Title Page

  • Week commence

  • Completed by

Daily check basement pump room P3 level - area in safe condition - pumps working (test manual controls) - water meter working - no leaks.

  • Mark as inspected

  • Weekly observations

  • Add follow up information

  • Weekly cold water check temperature in tank

  • Date checked

Daily check hot water systems North plant area - Andrews water heaters and pool heating system North roof - area in safe condition - boilers normal operation?

  • Mark as inspected

  • Weekly observations

  • Add follow up information

  • Weekly hot water temperature check from cylinder

  • Date checked

Daily check pool plant area North roof - area in safe condition - filters normal operation - HTH tank normal condition

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Tuesday check - PPE present and in good order - eye wash station present and in good order, in date?

  • PPE/eye wash check

  • Add follow up information

Daily check AC systems North roof plant area - area in safe condition - plant normal operation

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Daily check hot water systems south plant area - Raypack water heaters - area in safe condition - boilers normal operation?

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Daily check AC systems South plant area - area in safe condition - plant normal operation

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Daily checks poolside pump plant room - area in safe condition - dosing unit operating correct - pumps operating as normal

  • Mark as inspected

  • Weekly observations

  • Add follow up information

  • Eye wash station check - present and in good order, in date?

  • Add follow up information

Daily checks steam and sauna plant room - area in safe condition - dosing unit operating correct - pumps operating as normal

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Daily check workshop area - safe condition - tidy - tools put away - bench drill and grinder locked - PPE in place where required?

  • Mark as inspected

  • Weekly observations

  • Add follow up information

Weekly ladder checks

  • Only trained employees are allowed to use ladders and anyone using ladders must carry out their own pre-safety check of the ladder they intend to use. When ladders are not being used they must be locked away to restrict access.

  • Check that ladders are in good order and safe to be used.

  • Add follow up information

  • Date checked

  • Add signature

Weekly electrical cupboards/plant rooms

  • Inspect electrical intake cupboards and plant rooms for safety and good housekeeping

  • Electrical intake plant room North

  • Add follow up information

  • Add media

  • Electrical intake plant room South

  • Add follow up information

  • Add media

  • Electrical cupboard by combat area

  • Add follow up information

  • Add media

  • Electrical cupboard kitchen fire exit

  • Add follow up information

  • Add media

  • Electrical cupboard team room corridor

  • Add follow up information

  • Add media

  • Sign as completed

Legionella control

  • Shower heads must be checked weekly to ensure that they are free from any scale build up and in good working order. Shower controls must be checked weekly for correct operation, useable and in safe condition.

  • Complete checks

  • Shower heads in men’s free from scale and in good order?<br>Shower controls operating properly, useable and in safe condition?

  • Add follow up information

  • Shower heads in ladies free from scale and in good order?<br>Shower controls operating properly, useable and in safe condition?

  • Add follow up information

  • Shower heads in Spa free from scale and in good order?<br>Shower controls operating properly, useable and in safe condition?

  • Add follow up information

  • Cold water tank temperature be 20* or lower

  • Hot water temperature should be 50* or higher

  • Select date

  • Add signature

  • Pool backwashed?

  • Date and time

  • Completed ok?

  • Sign as completed

Any other information and sign off for the week

  • Any handover information or updates?

  • Add media

  • Sign as completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.