Title Page
-
Document No.
-
Technically Competent Managers Inspection
-
D7887 High Speed 2, Old Oak Common Project
-
Conducted on
-
Technically Competent Manager:
- Raj Patel
- Shaun Bean WAMITAB Level 4 S/N 601/8502/8
COTC Coverage Time
-
Arrival on project
-
Departure from project
-
Total time
Weather Observations
-
Wind:
- North
- North East
- East
- South East
- South
- South West
- West
- North West
-
Wind Strength
- None
- Low
- Moderate
- Strong / Gusting
- High Winds
-
General Ground Conditions
- Dry
- Damp
- Wet
- Flooded
- Snow Covered
-
General Weather Conditions
- Clear, sunny
- Slight cloud
- Cloudy
- Cloudy, light rain
- Cloudy, moderate rain
- Cloudy, heavy rain
- Cloudy, snow
Compliance To Deployment / Permit
-
Is there adequate management cover on project?<br>
-
Has the Regulator visited site since the last visit?
-
Is this being recorded?
-
Are deployment details on display and clear?
-
Can all key members of staff demonstrate they understand the limits and represents of the permit?
-
Add media
Permit / Deployment Compliance
-
Is the Local Water Company Discharge Consent on display and / or on file?
-
Are the permitted areas located as per the deployment plans?
-
Is there no visible integration with any water course?
-
Is housekeeping sufficient and compliant to the deployment and general environmental protection?
-
Are permitted and adjacent areas tidy?
-
Are spill kits and spill protection systems and testing in place?
-
Are materials storage areas compliant and as per the submitted plan?
-
Is there any sign of, or potential of loss of containment in the storage areas?
-
Is there effective emissions mitigation in place (dust control, etc)?
-
Add media
Materials Testing
-
Can the project demonstrate effective testing to confirm compliance?
-
Are prior test results held and organised?
-
Is the testing house credentials available for review?
-
If there are exceeded test levels highlighted where found and changes made to the soils and water treatment?
-
Is the Material Management Plan updated and reflective of the works being undertaken?
-
Add media
Waste Compliance
-
Are waste transfer notes, both hazardous or non-hazardous, compliant?
-
Is related waste segregated and stored compliantly?
-
Are waste notes being recorded onto the waste log on the IMS?
Summary
-
Are there any other areas of concern that may directly or indirectly impact the permitted areas of operation?
-
Have you recorded attendance details in the site diary?
-
Is there any other issues, either directly or indirectly, affecting or have the potential to affect permitted operations?
-
Add signature
-