Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by:
-
Location
General
-
Certificates of Competency are current and personnel have correct qualifications to carry out the work in relation to the scope of works.
-
Verify work activity is documented correctly on pre-start, site plan/s, pre work briefing, SWMS etc.
-
Verify worksite protection used is adequate for activities undertaken (fencing, barricading, traffic control) under the worksite plan documented for the work being conducted.
-
Confirm all workers have been inducted and signed on to worksite briefings / pre-starts (Check controls are applied).
-
Check PPE is worn and adequate for current activities. Complies with TfNSW and BPL requirements.
-
Check work permits are in place if applicable. Ensure all appropriate personnel have signed on and understand the procedures.
Working at heights
-
Fall risks of 2m or more (including voids, pits & trenches) are controlled. Check if there is sufficient edge protection.
-
Working at heights permit for harness as primary control
Plant & Equipment
-
Plant is compliant with project requirements. (BPL sticker, Quackers, flashing beacon, SWL, fire extinguishers, guarding, quick hitch, log books, servicing & maintenance regime)
-
Plant people separation, OHW/ underground services, loading out, radio communication, exclusion zones
Scaffolds
-
Scaff tag in place and checked monthly
-
Licensed persons erecting scaffold above 4m
-
Check if all components are in place as per manufactures instructions and COP/AS for erection ( handrails- top, mid and toe boards, braces, tie-backs, base plates etc.)
-
SWL not exceeded, are materials stored in access ways, site plan and used for access or work platforms.
Lifting Equipment
-
Loads lifted over persons, close proximity to obstacles including OHW and other services.
-
Lifting radius and exclusion zones established to protect authorised entry
-
Maintenance, testing & inspection and daily inspection protocol.
-
SWL information displayed as per Australian standards.
-
Licensed operators including Dog- man, VOC
Harness & Equipment
-
VOC for formal training of operators
-
Anchor points certified, in use and fit for task
-
Permit to work in place
-
Compatible equipment / hooks, inspection protocol for equipment, damaged or unsafe equipment
Ladders
-
Unsafe or damaged ladders, unsafe positioning, ladders not secured properly, appropriate ladders for the task.
Hazardous Manual Tasks
-
Lack of identification of hazardous manual tasks, risk assessment and inadequate risk controls (no job rotation, trolleys, lifting equipment)
-
Training, risk controls, safe lifting / team lifting techniques.
Hazardous Chemicals (including fuel & oil)
-
Storage location (flammables near ignition sources, spills, near stormwater drains or water ways, etc)
-
Storing incompatible chemicals near each other
-
Adequate spill containment equipment or bunds.
-
Safety Data sheets accessible on site
-
Lack of emergency procedures for injury/spills/fire etc.
-
Excessive quantities stored on site or in vehicles, adequate bunds in place.
-
Sufficient ventilation, vents on container PPE as per SDS etc.
Emergency Response
-
Emergency plans site specific, closest medical centre known
-
Emergency procedures displayed at site or noted / briefed at pre-starts.
-
Training & rehearsal of emergency plans/ evacuation
-
Adequate First Aid equipment on site / trained nominated first aiders on site.
Traffic Management
-
Site specific traffic management Plan (TMP) in place
-
Communication of TMP for all persons on site (contractors, visitors etc.)
-
Live traffic separation from worksite, TMP addresses location and speed of traffic at worksite
-
Pedestrian access is maintained/ considered in plan
-
Adequate controls for TMP (physical barriers, bollards, speed limits, flashing lights, spotters)
Personal Protective Equipment (PPE)
-
System to issue, inspect, replace & monitor adequate PPE for activity including sun protection.
-
Use as per SWMS & BPL requirements/tasks etc.
Work Environment
-
Amenities (toilets, wash areas, lunch rooms etc)
-
Task lighting, housekeeping etc.
-
Adequate noise, vibration and dust control.
Electrical Hazards
-
Electrical leads and tools (damaged, out of test date or untested)
-
Leads placed on ground, work surfaces, sharp or metal structures, no isolating hooks.
-
ELCB, RCD protection and double adapters or overloading outlets
-
Electrical leads/equipment near water, flammables, chemicals or that may be damaged from contact with moving machinery or plant.
-
Close proximity to OHW or contact with OHW or underground assets.
-
Lock-out /tag-out (LOTO) procedures for electrical equipment.
Environmental Hazards
-
Lack of or inadequate training in EMP /CEMP & EPL requirements
-
Dust suppression
-
System to prevent contaminants entering stormwater, waterways or exiting site (sediment controls)
-
Water re-use systems
-
Air monitoring as required (ACM removal, high dust etc)
Administrative Procedures
-
Site safety plans (demolition plan, asbestos control & removal plan etc)
-
Appropriate work permits (council, EPA- minor works, RMS, hot works, confined space etc)
-
Induction & consultative arrangements (pre-starts, start cards etc) with workers, contractors, visitors etc.
-
Signed SWMS for planned activities (High risk works) for all workers, contractors on site and appropriate BPL review of SWMS as needed.
-
Adequate supervisory arrangements, training, skills, experience and licenses.
-
Adequate routine monitoring of activities, site inspections and audits.
-
Adequate incident notification procedures / processes as per TfNSW.
Demolition
-
Adequate plans in place, WorkCover notification, licensed operator etc.
-
Traffic control
-
Controls for tracking of dirt onto roadways
ACM
-
Appropriate plans (removal & control) in place.
-
Relevant training & licensing.
Corrective Actions
-
List corrective actions
Sign off
-
Signature of all Site Representatives
-
Signature of Person who conducted the Audit