site diary?
-
Add signature
-
*** Please note - This inspection is for internal use only. Further permission must be sought prior to releasing this inspection to internal factors ***